Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis2022-06-0101 June 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis ML21106A0202021-04-0707 April 2021 Enclosure a - Evaluation of Proposed Change L-20-240, License Amendment Request to Adopt TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control2021-03-0505 March 2021 License Amendment Request to Adopt TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control L-20-129, Emergency Plan Amendment Request2020-12-28028 December 2020 Emergency Plan Amendment Request L-20-166, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-24024 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements L-20-188, ISFSI, Davis-Besse Unit 1, and ISFSI, Perry, Unit 1, and ISFSI, Decommissioning Trust: Amendments to Decommissioning Trust Agreements to Update Company Names2020-06-26026 June 2020 ISFSI, Davis-Besse Unit 1, and ISFSI, Perry, Unit 1, and ISFSI, Decommissioning Trust: Amendments to Decommissioning Trust Agreements to Update Company Names L-19-274, License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-3602020-04-24024 April 2020 License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-360 L-19-265, License Amendment Request to Extend Refueling Special Lifting Devices' Interval for Testing to Verify Continuing Compliance2019-12-18018 December 2019 License Amendment Request to Extend Refueling Special Lifting Devices' Interval for Testing to Verify Continuing Compliance L-19-213, Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR2019-12-18018 December 2019 Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR L-19-219, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2019-09-25025 September 2019 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-19-200, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI - Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2019-08-29029 August 2019 ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI - Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-19-073, ISFSI, Davis-Besse, Unit 1, ISFSI, and Perry, Unit 1, ISFSI - Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2019-04-26026 April 2019 ISFSI, Davis-Besse, Unit 1, ISFSI, and Perry, Unit 1, ISFSI - Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-18-046, License Amendment Request to Extend Containment Leakage Test Frequency2018-03-0707 March 2018 License Amendment Request to Extend Containment Leakage Test Frequency L-17-350, Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement2018-02-14014 February 2018 Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement L-17-045, Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control.2017-12-0606 December 2017 Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control. L-17-089, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips2017-06-20020 June 2017 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips L-17-042, Request for Licensing Action to Revise the Technical Specifications2017-06-0808 June 2017 Request for Licensing Action to Revise the Technical Specifications L-17-043, Request for Licensing Action to Revise the Environmental Protection Plan2017-04-26026 April 2017 Request for Licensing Action to Revise the Environmental Protection Plan L-17-052, Supplemental Request Associated with the License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 32017-02-0606 February 2017 Supplemental Request Associated with the License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 L-16-179, License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1. Reactor Core Safety Limits.2016-11-0101 November 2016 License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1. Reactor Core Safety Limits. L-16-236, License Amendment Request for Adoption of Technical Specifications Task Force (Tstr Traveler TSTF-501. Revision 1. Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2016-10-27027 October 2016 License Amendment Request for Adoption of Technical Specifications Task Force (Tstr Traveler TSTF-501. Revision 1. Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control L-16-304, Supplement to Request for License Amendment Approval Delay2016-10-25025 October 2016 Supplement to Request for License Amendment Approval Delay L-16-083, License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 32016-03-15015 March 2016 License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 L-15-195, Application for Order Consenting to Transfer of Licenses and Approving Conforming License Amendments2015-06-30030 June 2015 Application for Order Consenting to Transfer of Licenses and Approving Conforming License Amendments L-14-271, Request for Licensing Action to Amend Technical Specification 3.8.4, DC Sources - Operating2014-11-24024 November 2014 Request for Licensing Action to Amend Technical Specification 3.8.4, DC Sources - Operating L-13-306, Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change2013-12-0606 December 2013 Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change ML13281A5362013-10-15015 October 2013 Meeting Slide for FENOC Presubmittal Guidance Checklist Part I L-12-397, Request to Amend the Price-Anderson Indemnities and Notification of a Name Change to Documents of Regulatory Interest2013-02-19019 February 2013 Request to Amend the Price-Anderson Indemnities and Notification of a Name Change to Documents of Regulatory Interest ML12249A3592012-09-0505 September 2012 License Amendment Request for Adoption of TSTF-275-A, Rev. 0, Clarify Requirement for EDG Start Signal on Rpv... & TSTF-300-A L-12-064, Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process2012-02-22022 February 2012 Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process L-11-331, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.2011-10-11011 October 2011 License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. L-11-322, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.2011-10-0303 October 2011 License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. ML1126402462011-09-20020 September 2011 License Amendment Request to Change the Name of an Owner Licensee to Firstenergy Nuclear Generation, LLC L-11-038, License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation2011-04-12012 April 2011 License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation L-10-200, License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 12010-12-15015 December 2010 License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1 ML1029804462010-10-21021 October 2010 License Amendment Request to Modify Technical Specification 2.1.1, Reactor Core Sls, to Incorporate Revised Safety Limit Minimum Critical Power Ratio Values L-09-074, License Amendment Request to Provide Consistency in Division 3 Emergency Diesel Generator Start Time Technical Specification Surveillance Requirements2009-06-30030 June 2009 License Amendment Request to Provide Consistency in Division 3 Emergency Diesel Generator Start Time Technical Specification Surveillance Requirements L-09-025, ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-03-25025 March 2009 ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. L-09-031, Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control2009-03-11011 March 2009 Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control ML0906306722009-03-0909 March 2009 Enclosure 14: Case Study 10: Perry Inability to Follow the RHR-SDC Required - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf L-08-325, License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 4972008-11-18018 November 2008 License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 497 L-08-046, Request to Adopt TSTF-476-A, Improved BPWS Control Rod Insertion Process (NEDO-33091), Per the Consolidated Line Item Improvement Process2008-02-20020 February 2008 Request to Adopt TSTF-476-A, Improved BPWS Control Rod Insertion Process (NEDO-33091), Per the Consolidated Line Item Improvement Process 2024-01-24
[Table view] Category:Technical Specifications
MONTHYEARML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML21361A2172021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Revision 13 to Technical Specification Bases TS Bases ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, 'Rhr Suppression Pool Cooling' ML21307A1762021-10-28028 October 2021 2 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17305A2132017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML15307A3492016-02-23023 February 2016 Issuance of Amendment Concerning Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control (CAC No. MF3720) (L-14-106) ML15243A1532015-09-0202 September 2015 Correction of Typographical Error Incurred During Prior License Amendment No. 162 ML15201A5292015-08-17017 August 2015 Issuance of Amendment Concerning Technical Specification 3.8.4 DC Sources - Operating (TAC No. MF5298) (L-14-271) ML15160A0282015-06-23023 June 2015 Issuance of Amendment Concerning Adoption of TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TAC No. MF4791)(L-14-137) ML15141A4822015-06-12012 June 2015 Issuance of Amendment Concerning Changes to Pressure Temperature Curves (TAC No. MF4351)(L-14-150) ML15133A5022015-06-10010 June 2015 Issuance of Amendment Concerning Extension of Cyber Security Milestone 8 (TAC No. MF5557)(L-14-421) L-11-338, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 20112011-10-17017 October 2011 Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011 L-11-333, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 20112011-10-13013 October 2011 Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011 L-11-322, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.2011-10-0303 October 2011 License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. ML1116608152011-06-16016 June 2011 Correction Letter License Amendment No. 157 L-10-201, License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 02010-12-15015 December 2010 License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 0 ML1029804462010-10-21021 October 2010 License Amendment Request to Modify Technical Specification 2.1.1, Reactor Core Sls, to Incorporate Revised Safety Limit Minimum Critical Power Ratio Values L-09-025, ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-03-25025 March 2009 ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. ML0824608772008-08-28028 August 2008 Tech Spec Page for Amendment 150 TSTF-476, Improved Banked Position Withdrawal Sequence Control Rod Insertion Process, Per the Consolidated Line Item Improvement Process ML0817503002008-06-19019 June 2008 TS Pages - Issuance of Amendment Revise TSs 3.6.1, 3.6.4 and 3.6.5 ML0811905752008-04-25025 April 2008 TS Pages - Issuance of Amendment No. TSTF-448, Revision 3, Control Room Habitability. ML0726808522007-09-18018 September 2007 License Amendment Request Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0725505472007-09-0505 September 2007 License Amendment Request to Revise Technical Specification 3.6.1, 3.6.4, and 3.6.5 for Containment and Drywell Isolation Device ML0721102792007-07-30030 July 2007 Tech Spec Pages for Amendment 147 to Clarify Technical Specification Requirements Related to Annulus Exhaust Gas Treatment (Aegt) System ML0719402902007-07-12012 July 2007 Technical Specifications, Issuance of Amendment ASTM Standards for Fuel Oil Testing ML0717704662007-06-22022 June 2007 Tech Spec Page for Amendment 145 Scram Discharge Volume Vent and Drain Valves ML0717202522007-06-14014 June 2007 Beaver and Perry, Technical Specifications, Issuance of Amendments Modification of Technical Specification Requirements for Inoperable Snubbers ML0713403922007-05-0909 May 2007 Technical Specifications (Ts), Revise TS 5.5.7, Ventilation Filter Test Program, to Correct Referenced Flow Units ML0712005032007-04-30030 April 2007 Tech Spec Pages for Amendment 142 Regarding Emergency Diesel Generator Surveillance Testing Voltage and Frequency Limits ML0712102912007-04-27027 April 2007 Technical Specifications, Issuance of Amendment Revise TS to Change the Frequency of the Mode 5 Intermediate Range Monitoring Instrumentation Channel Functional Test L-06-172, Units 1 and 2, License Amendment Requests to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2007-01-11011 January 2007 Units 1 and 2, License Amendment Requests to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0700904852006-12-29029 December 2006 Application for a Technical Specification Improvement to Revise Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process ML0629704472006-10-13013 October 2006 License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications ML0618700962006-06-30030 June 2006 Technical Specification, Modifies the Existing TS 3.3.1.3, Oscillation Power Range Monitor (OPRM) Instrumentation, Surveillance Requirement 3.3.1.3.5 ML0615903492006-06-0101 June 2006 License Amendment Request - Revise Mode 3 Hot Shutdown Requirements to Add a Note Addressing Situations When Both Residual Heat Removal (RHR) Shutdown Cooling Subsystems Are Inoperable ML0615903292006-06-0101 June 2006 License Amendment Request - Revise Mode 4 Residual Heat Removal Shutdown Cooling Requirements to Add a Default Condition Addressing Situations When Condition a Cannot Be Met within Its Completion Time ML0605404392006-02-14014 February 2006 Amendment Request to Revise Technical Specification 3.3.1.1 Intermediate Range Monitoring Instrumentation Mode 5 Channel Functional Testing Surveillance Frequency from 7 Days to 31 Days ML0605306202006-02-10010 February 2006 License Amendment Request to Revise Required Action B.1 in the Emergency Core Cooling System Instrumentation Technical Specification to Be Consistent with the Improved Standard Technical Specifications ML0529903232005-10-14014 October 2005 Submittal of Technical Specification Bases, Revision 5 ML0522902522005-08-16016 August 2005 Tech Spec Pages for Amendment 136 Elimination of Monthly Operating Reports and Occupational Radiation Exposure Reports ML0512501942005-04-19019 April 2005 4/19/05, Perry - TS Pages - Issuance of Amendment Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0509600872005-03-31031 March 2005 Tech Spec Pages for Amendment 134 Single Recirculation Loop Operation ML0504505712005-02-10010 February 2005 Tech Spec Pages for Amendment 133 Testing of Safety/Relief Valves ML0503503642005-02-0303 February 2005 Technical Specification Pages Revision of the Minimum Critical Power Ratio Safety Limit ML0419401992004-07-0909 July 2004 Technical Specifications, Issuance of Amendment Regarding Primary Containment and Drywell Isolation Instrumentation to Increase the Analytical Limit for Detected Temperature ML0410400412004-03-31031 March 2004 License Amendment Request Pursuant to 10 CFR 50.90: Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process 2022-09-16
[Table view] |