ML23094A133

From kanterella
Jump to navigation Jump to search
Nuclear Property Insurance
ML23094A133
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/29/2023
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML23094A133 (1)


Text

Al Bates An EDISON INTERNATIONAL~ Company Manager, Nuclear Regulatory Affairs

& Technical Assistant to the CNO ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555~0001 March 29, 2023

Subject:

Docket Nos. 50-206, 50-361 and 50-362 Nuclear Property Insurance San Onofre Nuclear Generating Station Units 1, 2, and 3

Dear Sir or Madam:

10 CFR 50.54 This letter is the report required by 10 CFR 50.54(w)(3). The following Nuclear Property and Decontamination Liability Insurance will be in effect for the San Onofre Nuclear Generating Station on the April 1, 2023 policy renewal date:

Policy (Amount)

Primary Property and Decontamination Liability Insurance Policy

($130 million)

Source Nuclear Electric Insurance Limited (NEIL Primary)

This amount of Nuclear Property and Decontamination Liability Insurance is unchanged from the previous year.

The policy providing coverage mentioned above complies with 10 CFR 50.54(w), including provisions for the insurance proceeds to be prioritized for dedicated reactor stabilization/safety and then for decontamination of the site.

There are no commitments contained in this letter.

If you have any questions or require additional information, please contact me at 949-368-7024.

cc:

R. J. Lewis, Regional Administrator, NRC Region IV A M. Snyder, NRC Project Manager, San Onofre Units 1, 2, and 3 Nmssol

~~ol

~~R_