SOUTHERN CALIFORNIA ED ISONy An EDISON INTERNATIONAL19 Company A. Edward Scherer Manager of Nuclear Regulatory Affairs September 10, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for August 2004 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:
As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15, this letter provides the Monthly Operating Reports for August 2004 for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.
If you have any questions, please contact Mr. C. E. Williams at (949) 368-6707.
Sincerely, Attachments I & 2 cc:
B. S. Mallett, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente. CA 92674-0128 949-368-7501 Fax 949-368-7575 I I-- '
Attachment I Monthly Operating Report, August 2004 San Onofre Nuclear Generating Station, Unit 2
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 August 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 September 10, 2004 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I 1 l Design Electrical Rating (Net MWe) l 1070 2
Maximum Dependable Capadc NetMWe 1070 l
This Month Yr-to-Date Cumulative H
Number of Hours in Period J
744 5,855 184,440 4
Number of Hours Reactor Was Critical*
744 4,558 150,330 Hours Generator On-line*
744 4,427 148,357 6
Unit Reserve Shutdown Hours 0
0 0
7 Net Electrical Energy Generated (MWh)*
1 833,616 4,900,514 159,016,471
- Rounded
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 August 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 September 10, 2004 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YY/MM/DD)
N/A Type (1)
N/A Duration (Hours)*
N/A Reason (2)
N/A Method of Shutting Down the Reactor (3)
N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)
- Rounded (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
(3) Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 August 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 September 10, 2004 C. E. Williams (949) 368-6707 Page 4 of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time 08/01/04 l 0000 I Unit in Mode 1.
08/31/04 1 2400 l Unit in Mode 1.
Note: There were no challenges to the pressurizer safety valves during the month.
Monthly Operating Report, August 2004 San Onofre Nuclear Generating Station, Unit 3
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 August2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 September 10, 2004 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I 1 Design Electrical Rating (Net MWe) 1080 2
Maximum Dependable Capacity (Net MWe) 1080 This Month Yr-to-Date Cumulative 3
Number of Hours in Period 744 5,855 178,991 4
Number of Hours Reactor Was Critical*
744 5,649 148,997 5
Hours Generator On-line*
744 5,628 146,848 6
Unit Reserve Shutdown Hours 0
0 0
7 Net Electrical Energy Generated (MWh)*
826,752 6,258,732, 155,790,943
- Rounded
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 August 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 September 10, 2004 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS Number N/A Date (YY/MMWDD)
N/A Type (1)
N/A Duration (Hours)*
N/A Reason (2)
N/A Method of Shutting Down the Reactor (3)
N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)
- Rounded (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restricon E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
(3) Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 August 2004 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 September 10, 2004 C. E. Williams (949) 368-6707 Page 4 of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time 08/01/04 0000 Unit in Mode 1.
08/31/04 2400 Unit in Mode 1.
Note: There were no challenges to the pressurizer safety valves during the month.