L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | 24 January 2024 | License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | |
L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 12 September 2023 | Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | |
L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications | 7 August 2023 | License Amendment Request to Remove the Table of Contents from the Technical Specifications | Shutdown Margin High Radiation Area Water Inventory Control Post Accident Monitoring Hydrostatic Scram Discharge Volume |
L-23-146, License Renewal Application for the Perry Nuclear Power Plant | 3 July 2023 | License Renewal Application for the Perry Nuclear Power Plant | |
L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener | 5 June 2023 | License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener | Surveillance Frequency Control Program Offsite Circuit |
CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 14 April 2023 | ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | Safe Shutdown Probabilistic Risk Assessment Cyber Security Decommissioning Funding Plan Large early release frequency Safeguards Contingency Plan License Renewal Fire Protection Program |
L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 18 October 2022 | Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program |
L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 5 August 2022 | Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program |
L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis | 1 June 2022 | Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis | Unanalyzed Condition Shutdown Margin High Radiation Area Tornado Missile Hydrostatic |
ML21106A020 | 7 April 2021 | Enclosure a - Evaluation of Proposed Change | Safe Shutdown Tornado Missile Hydrostatic Functionality Assessment Fukushima Dai-Ichi Tornado Missile Protection Earthquake |
L-20-240, License Amendment Request to Adopt TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control | 5 March 2021 | License Amendment Request to Adopt TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control | Surveillance Frequency Control Program |
L-20-129, Emergency Plan Amendment Request | 28 December 2020 | Emergency Plan Amendment Request | Safe Shutdown Fitness for Duty Health Physics Network Offsite Dose Calculation Manual Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Emergency Lighting Severe Accident Management Guideline Earthquake Deep Dose Equivalent Fuel cladding Minimum staff Fire Protection Program Siren Overexposure |
L-20-166, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 24 September 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level Stroke time Water Inventory Control Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Control of Heavy Loads Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
L-20-188, ISFSI, Davis-Besse Unit 1, and ISFSI, Perry, Unit 1, and ISFSI, Decommissioning Trust: Amendments to Decommissioning Trust Agreements to Update Company Names | 26 June 2020 | ISFSI, Davis-Besse Unit 1, and ISFSI, Perry, Unit 1, and ISFSI, Decommissioning Trust: Amendments to Decommissioning Trust Agreements to Update Company Names | |
L-19-274, License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-360 | 24 April 2020 | License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-360 | Safe Shutdown Anticipated operational occurrence Water Inventory Control Surveillance Frequency Control Program Battery sizing Recently irradiated fuel |
L-19-265, License Amendment Request to Extend Refueling Special Lifting Devices' Interval for Testing to Verify Continuing Compliance | 18 December 2019 | License Amendment Request to Extend Refueling Special Lifting Devices' Interval for Testing to Verify Continuing Compliance | Safe Shutdown Non-Destructive Examination Nondestructive Examination Control of Heavy Loads |
L-19-213, Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR | 18 December 2019 | Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
L-19-219, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 25 September 2019 | Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | |
L-19-200, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI - Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 29 August 2019 | ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI - Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | Earthquake |
L-19-073, ISFSI, Davis-Besse, Unit 1, ISFSI, and Perry, Unit 1, ISFSI - Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 26 April 2019 | ISFSI, Davis-Besse, Unit 1, ISFSI, and Perry, Unit 1, ISFSI - Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | Decommissioning Funding Plan |
L-18-046, License Amendment Request to Extend Containment Leakage Test Frequency | 7 March 2018 | License Amendment Request to Extend Containment Leakage Test Frequency | High winds Packing leak Internal Flooding Probabilistic Risk Assessment Coatings Nondestructive Examination Incorporated by reference Aging Management Foreign Material Exclusion Large early release frequency Moisture barrier Earthquake Maintenance Rule Program Turbine Missile Scaffolding |
L-17-350, Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement | 14 February 2018 | Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement | Surveillance Frequency Control Program |
L-17-045, Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control. | 6 December 2017 | Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control. | Water Inventory Control |
L-17-089, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips | 20 June 2017 | License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips | Surveillance Frequency Control Program |
L-17-042, Request for Licensing Action to Revise the Technical Specifications | 8 June 2017 | Request for Licensing Action to Revise the Technical Specifications | Safe Shutdown Shutdown Margin Grab sample Post Accident Monitoring Probabilistic Risk Assessment Surveillance Frequency Control Program Scram Discharge Volume Recently irradiated fuel |
L-17-043, Request for Licensing Action to Revise the Environmental Protection Plan | 26 April 2017 | Request for Licensing Action to Revise the Environmental Protection Plan | Biofouling |
L-17-052, Supplemental Request Associated with the License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 | 6 February 2017 | Supplemental Request Associated with the License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 | Shutdown Margin High Radiation Area Hydrostatic |
L-16-179, License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1. Reactor Core Safety Limits. | 1 November 2016 | License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1. Reactor Core Safety Limits. | Reactor Vessel Water Level Anticipated operational occurrence Fuel cladding |
L-16-236, License Amendment Request for Adoption of Technical Specifications Task Force (Tstr Traveler TSTF-501. Revision 1. Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | 27 October 2016 | License Amendment Request for Adoption of Technical Specifications Task Force (Tstr Traveler TSTF-501. Revision 1. Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program |
L-16-304, Supplement to Request for License Amendment Approval Delay | 25 October 2016 | Supplement to Request for License Amendment Approval Delay | |
L-16-083, License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 | 15 March 2016 | License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 | Reactor Vessel Water Level Hydrostatic Probabilistic Risk Assessment |
L-15-195, Application for Order Consenting to Transfer of Licenses and Approving Conforming License Amendments | 30 June 2015 | Application for Order Consenting to Transfer of Licenses and Approving Conforming License Amendments | |
L-14-271, Request for Licensing Action to Amend Technical Specification 3.8.4, DC Sources - Operating | 24 November 2014 | Request for Licensing Action to Amend Technical Specification 3.8.4, DC Sources - Operating | Safe Shutdown Surveillance Frequency Control Program |
L-13-306, Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change | 6 December 2013 | Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change | Safe Shutdown Shutdown Margin Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Tornado Generated Missile Abnormal operational transient Tornado Missile Protection Large early release frequency Earthquake Deep Dose Equivalent Fuel cladding Recently irradiated fuel Backfit Power Uprate Overexposure |
ML13281A536 | 15 October 2013 | Meeting Slide for FENOC Presubmittal Guidance Checklist Part I | Probabilistic Risk Assessment Exemption Request |
L-12-397, Request to Amend the Price-Anderson Indemnities and Notification of a Name Change to Documents of Regulatory Interest | 19 February 2013 | Request to Amend the Price-Anderson Indemnities and Notification of a Name Change to Documents of Regulatory Interest | |
ML12249A359 | 5 September 2012 | License Amendment Request for Adoption of TSTF-275-A, Rev. 0, Clarify Requirement for EDG Start Signal on Rpv... & TSTF-300-A | |
L-12-064, Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process | 22 February 2012 | Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process | Hydrostatic Incorporated by reference |
L-11-331, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. | 11 October 2011 | License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. | Safe Shutdown High winds Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment Qualified Offsite Circuit Condition Adverse to Quality Battery sizing Fuel cladding Offsite Circuit Power change |
L-11-322, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. | 3 October 2011 | License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Fuel cladding Offsite Circuit |
ML112640246 | 20 September 2011 | License Amendment Request to Change the Name of an Owner Licensee to Firstenergy Nuclear Generation, LLC | |
L-11-038, License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation | 12 April 2011 | License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation | |
L-10-200, License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1 | 15 December 2010 | License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1 | Hydrostatic Abnormal operational transient Fuel cladding |
ML102980446 | 21 October 2010 | License Amendment Request to Modify Technical Specification 2.1.1, Reactor Core Sls, to Incorporate Revised Safety Limit Minimum Critical Power Ratio Values | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Abnormal operational transient Fuel cladding |
L-09-074, License Amendment Request to Provide Consistency in Division 3 Emergency Diesel Generator Start Time Technical Specification Surveillance Requirements | 30 June 2009 | License Amendment Request to Provide Consistency in Division 3 Emergency Diesel Generator Start Time Technical Specification Surveillance Requirements | Safe Shutdown Reactor Vessel Water Level Qualified Offsite Circuit Fuel cladding Offsite Circuit |
L-09-025, ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. | 25 March 2009 | ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. | Safe Shutdown |
L-09-031, Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control | 11 March 2009 | Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control | Incorporated by reference Scram Discharge Volume Overtravel |
ML090630672 | 9 March 2009 | Enclosure 14: Case Study 10: Perry Inability to Follow the RHR-SDC Required - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf | Hydrostatic |
L-08-325, License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 497 | 18 November 2008 | License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 497 | Incorporated by reference Foreign Material Exclusion |
L-08-046, Request to Adopt TSTF-476-A, Improved BPWS Control Rod Insertion Process (NEDO-33091), Per the Consolidated Line Item Improvement Process | 20 February 2008 | Request to Adopt TSTF-476-A, Improved BPWS Control Rod Insertion Process (NEDO-33091), Per the Consolidated Line Item Improvement Process | Incorporated by reference |