February 2003 Monthly Operating Report for San Onofre Nuclear Generating Station Units 2 & 3
ML030770571
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/13/2003
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML030770571 (9)


Text

SOUTHERN CALIFORNIA EDISONC An EDISON INTERNATIONAL* Company A. Edward Scherer Manager of Nuclear Regulatory Affairs March 13, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for February 2003 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15, this letter provides the Monthly Operating Report for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.

If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.

Sincerely, Attachments 1 & 2 cc:

E. W. Merschoff, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-7575

  1. ýý4

Attachment I NRC Monthly Operating Report, February 2003 San Onofre Nuclear Generating Station, Unit 2

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 February 2003 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 March 13, 2003 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I 1 I Design Electrical Rating (Net MWe)

I 1070 2

Maximum Dependable Capacity (Net MWe) 1070 This Month Yr-to-Date Cumulative 3

Number of Hours in Period 672 1,416 171,241 4

Number of Hours Reactor Was Critical

  • 659 1,403 138,472 5

Hours Generator On-line

  • 635 1,379 136,638 6

Unit Reserve Shutdown Hours

  • 0 0

0 7

Net Electrical Energy Generated (MWh)

  • 701,416 1,540,346 145,943,820
  • Rounded

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 February 2003 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 March 13, 2003 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS (1) F-Forced S-Scheduled (2) Reason A-Equipment Failure (Explain)

B-Maintenance or Test c-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(3) Method 1-Manual 2-Manual TriplScram 3-Automatic Tnp/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

Number 2003-01 Date (YY/MM/DD) 03/02/01 Type (1)

F Duration (Hours) 37.0 Reason (2)

G Method of Shutting Down the Reactor (3) 3 An error during Unit 3 Main Transformer testing resulted in a Unit 2 Main Generator/Turbine trip and automatic Cause/Corrective Actions/Comments Reactor trip. LER 2003-001 will be (Include LER number, if any) submitted by April 2, 2003.

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 February 2003 Docket No:

Unit Name:

Date:

Completed by.

Telephone:

50-361 SONGS - 2 March 13, 2003 C. E. Williams (949) 368-6707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Time 02/01/03 0001 Unit in Mode 1.

02/01/03 0310 Error during Unit 3 Main Transformer testing resulted in a Unit 2 Main Generator/Turbine trip and Automatic Reactor trip. Unit entered Mode 3.

02/01103 1528 Unit entered Mode 2.

02/01/03 1604 Reactor critical.

02/02/03 1037 Unit entered Mode 1.

02/02/03 1607 Main Generator/Turbine synchronized to the grid.

02/03/03 0952 Unit reaches essentially full power.

02/28/03 2400 Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.

NRC Monthly Operating Report, February 2003 San Onofre Nuclear Generating Station, Unit 3

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 February 2003 Docket No:

50-362 Unit Name:

SONGS - 3 Date:

March 13, 2003 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I I Design Electrical Rating (Net MWe) o1080 2

Maximum Dependable Capacity (Net MWe) 1080 This Month Yr-to-Date Cumulative 3

Number of Hours in Period 672 1,416 165,792 4

Number of Hours Reactor Was Critical 295 426 136,003 5

Hours Generator On-line

  • 266 397 133,876 6

Unit Reserve Shutdown Hours

  • 0 0

0 7

Net Electrical Energy Generated (MWh)

  • 259,624 399,989 141,335,930
  • Rounded

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 February 2003 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 March 13, 2003 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS (1) F-Forced S-Scheduled (2) Reason A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restnction E-Operator Training & Ucense Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(3) Method 1-Manual 2-Manual Trip/Scram 3-Automatic Tnp/Scram 4-Continuation from Previous Month (Explain) 5-other (Explain)

Number 2003-01 Date (YY/MM/DD) 03101106 Type (1)

S Duration (Hours) 405.6 Reason (2)

C Method of Shutting Down the Reactor (3) 4 Cause/Corrective Actions/Comments Continuation of Scheduled Unit 3 (Include LER number, if any)

Cycle 12 Refueling Outage

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 February 2003 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 March 13, 2003 C. E. Williams (949) 368-6707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 02/01/03 0001 Unit defueled.

02103/03 0052 Core alterations for fuel reload begin. Unit entered Mode 6.

02/09/03 0342 Unit entered Mode 5.

02/13/03 1346 Unit entered Mode 4.

02/14/03 1224 Unit entered Mode 3.

02/16/03 1535 Unit entered Mode 2.

02/16/03 1704 Reactor critical.

02/17/03 1447 Unit entered Mode 1.

02/17/03 2138 Main Generator/Turbine synchronized to the grid.

02/19/03 2215 Unit reaches essentially full power.

02/28/03 2400 Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.