05000366/LER-1982-051

From kanterella
Revision as of 04:24, 15 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 82-051/03L-0:on 820609,diesels 2A & 1A Not Tested at Appropriate Test Frequency Due to Misinterpretation of Tech Specs.Caused by Diesel Having Own Test Frequency Based on Failure Rate.Correct Test Frequency Established
ML20055A671
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/29/1982
From: Baxley S
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20055A664 List:
References
LER-82-051-03L-01, LER-82-51-3L-1, NUDOCS 8207190307
Download: ML20055A671 (2)


LER-2082-051,
Event date:
Report date:
3662082051R00 - NRC Website

text

_ ~ ,

WRC FORM 366 U. S. NUCLE AR REGULATORY COMMISSION (7 77)

LICENSEE EVENT REPORT (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

, c6NTROL eLocK: l l l l l l lh lO l i8 l 9l Gl ALICENSEE 7

l E l CODE I l H l 214l@ltb 0 l 0 l - l 0 lLICENSE 0 l 0NUMBER l 0 l 0 l - 10 l 02bl@l264 l 1LICENSE l 1 l TYPE 1 l 140l@l57 l CATb8 l@

CON'T 101il  % "c' l L l@l 0 l 5 l0 l 0 l 0 l 3 l 6 l 668 ]@[ 0 [ EVENT 6 l 0DATEl 9 l 8 l 742 l@l 75 0l REPORT 6121DATE 91 8 l 802 l@

I H 60 61 DOCKET NUMBER 69 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES b10 0 2 1 During cold shutdown on 6-9-82, it wTs determined that due to a misinterpretation of j io i3; ]

Tech. Specs. Sec. 4.8.1.1.2, the 2A and IB diesels had not been tested at the appro- ,

o 4 [ priate test frequency. This is a non-repetitive occurrence. There were no effects ,

i o [ ., i ;

upon public health and safety due to this event. g 10161l i 10171l i 101811 I

  • CSD[ C0DE SL 8 CODE COMPONE NT CODE SUB DE SU E 7

O 9 8

l El El@ W@ [X jg l El Nl Gl Il Nl Elg 9 10 11 12 _ 13 18 19 g gg 20

_ SEQUEN TI AL OCCU R RE NCE REPORT REVISION LE R RO EVENT YE AR REPORT NO. CODE TYPE N O.

@ ,Rgeg l218 22l2 l l-l 23 l0l5l1l 24 26 y

27 l0l3l 28 29 lLl 30 l-l 31 l 0l 32 -

TAKEN A TO ON PL NT MET HOURS 22 S 8 IT FOR B. SU PL1 MAN F CTURER l33X [gl34Z l g l5Z[g 3

lZl@

M l 0 l0 l 0l 31 l

40 O g 41 lNl@

42

{g 43 lF 44 l 0 l1 l 047l@

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i, ioilSince 10-31-78, Tech. Specs. was interpreted to be that each diesel had its own test  ;

i 3 l frequency based on its own failure rate. Tech. Specs. actually requires testing i

,, ,,j i each diesel at the same frequency based on the combined failure rate. Upon PRB re- i

, ., l view of the interpretation change, the correct test frequency was established for  ;

ii g i i each diesel. i 7 8 9 80 STA S  % POWER OTHER STATUS DIS O RY DISCOVERY DESCRIPTION i 5

[_G_J@ l 0 l 0 l 0 l@l NA l l A l@l Personnel Observation l ACTIVITY CO TENT RELE ASE D OF RELE ASE AMOUNT OF ACTIVITY LOC ATION OF RELEASE l1 l 6 I [J_] @ []_Jgl NA l l NA 80 l

7- 8 9 10 11 44 45 PERSONNEL EXPOSURES NUMBER TYPE DE SCRIPTION i i 10l0l0l@lZl@l"

NA _

l

' PERsONNEt iN;uWiES NUMBER DESCRIPTION 7

i a 8 9 l0]0l0l@l 11 12 NA 80 l

LOSS OF OH DAMAGE TO F ACillTY [M TYPE DESCHIMION U 8207190307 820629 l1l9ln 9W @liO NA PDR ADOCK 0500:2366 l 7 S PDR 80 PUB L ICI Y NRC USE ONLY 12101 LLj@l NA l lllllllllllll$

7 8 9 to 68 69 80 5

~

NAME OF PREPARER PHONE:

LEP, #: 50-366/1982-051 Licensee: Georgia Power Company Facility Name: Edwin I. Hatch Docket #: 50-366 Narrative Report for LER 50-366/1982-051 On 6/9/02 at approximately 1600 CDT.and while the unit was in cold shutdown, it was determined that due to a misinterpretation of Tech. Specs. Sec.

4.8.1.1.2, the 2A and la diesels had not been tested at the appropriate test frequency. On 10-31-78, the 2C diesel failed to start for the second time in the last 100 start attempts. At that time the test frequency was increased to every two (2) weeks for the 2C diesel but not for the 2A and 18 diesels. The above Tech. Specs. section requires testing of each diesel at the frequency specified in table 4 . 8 .1.1. 2-1. In the past this was interpreted to be that each diesel had its own test frequency based on its own failure rate. A more thorough review of Tech. Specs, and Reg. Guide 1.108, Rev.1 (Aug.1977) identified the requirement to test each diesel at the same frequency. The frequency is based on the number of failures in the last 100 valid tests of all the unit diesels combined.

Upon discovery of the misinterpretation, the matter was brought before the PRB for resolution. Upon PRB approval, the correct frequency was established for each unit diesel .

This is not a repetitive event. The problem is not applicable to Unit 1.

Unit 1 Tech. Specs. do not call for increased frequency due to start failures.

The health and safety of the public was not affected.

_ _