ML22060A113

From kanterella
Jump to navigation Jump to search
Nuclear Property Insurance
ML22060A113
Person / Time
Site: San Onofre  
Issue date: 02/24/2022
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML22060A113 (1)


Text

SOUTHERN CALIFORNIA EDISON' 1

Al Bates An EDISON INTERNATIONAL@ Company Manager, Nuclear Regulatory Affairs

& Technical Assistant to the CNO ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 February 24, 2022

Subject:

Docket Nos. 50-206, 50-361 and 50-362 Nuclear Property Insurance San Onofre Nuclear Generating Station Units 1, 2, and 3

Dear Sir or Madam:

10 CFR50.54 This letter is the report required by 10 CFR 50.54(w)(3). The following Nuclear Property and Decontamination Liability Insurance will be in effect for the San Onofre Nuclear Generating Station on the April 1, 2022 policy renewal date:

Policy (Amount)

Primary Property and Decontamination Liability Insurance Policy

($130 million)

Source Nuclear Electric Insurance Limited (NEIL Primary)

This amount of Nuclear Property and Decontamination Liability Insurance is unchanged from the previous year.

The policy providing coverage mentioned above complies with 10 CFR 50.54(w), including provisions for the insurance proceeds to be prioritized for dedicated reactor stabilization/safety and then for decontamination of the site.

There are no commitments contained in this letter.

If you have any questions or require additional information, please contact me at 949-368-7024.

cc:

_y;;1~

fo,r A, BJ-e..s S. A. Morris, Regional Administrator, NRC Region IV A. M. Snyder, NRC Project Manager, San Onofre Units 1, 2, and 3 f-1DD l jV l'--j-5 5 6 J

/Vic le.

J;v/SS