SOUTHERN CALIFORNIA EDISON A. Edward Scherer Manager of Nuclear Regulatory Affairs An EDISON INTERNATIONAL Company December 13, 2002 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for November 2002 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-1 0 and NPF-15, this letter provides the Monthly Operating Report for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.

If you have any questions, please contact Mr. Clay E. Williams at (949)-368-6707.

Sincerely, Attachments I & 2 cc: E. W. Merschoff, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-7575

Attachment I NRC Monthly Operating Report, November 2002 San Onofre Nuclear Generating Station, Unit 2

USNRC MONTHLY OPERATING REPORT Docket No: 50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 2 UNIT 2 Date: Dec. 13, 2002 November 2002 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I Design Electrical Rating (Net MWe) 1070 2 Maximum Dependable Capacity (Net MWe) 1070 This Month Yr-to-Date Cumulative 3 Number of Hours in Period 720 8,016 169,081 4 Number of Hours Reactor Was Critical

  • 635 6,937 136,325 5 Hours Generator On-line
  • 614 6,874 134,515 6 Unit Reserve Shutdown Hours
  • 0 0 0 7 Net Electrical Energy Generated (MWh)
  • 677,082 7,673,078 143,566,094
  • Rounded

USNRC MONTHLY OPERATING REPORT Docket No: 50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 2 UNIT 2 Date: Dec. 13, 2002 November 2002 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number 2002-02 Date (YY/MM/DD) 02/11/02 Type (1) F Duration (Hours) 105.8 Reason (2) A Method of Shutting Down the Reactor (3) 3 The cause of this shutdown and Cause/Corrective Actions/Comments corrective actions taken will be reported (Include LER number, if any) under LERs 2002-006 and 2002-007 (1) F-Forced S-Scheduled (2) Reason: A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restnction-*

E-Operator Training & Ucense Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(3) Method 1-Manual 2-Manual Trip/Scram 3-Automatic Tnp/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

USNRC MONTHLY OPERATING REPORT Docket No: 50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 2 UNIT 2 Date: Dec. 13, 2002 November 2002 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 11/01/02 0001 Unit in Mode 1.

11/02/02 0316 Automatic Reactor Trip and Turbine Trip due to low Steam Generator Water level. Unit entered Mode 3. (LER 2002-006) 11/04/02 0352 Unit entered Mode 2.

11/04/02 1128 Unit entered Mode 1.

11/04/02 1252 Unit at 17% Reactor Power and preparing to roll Main Turbine.

11/04/02 1621 Main Turbine rolling at 1800 rpm but Unit not online.

11/04102 1644 Manually tripped Reactor due to lowering RCS pressure from stuck open Pressurizer Spray Valve. Unit entered Mode 3. (LER 2002-007) 11/06/02 0409 Unit entered Mode 2.

11/06/02 0854 Unit entered Mode 1.

11/06/02 1306 Unit online with approximately 55 Mwe load.

11/06102 1331 Commenced power ascension to full power.

11/06/02 2300 Unit stabilized at approximately 95%.

11/8/02 2241 Unit at full power.

11/30/02 2400 Unit in Mode 1.

'ote: There were no challenges to the pressurizer safety valves during the month.

Attachment 2 NRC Monthly Operating Report, November 2002 San Onofre Nuclear Generating Station, Unit 3

USNRC MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 3 UNIT 3 Date: Dec. 13, 2002 November 2002 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT 1 Design Electrical Rating (Net MWe) 1080 2 Maximum Dependable Capacity (Net MWe) 1080 This Month Yr-to-Date Cumulative 3 Number of Hours in Period 720 8,016 163,632 4 Number of Hours Reactor Was Critical

  • 720 7,942 134,833 5 Hours Generator On-line
  • 720 7,914 132,734 6 Unit Reserve Shutdown Hours
  • 0 0 0 7 Net Electrical Energy Generated (MWh)
  • 798,670 8,734,016 140,121,805
  • Rounded

USNRC MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 3 UNIT 3 Date: Dec. 13, 2002 November 2002 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YY/MM/DD) N/A Type (1) NIA Duration (Hours) NIA Reason (2) N/A Method of Shutting Down the Reactor (3) N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any) N/A (1) F-Forced S-Scheduled (2) Reason: A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(3) Method. 1-Manual 2-Manual Tnp/Scram 3-Automabc Tnp/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

USNRC MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 3 UNIT 3 Date: Dec. 13, 2002 November 2002 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 11/01/02 0001 Unit in Mode 1.

11/30/02 2400 Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.