November 2003 Monthly Operating Report for San Onofre Units 2 and 3
ML033500131
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/11/2003
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML033500131 (9)


Text

- -

SOUTHERN CALIFORNIA n

EDDI SON An EDISONE'INTER.NATIONVAL(K Company A. Edward Scherer Manager of Nuclear Regulatory Affairs December 11, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for November 2003 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15, this letter provides the Monthly Operating Reports for November 2003 for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.

If you have any questions, please contact Mr. Geoff Cook at (949) 368-7571.

Sincerely, Attachments 1 & 2 cc:

B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-7575

A-tf'

-4

Attachment I Monthly Operating Report, November 2003 San Onofre Nuclear Generating Station, Unit 2

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 November 2003 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 December 11, 2003 G. Cook (949) 368-7571 Page 2 of 4 OPERATING DATA REPORT I 1 Design Electrical Rating (Net MWe) l 1070 2

l Maximum Dependable Capacity(Net MWe) l 1070 l

This Month Yr-to-Date Cumulative 3

Number of Hours in Period 720 8,016 177,841 4

Number of Hours Reactor Was Critical*

720 7,960 145,029 5

Hours Generator On-line*

720 7,927 143,186 6

Unit Reserve Shutdown Hours 0

0 0

7 Net Electrical Energy Generated (MWh)*

809,521 8,873,504 153,276,977

  • Rounded

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 November 2003 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 December 11, 2003 G. Cook (949) 368-7571 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YYIMMDD)

N/A Type 1)

NIA Duration (Hours)

N/A Reason (2)

N/A Method of Shutting Down the Reactor (3)

N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)

(1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test G-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operatkoa Error (Explain)

H-Other (Explain)

(3) Method:

1 Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 November 2003 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 December 11, 2003 G. Cook (949) 368-7571 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 11/01/03 0000 Unitin Mode 1.

11/30/03 2400 Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.

Monthly Operating Report, November 2003 San Onofre Nuclear Generating Station, Unit 3

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 November 2003 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 December 11, 2003 G. Cook (949) 368-7571 Page 2 of 4 OPERATING DATA REPORT I1 Design Electrical Rating (Net MWe)

I 1080 2 lMaximum Dependable Capacity(Net MWe) l 1080 l

This Month Yr-to-Date Cumulative 3

Number of Hours in Period 720 8,016 172,392 4

Number of Hours Reactor Was Critical*

720 7,026 142,603 5

Hours Generator On-line*

720 6,997 140,476 6

Unit Reserve Shutdown Hours 0

0 0

7_

Net Electrical Energy Generated (MWh)*

792,379 7,764,452 148,700,394

  • Rounded

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 November 2003 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 December 11, 2003 G. Cook (949) 368-7571 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YY1MM/DD)

N/A Type ()

N/A Duration (Hours)

N/A Reason (2)

N/A Method of Shutting Down the Reactor (3)

N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)

(1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Reeling D-Regulatory Restriction E-Operator Training & Ucense Examination F-Administrative G-Operationl Error (Explain)

H-Other (Explain)

(3) Method:

I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 November 2003 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 December 11, 2003 G. Cook (949) 368-7571 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 11/01/03 0000 Unit in Mode 1.

11/30/03 2400 Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.