ML20012C679

From kanterella
Revision as of 10:24, 15 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Installation Date for Regulatory Effectiveness Review Concern 2.6.1 Revised to 900531.Deficiency Will Be Under Continuous Surveillance Until Correction Made
ML20012C679
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/08/1990
From: Schnell D
UNION ELECTRIC CO.
To: Holahan G
Office of Nuclear Reactor Regulation
References
ULNRC-2171, NUDOCS 9003230045
Download: ML20012C679 (3)


Text

, 190l Gratior kret a<*% Post Othce Box 149  :

St. Louis. Muoun C3166

+ 314 554 1650 i

(( Don M r.Schnen v S ; ror l'ee hesident n March 8, 1990 '

Mr. Gary M. Holahan Acting Director i Division of Reactor Projects-III, IV, V and Speci.al Projects Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission >

Washington, D.c. 20555 ,

ULNRC-2171 ,

Dear Siri Docket No. 50-483 callaway Plant Facility Operating License NPF-30 Regulatory Effectiveness Review Report The subject was addressed by our response ULNRC-2115, dated December 4, 1989. In that response, we projected an installation date of April 15, 1990 for ,

RER concern 2.6.1.

l This item has required the purchase of safety -

related structural members from a qualified vendor.

Projected delivery date on this material has resulted ,

in a revised installation date of May 31, 1990.

As previously indicated, the noted deficiency will be under continuous surveillance until the correction is made.

rs very Truly Yours, 90032 % ,(( $kh[b PDR

,{,3 h~

Q  ;

P g -

Donald F. Schnell Wd&

WRC/cs

,Q Ol i p ~<

i a . Inw.,

i Copy distribution for ULNRC-2171 Mr. A. Bert Davis Mr. R. W. DeFayette Regional Administrator Chief, Reactor Projects Section 3A j U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission s

.R^gion III Region III 799 Roosevelt Road 799 Roosevelt Road Glcn Ellyn, IL 60137 Glen Ellyn, IL 60137 i

Mr. S. V. Athavale (2) American Nuclear Insurers Gffice of Nuclear Reactor Regulation. c/o Dottie Sherman, Library U.S. Nuclear Regulatory Commission The Exchange Suite 245 M311 Stop 13-E-21 270 Farmington Avenue W3Chington, D.C. 20555 Farmington, CT 06032 M ntger, Electric Department Mr. O. Maynard Mic;ouri Public Service Commission Wolf Creek Nuclear Operating Corp.

P.O. Box 360 P.O. Box 411 JGfferson City, MO 65102 Burlington, KS 66839 t

'*Dircctor, Office of Nuclear Material Mr. Merlin Williams I Safety and Safeguards (3 copies) Supt. of Regulatory Quality and U.S. Nuclear Regulatory Commission Administrative Services W2chington, D.C. 20555 Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington, KS 66839 R cords Center Mr. B. H. Little Inntitute of Nuclear Power Operations NRC Senior Resident Inspector Suite 1500 1100 Circle 75 Parkway AtlGnta, CA 30339 P

- - , r---~ - - -

o.,0.

ULNRC-2171 bcc G. L. Randolph J. V. Laux A. C. Passwater/D. E. Shafer/D. J. Walker H. Wuertenbaecher W. R. Campbell C. D. Naslund G. R. Pendergraff -

T. P. Sharkey  !

L. H. Kanuckel T. H. McFarland/M. R. Lane /H. W. Wilson -

E210.0001 '

A160.0761 Nuclear Date r NSRB DFS Chrono

.