[V SOUTHERN CALIFORNIA EDISON C
An EDISON V lTERN\\AT1ONALT Company A. Edward Scherer Manager of Nuclear Regulatory Affairs February 11, 2005 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for January 2005 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:
As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15, this letter provides the Monthly Operating Reports for January 2005 for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.
If you have any questions, please contact Mr. C. E. Williams at (949) 368-6707.
Sincerely, Attachments 1 & 2 cc:
B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-7575 I- 111 C
Monthly Operating Report, January 2005 San Onofre Nuclear Generating Station, Unit 2
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 January 2005 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 February 11, 2005 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I1 Design Electrical Rating (Net MWe) l 1070 2 l Maximum Dependable Capacity (Net MWe) l 1070 l
This Month Yr-to-Date Cumulative 3
Number of Hours in Period 744 744 188,113 4
Number of Hours Reactor Was Critical*
744 744 153,975 5
Hours Generator On-line*
744 744 151,937 6
Unit Reserve Shutdown Hours*
0 0
0 7
Net Electrical Energy Generated (MWh)*
I 783,942 783,942 162,967,923
- Rounded
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 January 2005 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 February 11, 2005 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YY/MM/DD)
N/A Type (1)
N/A Duration (Hours)*
N/A Reason (2)
N/A Method of Shutting Down the Reactor (3)
N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)
- Rounded (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Ucense Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
(3) Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 January 2005 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 February 11, 2005 C. E. Williams (949) 368-6707 Page 4 of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time 01/01/05 0000 Unit in Mode 1.
01/10/05 0227 Reduced Reactor power to approximately 85% to support upgrades to an offsite 220 kV transmission line.
01/22/05 2240 Unit restored to essentially full power.
01/31/05 2400 Unit in Mode 1.
Note: There were no challenges to the pressurizer safety valves during the month.
Monthly Operating Report, January 2005 San Onofre Nuclear Generating Station, Unit 3
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 January 2005 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 February 11, 2005 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I 1 Design Electrical Rating (Net MWe) l 1080 2
Maximum Dependable Capacity (Net MWe) l 1080 This Month Yr-to-Date Cumulative 3
Number of Hours in Period 744 744 182,664 4
Number of Hours Reactor Was Critical*
744 744 150,534 5
Hours Generator On-line*
744 744 148,308 6
Unit Reserve Shutdown Hours*
0 0
0 7
Net Electrical Energy Generated (MWh)*
677,86 77,869 157,195,713
- Rounded
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 January 2005 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 February 11, 2005 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YY/MM/DD)
N/A Type (1)
N/A Duration (Hours)*
N/A Reason (2)
N/A Method of Shutting Down the Reactor (3)
N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)
I Rounded (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
(3) Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 January 2005 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 February 11, 2005 C. E. Williams (949) 368-6707 Page 4 of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time 01/01/05 0000 Unit in Mode 1. Holding Reactor power at approximately 70% pending return to service of second Main Feedwater Pump.
01/10/05 0803 Increased Reactor power to approximately 81%. Holding at 81%
Reactor power to support upgrades to an offsite 220 kV transmission line.
01/23/05 0505 Unit restored to essentially full power.
01/31/05 2400 Unit in Mode 1.
Note: There were no challenges to the pressurizer safety valves during the month.