ML032670985

From kanterella
Jump to navigation Jump to search
August 2003 Monthly Operating Report for San Onofre, Units 2 and 3
ML032670985
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/15/2003
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML032670985 (9)


Text

ri SOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONALS Company A. Edward Scherer Manager of Nuclear Regulatory Affairs September 15, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for August 2003 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-1 0 and NPF-15, this letter provides the Monthly Operating Report for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.

If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.

Sincerely, Attachments 1 & 2 cc:

T. P. Gwynn, Acting Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-7575

'<6q

Attachment I NRC Monthly Operating Report, August 2003 San Onofre Nuclear Generating Station, Unit 2

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 August 2003 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 September 15, 2003 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I

Design Electrical Rating (Net MWe) l 1070 2

Maximum Dependable Capacity (Net MWe) 1070 This Month Yr-to-Date Cumulative 3

Number of Hours in Period 744 5,831 175,656 4

Number of Hours Reactor Was Ciodical 744 5,775 142,844 5

Hours Generator On-line

  • 744 5,742 141,001 6

Unit Reserve Shutdown Hours

  • 0 0

0 7__

Net Electrical Energy Generated (MWh)

  • 833,948 6,423,509 150,826,982
  • Rounded

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 August 2003 Docket No:

50-361 Unit Name:

SONGS - 2 Date:

September 15, 2003 Completed by: C. E. Williams Telephone:

(949) 38-6707 Page 3 of 4 UNIT SHUTDOWNS Number NIA Date (YY/MMlDD)

NIA Type (1)

NfA Duration (Hours)

NJA Reason (2)

INA Method of Shutting Down the Reactor (3)

NJA CauselCorrective ActionslComments NA (Include LER number, if any)

(1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance o Test C-Refuein D-Regulatory Restticuon E-Operator Trannt & License Exandnation F-AdministratIve G0ratonal Eo (Eain)

H-r (Explin)

(3) Method:

1-Manual 2-Manual TdpnScmm 3Autoatic TdplScm 4-Continuation *om Previlous Month (Explain)

Ulw Xxpahn)

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 August 2003 Docket No:

50-361 Unit Name:

SONGS - 2 Date:

September 15, 2003 Completed by: C. E. Williams Telephone:

(949) 3686707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 08101103 10001 Unit in Mode 1.

08/31103 2400 Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.

NRC Monthly Operating Report, August 2003 San Onofre Nuclear Generating Station, Unit 3

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 August 2003 Docket No:

50-362 Unit Name:

SONGS - 3 Date:

September 15, 2003 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I I Design Electrical Rating (Net MWe) l 1080 l 2 Madmum Dependable Capaci (Net MWe)

I 1080 This Month Yr-to-Date Cumulative 3

Number of Hours in Period J

744 5,831 170,207 4

Number of Hours Reactor Was Critical

  • 744 4,841 140,418 5

Hours Generator On-line

  • 744 4,812 138,291 6

Unit Reserve Shutdown Hours

  • 0 0

0 7

Net Electrical Energy Generated (MWh)

  • 833,845 5,335,377 146,271,318
  • Rounded

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 August 2003 Docket No:

50-362 Unit Name:

SONGS-3 Date:

September 15, 2003 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YY/MMIDD)

NIA Type (1)

N/A Duration (Hours)

N/A Reason (2)

N/A Method of Shutting Down the Reactor (3)

NIA CauselCorrective Actions/Comments N/A (Include LER number, if any)

(1) F-Forced S-Scheduled (2) Reason:

A-Equipmern Failure (Explain) 8Mainenance or Test C-Refueling D-Regulatoy Restrcton E-Operdor Training & iensExaEmnaton F-Adminisbatie I0penational Enfor (Explain)

H-Othe (Explain)

(3) Method:

1-Manual 2-Manual Trllcram 3-Ao c TpScrarn 4Crb tion hrm Pi Monih (Explain) 5-her (Explain)

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 August 2003 Docket No:

50-362 Unit Name:

SONGS - 3 Date:

September 15, 2003 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 08101/03 l 0001 Unit in Mode 1.

08/31/03 1 2400 Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.