ML20087D263

From kanterella
Revision as of 13:44, 14 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards McGuire Nuclear Station Unit 2 Startup Rept, Addressing Results of Startup Testing from Initial Fuel Loading Through Testing at 90% Full Power.Supplementary Repts Will Be Submitted Every 3 Months Until Operation
ML20087D263
Person / Time
Site: Mcguire
Issue date: 02/08/1984
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20087D266 List:
References
NUDOCS 8403130341
Download: ML20087D263 (1)


Text

. . . - .

DUKE POWER GOMPANY P.O. box 33189 CHARLOTTE. N.C. 28242 HAL B. TUCKER TELEPHONE

_ y, == a February 8, 1984 (*) ="

Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission jRegion II 101 Marietta. Street NW, Suite'2900 Atlanta, Georgia 30303 Re: McGuire Nuclear Station Unit 2 Docket No. 50-370 Startup Report

Dear Mr. O'Reilly:

Pursuant to Technical Specifications 6.9.1.1, 6.9.1.2, and 6.9.1.3, attached

} are 2 copies of the Startup Report for McGuire Nuclear Station-Unit 2. This L. report was prepared in accordance with the requirements of Technical Specifi-

~

cation 6.9.1 and addresses the results of startup testing from initial fuel t -loading through testing at the 90% full power level. At this time, testing s

at the 100% power level has not been started. Accordingly, pursuant to p T.S. 6.9.1~.3,~ supplementary reports will be submitted at least every 3 months unt.il completion of all power escalation testing and commencement of commercial

$P ' operation. The first supplemental report keeping you apprised of the progress of this testing will be filed by May 8, 1984.

y Please advise if there are any questions concerning this report.

I9 Very.truly yours,

- WE. /"d / g Hal B. Tucker

, PBN:jfw Attachment-cc: Document Control Desk (36) Mr. W. T. Orders j' U. S. Nuclear Regulatory Commission NRC Resident Inspector Washington, D. C. 20555 McGuire Nuclear Station Mr. R. A. Birkel Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

^

8403130341 840208 PDR ADOCK 05000370 P PDR

. t%

?%

^

= . - . . _ .