ML22207B861
| ML22207B861 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 07/26/2022 |
| From: | Greg Warnick NRC/RGN-IV/DRSS |
| To: | Bauder D Southern California Edison Co |
| References | |
| IR 2022003 | |
| Download: ML22207B861 (4) | |
See also: IR 05000361/2022003
Text
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
July 26, 2022
Mr. Doug Bauder
Vice President and Chief Nuclear Officer
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION - NRC INSPECTION
REPORT 05000361/2022-003 AND 05000362/2022-003
Dear Mr. Bauder:
This letter refers to the U.S. Nuclear Regulatory Commission (NRC) inspection conducted on
June 27-29, 2022, at the San Onofre Nuclear Generating Station (SONGS), Units 2 and 3. The
inspectors discussed the results of this inspection with you and members of your staff during a
final exit meeting conducted on June 29, 2022. The inspection results are documented in the
enclosure to this letter.
This inspection examined activities conducted under your license as they relate to public health
and safety, the common defense and security, and to confirm compliance with the
Commissions rules and regulations, and with the conditions of your licenses. Within these
areas, the inspection consisted of selected examination of procedures and representative
records, observations of activities, performance of independent radiation measurements, and
interviews with personnel. Specifically, the inspectors reviewed decommissioning activities for
SONGS Units 2 and 3, and the occupational radiation exposure program. Within the scope of
the inspection, no violations were identified and no response to this letter is required.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a
copy of this letter, Enclosure 1, and your response if you choose to provide one, will be made
available electronically for public inspection in the NRC Public Document Room or from the
NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html. To the extent
possible, your response should not include any personal privacy or proprietary, information so
that it can be made available to the Public without redaction.
Enclosure 2 transmitted herewith
contains SUNSI. When separated from
Enclosure 2, this transmittal document
and Enclosure 1 are decontrolled.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
D. Bauder
2
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
However, Enclosure 2 of the inspection report contains Security-Related Information, so the
enclosure will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you
choose to provide a response that contains Security-Related Information, please mark your
entire response Security-Related Information - Withhold from Public Disclosure under
10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for
withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your
response in accordance with 10 CFR 2.390(b)(1)(ii).
If you have any questions regarding this inspection report, please contact Stephanie Anderson
at 817-200-1213, or the undersigned at 817-200-1249.
Docket Nos.: 50-361; 50-362
Public Enclosure:
Inspection Report 050-00361/2022-003;
050-00362/2022-003
w/Attachment: Supplemental Inspection Information
Distribution via Listserv
X SUNSI Review
By: CDS
ADAMS:
X Yes
No
Sensitive
X Non-Sensitive
Non-Publicly Available
X Publicly Available
Keyword
OFFICE
DRSS/DIOR
DRSS/DIOR
C:DIOR
NAME
SGAnderson
RJEvans
GGWarnick
SIGNATURE
/RA/
/RA/
/RA/
DATE
7/19/2022
7/21/2022
7/26/2022
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
Enclosure
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
SUPPLEMENTAL INSPECTION INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
A. Bates, SCE, Regulatory Affairs and Oversight Manager
S. Mannon, SDS, Program Director and Regulatory Affairs
R. Kalman, SDS, Executive Sponsor
L. Rafner, SCE, Regulatory Affairs
C. Cates, SCE, Prudency Manager and Employee Concerns
R. Besich, SCE, SONGS Chief Financial Officer
S. Sewell, SDS, Radiation Protection and Waste Contract Management
S. Enright, SDS, ALARA & Special Projects Manager
C. Ahola, SDS, Radiation Protection and Waste Contract Management
INSPECTION PROCEDURES USED
Decommissioning Performance and Status Review at Permanently Shutdown
Reactors
Occupational Radiation Exposure at Permanently Shutdown Reactors
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened/Closed
None
Discussed
None
LIST OF ACRONYMS
Agencywide Documents Access and Management System
as low as is reasonably achievable
CFR
Code of Federal Regulations
D&D
Decontamination and Dismantlement
Independent Spent Fuel Storage Installation
NRC
Nuclear Regulatory Commission
Permanently Defueled Emergency Plan
Post-Shutdown Decommissioning Activities Report
SONGS Decommissioning Solutions
Southern California Edison Company
San Onofre Nuclear Generating Station