August 2004 Monthly Operating Report for San Onofre Nuclear Generating Station, Units 2 and 3
ML042580176
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/10/2004
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML042580176 (9)


Text

SOUTHERN CALIFORNIA A. Edward Scherer ED ISONy Manager of Nuclear Regulatory Affairs An EDISON INTERNATIONAL19 Company September 10, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for August 2004 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15, this letter provides the Monthly Operating Reports for August 2004 for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.

If you have any questions, please contact Mr. C. E. Williams at (949) 368-6707.

Sincerely, Attachments I & 2 cc: B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente. CA 92674-0128 949-368-7501 Fax 949-368-7575 II--'

Attachment I Monthly Operating Report, August 2004 San Onofre Nuclear Generating Station, Unit 2

MONTHLY OPERATING REPORT Docket No: 50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 2 UNIT 2 Date: September 10, 2004 August 2004 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I 1 l Design Electrical Rating (Net MWe) l 1070 2 Maximum Dependable Capadc NetMWe 1070 l H

4 Number of Hours in Period Number of Hours Reactor Was Critical*

Hours Generator On-line*

J This Month 744 744 744 Yr-to-Date 5,855 4,558 4,427 Cumulative 184,440 150,330 148,357 6 Unit Reserve Shutdown Hours 0 0 0 7 Net Electrical Energy Generated (MWh)* 1 833,616 4,900,514 159,016,471

  • Rounded

MONTHLY OPERATING REPORT Docket No: 50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 2 UNIT 2 Date: September 10, 2004 August 2004 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YY/MM/DD) N/A Type (1) N/A Duration (Hours)* N/A Reason (2) N/A Method of Shutting Down the Reactor (3) N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any) ___

  • Rounded (1) F-Forced S-Scheduled (2) Reason: A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(3) Method: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

MONTHLY OPERATING REPORT Docket No: 50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 2 UNIT 2 Date: September 10, 2004 August 2004 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 08/01/04 l 0000 I Unit in Mode 1.

08/31/04 1 2400 l Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.

Attachment 2 Monthly Operating Report, August 2004 San Onofre Nuclear Generating Station, Unit 3

MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 3 UNIT 3 Date: September 10, 2004 August2004 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I

1 Design Electrical Rating (Net MWe) 1080 2 Maximum Dependable Capacity (Net MWe) 1080 This Month Yr-to-Date Cumulative 3 Number of Hours in Period 744 5,855 178,991 4 Number of Hours Reactor Was Critical* 744 5,649 148,997 5 Hours Generator On-line* 744 5,628 146,848 6 Unit Reserve Shutdown Hours 0 0 0 7 Net Electrical Energy Generated (MWh)* 826,752 6,258,732 , 155,790,943

  • Rounded

MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 3 UNIT 3 Date: September 10, 2004 August 2004 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YY/MMWDD) N/A Type (1) N/A Duration (Hours)* N/A Reason (2) N/A Method of Shutting Down the Reactor (3) N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any) ___

  • Rounded (1) F-Forced S-Scheduled (2) Reason: A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restricon E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(3) Method: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)

MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS - 3 UNIT 3 Date: September 10, 2004 August 2004 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 08/01/04 0000 Unit in Mode 1.

08/31/04 2400 Unit in Mode 1.

Note: There were no challenges to the pressurizer safety valves during the month.