ML033500131

From kanterella
Revision as of 03:53, 20 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
November 2003 Monthly Operating Report for San Onofre Units 2 and 3
ML033500131
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/11/2003
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML033500131 (9)


Text

- - SOUTHERN CALIFORNIA A. Edward Scherer n EDDI SON Manager of Nuclear Regulatory Affairs An EDISONE'INTER.NATIONVAL(K Company December 11, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for November 2003 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15, this letter provides the Monthly Operating Reports for November 2003 for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.

If you have any questions, please contact Mr. Geoff Cook at (949) 368-7571.

Sincerely, Attachments 1 & 2 cc: B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92674-0128 A-tf' -4 949-368-7501 Fax 949-368-7575

Attachment I Monthly Operating Report, November 2003 San Onofre Nuclear Generating Station, Unit 2

MONTHLY OPERATING REPORT Docket No: 50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 2 UNIT 2 Date: December 11, 2003 November 2003 Completed by: G. Cook Telephone: (949) 368-7571 Page 2 of 4 OPERATING DATA REPORT I 1 Design Electrical Rating (Net MWe) l 1070 2 l Maximum Dependable Capacity(Net MWe) l 1070 l This Month Yr-to-Date Cumulative 3 Number of Hours in Period 720 8,016 177,841 4 Number of Hours Reactor Was Critical* 720 7,960 145,029 5 Hours Generator On-line* 720 7,927 143,186 6 Unit Reserve Shutdown Hours 0 0 0 7 Net Electrical Energy Generated (MWh)* 809,521 8,873,504 153,276,977

  • Rounded

MONTHLY OPERATING REPORT Docket No: 50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 2 UNIT 2 Date: December 11, 2003 November 2003 Completed by: G. Cook Telephone: (949) 368-7571 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YYIMMDD) N/A Type 1) NIA Duration (Hours) N/A Reason (2) N/A Method of Shutting Down the Reactor (3) N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any) ___

(1) F-Forced S-Scheduled (2) Reason: A-Equipment Failure (Explain)

B-Maintenance or Test G-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operatkoa Error (Explain)

H-Other (Explain)

(3) Method: 1 Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

MONTHLY OPERATING REPORT Docket No: 50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 2 UNIT 2 Date: December 11, 2003 November 2003 Completed by: G. Cook Telephone: (949) 368-7571 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 11/01/03 0000 Unitin Mode 1.

11/30/03 2400 Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.

Attachment 2 Monthly Operating Report, November 2003 San Onofre Nuclear Generating Station, Unit 3

MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 3 UNIT 3 Date: December 11, 2003 November 2003 Completed by: G. Cook Telephone: (949) 368-7571 Page 2 of 4 OPERATING DATA REPORT I1 Design Electrical Rating (Net MWe) I 1080 2 lMaximum Dependable Capacity(Net MWe) l 1080 l This Month Yr-to-Date Cumulative 3 Number of Hours in Period 720 8,016 172,392 4 Number of Hours Reactor Was Critical* 720 7,026 142,603 5 Hours Generator On-line* 720 6,997 140,476 6 Unit Reserve Shutdown Hours 0 0 0 7_ Net Electrical Energy Generated (MWh)* 792,379 7,764,452 148,700,394

  • Rounded

MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 3 UNIT 3 Date: December 11, 2003 November 2003 Completed by: G. Cook Telephone: (949) 368-7571 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YY1MM/DD) N/A Type () N/A Duration (Hours) N/A Reason (2) N/A Method of Shutting Down the Reactor (3) N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any) ___

(1) F-Forced S-Scheduled (2) Reason: A-Equipment Failure (Explain)

B-Maintenance or Test C-Reeling D-Regulatory Restriction E-Operator Training & Ucense Examination F-Administrative G-Operationl Error (Explain)

H-Other (Explain)

(3) Method: I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 3 UNIT 3 Date: December 11, 2003 November 2003 Completed by: G. Cook Telephone: (949) 368-7571 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 11/01/03 0000 Unit in Mode 1.

11/30/03 2400 Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.