January 2004 Monthly Operating Report for San Onofre Nuclear Generating Station, Units 2 and 3
ML040490226
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/13/2004
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML040490226 (9)


Text

SOUTHERN CALIFORNIA EDISON C

An EDISON INTERNA TIONALt Company A. Edward Scherer Manager of Nuclear Regulatory Affairs February 13, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for January 2004 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15, this letter provides the Monthly Operating Reports for January 2004 for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.

If you have any questions, please contact Mr. Geoff Cook at (949) 368-7571.

Sincerely, Attachments 1 & 2 cc:

B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-7575

Attachment I Monthly Operating Report, January 2004 San Onofre Nuclear Generating Station, Unit 2

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 January 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 February 13, 2004 G. Cook (949) 368-7571 Page 2 of 4 OPERATING DATA REPORT I 1 l Design Electrical Rating (Net MWe) l 1070 2 1 Maximum Dependable Capacity(Net MWe) l 1070 l

This Month Yr-to-Date Cumulative 3

Number of Hours in Period 744 744 179,329 4

Number of Hours Reactor Was Critical*

744 744 146,517 5

Hours Generator On-line*

744 744 144,674 6

Unit Reserve Shutdown Hours 0

0 0

7 Net Electrical Energy Generated (MWh)*

837,927 837,927 154,953,884

  • Rounded

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 January 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 February 13, 2004 G. Cook (949) 368-7571 Page 3 of 4 UNIT SHUTDOWNS Number NIA Date (YY/MM DD)

N/A Type (1)

N/A Duration (Hours)

  • N/A Reason (2)

N/A Method of Shutting Down the Reactor (3)

N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)

I__

  • Rounded (1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Ucense Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(3) Method:

1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 January 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 February 13, 2004 G. Cook (949) 368-7571 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 01/01/04 l 0000 I Unitin Mode 1.

lI1 01/31/04 l 2400 l Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.

Monthly Operating Report, January 2004 San Onofre Nuclear Generating Station, Unit 3

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 January 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 February 13, 2004 G. Cook (949) 368-7571 Page 2 of 4 OPERATING DATA REPORT I

I Design Electrical Rating (Net MWe) 1 1080 2

Maximum Dependable Capacity (Net MWe) 1080 This Month Yr-to-Date Cumulative 3

Number of Hours in Period 744 744 173,880 4

Number of Hours Reactor Was Critical*

583 583 143,930 5

Hours Generator On-line*

573 573 141,793 6

Unit Reserve Shutdown Hours 0

0 0

7 Net Electrical Energy Generated (MWh)*

637,290 637,290 150,169,500

  • Rounded

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 January 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 February 13, 2004 G. Cook (949) 368-7571 Page 3 of 4 UNIT SHUTDOWNS Number 2004-01 Date (YY/MMWDD) 04/01/24 Type (1)

F Duration (Hours)

  • 171.0 Reason (2)

A Method of Shutting Down the Reactor (3) 1 Cause/Corrective Actions/Comments Shutdown needed to repair a minor leak (Include LER number, if any) in the Chemical and Volume Control

_System inside the containment building.

  • Rounded (1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Ucense Examination F-AdmInisrative G-Operatlonal Error (Explain)

H4-her (Explain)

(3) Method:

1-Manual 2-Manual Trip/Scram 3-Automatic TriplScram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

I MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 January 2004 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 February 13, 2004 G. Cook (949) 368-7571 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 01101/04 0000 Unit in Mode I at essentially full power.

01/24/04 1222 Commenced Unit 3 shutdown to repair a minor leak in the Chemical and Volume Control System (CVCS) inside the containment building.

01/24/04 1956 Manually tripped Main Turbine and Generator. Unit offline.

01/24/04 1958 Manually tripped Reactor from approximately 15% power. Unit entered Mode 3.

01/25/04 0920 Unit entered Mode 4.

01/30104 1204 Unit entered Mode 3.

01/31/04 1229 Unit entered Mode 2.

01/31/04 1326 Reactor critical.

01/31/04 1644 Unit entered Mode 1.

01/31/04 2254 Generator synchronized to the grid.

01/31/04 2400 Unit in Mode I at reduced power.

Note: There were no challenges to the pressurizer safety valves during the month.