05000321/LER-1982-035, Forwards LER 82-035/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-035/03L-0
ML20058G893
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/21/1982
From: Nix H
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20058G896 List:
References
PM-82-702, NUDOCS 8208030442
Download: ML20058G893 (1)


LER-2082-035, Forwards LER 82-035/03L-0
Event date:
Report date:
3212082035R00 - NRC Website

text

. ~.

~

beorgir Pow;r Company

  • Pc;t Offica Box 439 Bixl;y, Georgia 31513 Telephone 912 367-7781 912 537-9444 m

Edwin 1. Hatch Nuclear Plant 55 C$

July 21, 1982 ,,

PM-82-702

[

PLANT E. I. HATCH Licensee Event Report ,"*,

Docket No. 50-321 United States Nuclear Regulatory Commission ,

Office of Inspection and Enforcement Region II Suite 3100 101 Marietta Street Atlanta, Georgia 30303 ATTENTION: Mr. James P. O'Reilly Reportable Occurrence 50-321/1982-46 was mailed to the NRC office on July 6, 1982. It was later discovered that the correct Reportable Occurrence number was 50-321/1982-35.

The deviation report was revised to correct the error. Tha writer of the LER, however, submitted the response before

. he received the redistributed copy so that the LER was submitted with the incorrect number 50-321/1982-46. This same LER is being resubmitted as 50-321/1982-35 to correct the error.

If you have any questions concerning this letter, please contact S. B. Tipps at (912) 367-7581, extension 2378.

1 1

~

) 4vt __

, H. C. Nix Plant Manager HCN/SBT/amh xc: J. H. Miller R. J. Kelly G. F. Head J. T. Beckham, Jr.

H. L. Sumner R. D. Baker Control Room File g ygg ggpgd M-2 g:r .2. 2J 6208030442 820721 DR ADOCK 050003g1 PDR