R* I SOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONAL-Company A Edward Scherer Manager of Nuclear Oversight and Regulatory Affairs October 10, 2002 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for September 2002 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:
As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15, this letter provides the Monthly Operating Report for San Onofre Nuclear Generating Station, Units 2 and 3, Attachments 1 and 2, respectively.
If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.
Sincerely, Attachments 1 & 2 cc:
E. W. Merschoff, Regional Administrator, NRC Region IV B. M. Pham, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P. O. Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-6085
Attachment I NRC Monthly Operating Report, September 2002 San Onofre Nuclear Generating Station, Unit 2
USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 September 2002 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 October 10, 2002 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I
Design Electrical Rating (Net MWe) 1070 2
Maximum Dependable Capacity (Net MWe) 1070 This Month Yr-to-Date Cumulative 3
Number of Hours in Period 720 6,551 167,616 4
Number of Hours Reactor Was Critical
- 720 5,557 134,945 5
Hours Generator On-line
- 720 5,515 133,155 6
Unit Reserve Shutdown Hours
- 0 0
0 7
Net Electrical Energy Generated (MWh)
- 805,969 6,159,448 142,052,463
- Rounded
USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 September 2002 UNIT SHUTDOWNS (1) F-Forced S-Scheduled (2) Reason A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
(3) Method 1-Manual 2-Manual Tnp/Scram 3-Automatic Tnp/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
Docket No:
50-361 Unit Name:
SONGS - 2 Date:
October 10, 2002 Completed by:
C. E. Williams Telephone:
(949) 368-6707 Page 3 of 4 Number N/A Date (YY/MM/DD)
N/A Type (1)
N/A Duration (Hours)
N/A Reason (2)
N/A Method of Shutting Down the Reactor (3)
N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)
USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 September 2002 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-361 SONGS - 2 October 10, 2002 C. E. Williams (949) 368-6707 Page 4 of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Time 09101/02 09/30/02 0001 2400 I
I I
Unit in Mode 1.
Unit in Mode 1.
flate.
Note: There were no challenges to the pressurizer safety valves during the month.
Date Time I
NRC Monthly Operating Report, September 2002 San Onofre Nuclear Generating Station, Unit 3
USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 September 2002 Docket No:
Unit Name:
Date:
Completed by.
Telephone:
50-362 SONGS - 3 October 10, 2002 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT 1
Design Electrical Rating (Net MWe)
I 1080 2
Maximum Dependable Capacity (Net MWe) 1080 This Month Yr-to-Date Cumulative 3
Number of Hours in Period 720 6,551 162,167 4
Number of Hours Reactor Was Critical
- 720 6,477 133,368 5
Hours Generator On-line
- 720 6,449 131,269 6
Unit Reserve Shutdown Hours
- 0 0
0 7
Net Electrical Energy Generated (MWh)
- 786,319 7,119,801 138,507,590
- Rounded
USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 September 2002 UNIT SHUTDOWNS (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refuehng D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
(3) Method.
1-Manual 2-Manual Tnp/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month (Explain) 5-Other (Explain)
Docket No-50-362 Unit Name:
SONGS - 3 Date:
October 10, 2002 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 3 of 4 Number N/A Date (YY/MM/DD)
N/A Type (1)
N/A Duration (Hours)
N/A Reason (2)
N/A Method of Shutting Down the Reactor (3)
N/A Cause/Corrective Actions/Comments N/A (Include LER number, if any)
USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 September 2002 Docket No:
Unit Name:
Date:
Completed by:
Telephone:
50-362 SONGS - 3 October 10, 2002 C. E. Williams (949) 368-6707 Page 4 of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Unit in Mode 1.
Unit in Mode 1.
Date 09/01/02 09/30/02 Time 0001 2400 Note. There were no challenges to the pressurizer safety valves during the month.