June 2005 Monthly Operating Reports for San Onofre Nuclear Generating Station, Units 2 and 3
ML051960394
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/13/2005
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML051960394 (5)


Text

SOUHII[RN CAUIFORNIA A. Edward Scherer EDISON" Manager of Nuclear Regulatory Affairs An EDISON INTERNVATIONA L r Company July 13, 2005 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for June 2005 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

This letter provides the Monthly Operating Reports for June 2005 for the San Onofre Nuclear Generating Station Units 2 and 3 (see Attachments 1 and 2).

Please note that Amendment No. 195 to Facility Operating License No. NPF-1 0 and Amendment No. 186 to Facility Operating License No. NPF-15 for SONGS Units 2 and 3, respectively, have been issued by the U.S. Nuclear Regulatory Commission on May 10, 2005. In the future, as required by these Amendments, the operating data for SONGS Units 2 and 3 will be submitted electronically on a quarterly basis via the Consolidated Data Entry (CDE) system.

If you have any questions, please contact Mr. C. E. Williams at (949) 368-6707.

Sincerely, Attachments 1 and 2 cc: B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92672 949-368-7501 Fax 949-368-7575 e2-

Attachment 1 Monthly Operating Report, June 2005 San Onofre Nuclear Generating Station, Unit 2

OPERATING DATA REPORT DOCKET NO. 50-361 UNIT NAME Iban Onofre 2 DATE July 12, 2005 COMPLETED BY i ;lay Williams TELEPHONE (949) 368-6707 REPORTING PERIOD: June 2005

1. Design Electrical Rating 1,070.00
2. Maximum Dependable Capacity (MWe-Net) 1,070.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 3,750.44 156,981.08
4. Number of Hours Generator On-line 720.00 3,699.48 154,892.25
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 802,494.86 4,018,531.03 166,202,511.17 UNIT SHUTDOWNS Type Method of F: Forced Duration Re 1n Shutting Cause & Corrective Action S: Scheduled (Hours) Down 2 Comments

SUMMARY

06/01/2005: Unit in Mode 1. 06/30/2005: Unit in Mode 1.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Attachment 2 Monthly Operating Report, June 2005 San Onofre Nuclear Generating Station, Unit 3

OPERATING DATA REPORT DOCKET NO. 50-362 UNIT NAME ISan Onofre 3 DATE Ju[132-200 COMPLETED BY TClay Williams TELEPHONE (949) 368-6707 REPORTING PERIOD: June 2005

1. Design Electrical Rating 1,080.00
2. Maximum Dependable Capacity (MWe.Net) 1,080.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 720.00 4,233.63 154,023.83
4. Number of Hours Generator On-line 720.00 4,199.18 151,763.26
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 807,639.81 4,537,911.43 161,055,755.59 UNIT SHUTDOWNS .

Type Method of No. Date F: Forced Duration Reason1 Shutting Cause & Corrective Action 5: Scheduled (Hours) Down2 Comments

SUMMARY

06/01/2005: Unit In Mode 1. 06/30/2005: Unit in Mode 1.

1 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training &License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)