SOUTHERN CALIFORNIA n
EDDI SON An EDISONE'INTER.NATIONVAL(K Company A. Edward Scherer Manager of Nuclear Regulatory Affairs December 11, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for November 2003 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:
As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15, this letter provides the Monthly Operating Reports for November 2003 for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.
If you have any questions, please contact Mr. Geoff Cook at (949) 368-7571.
Sincerely, Attachments 1 & 2 cc:
B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-7575
A-tf'
-4
Attachment I Monthly Operating Report, November 2003 San Onofre Nuclear Generating Station, Unit 2
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 November 2003 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 December 11, 2003 G. Cook (949) 368-7571 Page 2 of 4 OPERATING DATA REPORT I 1 Design Electrical Rating (Net MWe) l 1070 2
l Maximum Dependable Capacity(Net MWe) l 1070 l
This Month Yr-to-Date Cumulative 3
Number of Hours in Period 720 8,016 177,841 4
Number of Hours Reactor Was Critical*
720 7,960 145,029 5
Hours Generator On-line*
720 7,927 143,186 6
Unit Reserve Shutdown Hours 0
0 0
7 Net Electrical Energy Generated (MWh)*
809,521 8,873,504 153,276,977
- Rounded
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 November 2003 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 December 11, 2003 G. Cook (949) 368-7571 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YYIMMDD)
N/A Type 1)
NIA Duration (Hours)
N/A Reason (2)
N/A Method of Shutting Down the Reactor (3)
N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)
(1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test G-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operatkoa Error (Explain)
H-Other (Explain)
(3) Method:
1 Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 November 2003 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 December 11, 2003 G. Cook (949) 368-7571 Page 4 of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time 11/01/03 0000 Unitin Mode 1.
11/30/03 2400 Unit in Mode 1.
Note: There were no challenges to the pressurizer safety valves during the month.
Monthly Operating Report, November 2003 San Onofre Nuclear Generating Station, Unit 3
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 November 2003 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 December 11, 2003 G. Cook (949) 368-7571 Page 2 of 4 OPERATING DATA REPORT I1 Design Electrical Rating (Net MWe)
I 1080 2 lMaximum Dependable Capacity(Net MWe) l 1080 l
This Month Yr-to-Date Cumulative 3
Number of Hours in Period 720 8,016 172,392 4
Number of Hours Reactor Was Critical*
720 7,026 142,603 5
Hours Generator On-line*
720 6,997 140,476 6
Unit Reserve Shutdown Hours 0
0 0
7_
Net Electrical Energy Generated (MWh)*
792,379 7,764,452 148,700,394
- Rounded
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 November 2003 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 December 11, 2003 G. Cook (949) 368-7571 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YY1MM/DD)
N/A Type ()
N/A Duration (Hours)
N/A Reason (2)
N/A Method of Shutting Down the Reactor (3)
N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)
(1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Reeling D-Regulatory Restriction E-Operator Training & Ucense Examination F-Administrative G-Operationl Error (Explain)
H-Other (Explain)
(3) Method:
I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 November 2003 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 December 11, 2003 G. Cook (949) 368-7571 Page 4 of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time 11/01/03 0000 Unit in Mode 1.
11/30/03 2400 Unit in Mode 1.
Note: There were no challenges to the pressurizer safety valves during the month.