Letter Sequence Draft Other |
---|
|
|
MONTHYEARML21090A1152021-04-0707 April 2021 EA+FONSI-SONGS ISFSI DFP - Clean Project stage: Other ML21061A2322021-04-0707 April 2021 Memo to File for EA+FONSI-SONGS ISFSI DFP-CLEAN Project stage: Other ML21061A2312021-04-13013 April 2021 Close-out Letter - SONGS ISFSI DFP-CLEAN Project stage: Other ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 Project stage: Request ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs Project stage: Draft Other ML23192A0922023-08-14014 August 2023 Note to File - Final EA Updated DFP - San Onofre Project stage: Other ML23192A0902023-08-14014 August 2023 Final Environmental Assessment and Finding of No Significant Impact for Southern California Edison'S Updated Decommissioning Funding Plans for San Onofre Independent Spent Fuel Storage Installation Project stage: Request ML23192A0912023-08-14014 August 2023 Enclosure- Final Ea/Fonsi for Updated Decommissioning Funding Plans for San Onofre ISFSI Project stage: Request 2023-03-29
[Table View] |
|
---|
Category:Letter
MONTHYEARML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 and Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Service'S December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commission'S Analysis of Southern California Edison'S Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 ML22136A0842022-05-12012 May 2022 Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report ML22122A0402022-04-28028 April 2022 (Songs), Units 1, 2 and 3 - Annual Radioactive Effluent Release Report - 2021 ML22105A5662022-04-0505 April 2022 20053 Letter - OI Closure to Licensee - Wrongdoing Signed ML22081A1692022-03-31031 March 2022 SONGS Application Acceptance Proposed Exemption from Title 10 of the CFR, Part 72.106(b), ISFSI Controlled Boundary IR 05000206/20214022022-03-24024 March 2022 Notice of Violation, NRC Inspection Report 05000206/2021402, 05000361/2021402, 05000362/2021402, and 07200041/2021401; and Investigation Report 4-2021-004- Public- Cover Letter ML22084A0552022-03-23023 March 2022 10 CFR 50.82(a)(8Xv and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 San Onofre Nuclear Generating Station Units 1, 2, and 3 and Independent Spent Fuel Storage Installation IR 05000361/20220012022-03-14014 March 2022 NRC Inspection Report 05000361/2022-001; 05000362/2022-001 ML22066B0242022-03-0303 March 2022 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision 2 to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML22062B0282022-02-28028 February 2022 and Independent Spent Fuel Storage Installation (Isfsi), Response to Request for Supplemental Information Regarding Request for Exemption from 10 CFR 72.106(b) ML22059B0392022-02-25025 February 2022 International, Proprietary Information to Support SCE Exemption ML22060A1132022-02-24024 February 2022 Nuclear Property Insurance ML22060A1152022-02-24024 February 2022 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2021 ML22048B4972022-02-15015 February 2022 (Songs), Units 1, 2 and 3 - 2021 Annual Turtle Incidental Take Report ML22031A1112022-01-26026 January 2022 (Songs), Units 2 and 3 - Annual Corporate Financial Reports 2024-01-17
[Table view] |
Text
PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE CALIFORNIA ENERGY COMMISSION THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 14, 2023 David Hochschild, Chair California Energy Commission 1516 Ninth Street, MS-32 Sacramento, CA 95814
SUBJECT:
REVIEW OF THE DRAFT ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT RELATED TO SAN ONOFRE INDEPENDENT SPENT FUEL STORAGE INSTALLATION UPDATED DECOMMISSIONING FUNDING PLANS
Dear David Hochschild:
By letters dated March 28, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17090A152), March 17, 2020 (ML20079J032),
March 24, 2021 (ML21091A037), March 23, 2022 (ML22084A055), and March 29, 2023 (ML23094A127), Southern California Edison (SCE), on behalf of itself, San Diego Gas &
Electric, the City of Anaheim, and the City of Riverside, submitted updated decommissioning funding plans (DFPs) for 2016, 2019, 2020, 2021 and 2022 calendar years, respectively, for the San Onofre Nuclear Generating Station (San Onofre), Units 1, 2, and 3, Independent Spent Fuel Storage Installation (ISFSI) located in San Clemente, California (CA), for U.S. Nuclear Regulatory Commission (NRC) staff review and approval. The NRC staff is currently reviewing these updated DFPs submitted by SCE.
Previously, by letter dated May 20, 2016 (ML16146A068), the NRC consulted with the U.S. Fish and Wildlife Service (FWS), in Sacramento, CA, regarding the SCEs initial 2012 DFP (ML130420384) and updated 2015 DFP (ML15349A942) submittals for San Onofre ISFSI. The NRC staff noted that FWS did not advise comments.
The NRC regulations at Title 10 of the Code of Federal Regulations (10 CFR) Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater than Class C Waste, govern the storage of spent nuclear fuel (spent fuel) generated at commercial nuclear power reactors licensed by the NRC. Spent fuel that has been removed from the reactors spent fuel pool is typically stored at a nuclear power plants ISFSI.
Upon removal of the enclosure, this document is decontrolled.
PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE CALIFORNIA ENERGY COMMISSION THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE CALIFORNIA ENERGY COMMISSION THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
D. Hochschild 2 The NRC requires its licensees to plan for the eventual decommissioning of their licensed facilities prior to license termination. On June 17, 2011, the NRC published a final rule amending its decommissioning planning regulations (76 Federal Register (FR) 35512).
The final rule amended the NRC regulation, 10 CFR 72.30, which concerns financial assurance and decommissioning for ISFSIs. This regulation now requires each holder of, or applicant for, a license under 10 CFR Part 72 to submit, for NRC review and approval, a DFP. The purpose of the DFP is to demonstrate the licensees financial assurance (i.e., that funds will be available to decommission the ISFSI). The NRC staff is reviewing the information submitted by SCE.
Specifically, the NRC must determine whether SCE DFPs contain the information required by 10 CFR 72.30(c), and whether SCE has provided reasonable assurance that funds will be available to decommission the San Onofre ISFSIs.
In accordance with 10 CFR Part 51, which contains the NRC regulations that implement the National Environmental Policy Act of 1969, as amended, the agency has prepared a separate draft environmental assessment (EA) for the San Onofre ISFSI, respectively, for the proposed action (enclosed). We are providing your office with the opportunity to review the draft EA and comment on environmental issues prior to the public issuance and publication of the EA. We request that distribution and use of the enclosed draft EA be limited only to those staff involved in the review and comment process.
Please submit any comments within 30 days from the date of this letter to the U.S. Nuclear Regulatory Commission, Document Control Desk, ATTN: Yoira Diaz-Sanabria, Mail Stop:
TWFN 4B16, U.S. Nuclear Regulatory Commission, Washington, DC 20555. If you have any questions, please contact Tilda Liu of my staff by telephone at 404-997-4730, or by email at Tilda.Liu@nrc.gov. The NRC staff will consider your timely comments and will revise the EA, as appropriate, before its final issuance and publication. Thank you for your assistance.
Sincerely, Signed by Diaz-Sanabria, Yoira on 06/14/23 Yoira K. Diaz-Sanabria, Chief Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 72-41 License No. SFGL-19 EPID No.: L-2017-FPR-0062
Enclosure:
Draft EA for San Onofre ISFSI PRE-DECISIONAL INFORMATION. THIS INFORMATION IS LIMITED TO USE BY THE CALIFORNIA ENERGY COMMISSION THIS INFORMATION SHALL NOT BE DISCLOSED WITHOUT PRIOR NRC PERMISSION.
ML23129A180 (ltr); ML23129A179 (enc); ML23129A178 (pkg)
OFFICE DFM/STLB:PM DFM/STLB:LA OGC (NLO) NMSS/DFM/STLB:BC NAME TLiu WWheatley KBernstein YDiaz-Sanabria DATE 5/16/2023 5/16/2023 5/30/2023 6/14/2023