ML042250161
| ML042250161 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 08/10/2004 |
| From: | Scherer A Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML042250161 (9) | |
Text
SOUTHERN CALIFORNIA EDISON' An EDISON INTERNATIONAL I Company August 10, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 A. Edward Scherer Manager of Nuclear Regulatory Affairs
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for July 2004 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:
As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-1 0 and NPF-1 5, this letter provides the Monthly Operating Reports for July 2004 for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.
If you have any questions, please contact Mr. C. E. Williams at (949) 368-6707.
Sincerely, Attachments I & 2 cc:
B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92672 949-368-7501 Fax 949-368-7575
Attachment I Monthly Operating Report, July 2004 San Onofre Nuclear Generating Station, Unit 2
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 July 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 August 10, 2004 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I 1 Design Electrical Rating (Net MWe)
I 1070 2
Maximum Dependable Capacity (Net MWe) 1070 This Month Yr-to-Date Cumulative 3
Numberof Hoursin Period 744 5,111 183,696 l
4 Number of Hours Reactor Was Critical*
744 3,814 149,586 5
Hours Generator On-line*
744 3,683 147,613 6
Unit Reserve Shutdown Hours 0
0 0
7 Net Electrical Energy Generated (MWh)*
836,539 4,066,899 158,182,855
- Rounded
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 July 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 August 10, 2004 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YY/MM/DD)
N/A Type (1)
NM Duration (Hours)*
NA Reason (2)
NIA Method of Shutting Down the Reactor (3)
NIA Cause/Corrective Actions/Comments N/A (Include LER number, if any)
^ Rounded (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Lcense Examination F-Admintrative G-Operational Error (Explain)
H-Other (Explain)
(3) Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 July 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 August 10, 2004 C. E. Williams (949) 368-6707 Page 4 of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time 07101/04 0000 Unit in Mode 1.
07/31/04 2400 Unit in Mode 1.
Note: There were no challenges to the pressurizer safety valves during the month.
Monthly Operating Report, July 2004 San Onofre Nuclear Generating Station, Unit 3
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 July 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 August 10, 2004 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I1 i Design Electrical Rating (Net MWe) l 1080 2 l Maximum Dependable Capacity (Net MWe)
I 1080 This Month Yr-to-Date Cumulative 3
Number of Hours in Period 744
[
5,111 178,247 l
4 Number of Hours Reactor Was Critical*
744 4,905 148,253 5
Hours Generator On-line*
744 4,884 146,104 6
Unit Reserve Shutdown Hours 0
0 0
7 Net Electrical Energy Generated (MWh)*
830,382 5,431,980 154,964,191
- Rounded
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 July 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 August 10,2004 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YYIMM/DD)
N/A Type (1)
N/A Duration (Hours)*
NIA Reason (2)
NIA Method of Shutting Down the Reactor (3)
N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)
' Rounded (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling DRegulatory Restriction E-Operator Training & License Examination F-Admnisfrate G-Operational Error (Explain)
H-Other (Explain)
(3) Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 July 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 August 10, 2004 C. E. Williams (949) 368-6707 Page 4 of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time 07/01/04 l 0000 I Unit in Mode 1.
07/31/04 l 2400 l Unit in Mode 1.
Note: There were no challenges to the pressurizer safety valves during the month.