Monthly Operating Rept for Jan 1982
ML20050B135
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 02/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20050B129 List:
References
NUDOCS 8204050032
Download: ML20050B135 (6)


Text

. - - - - - - . - - - - - - - -

OPERATING DATA REPORT Di JKET NO. 50-369 DATE 2-15-82 C05fPLETED BY J. A. Reavis-TELEPl!ONE 704-373-8552 OPERATING STATUS McGuire Unit 1 Notes

1. Unit Name: -
2. Reporting Period. Januarv. 1982
3. Licensed Thennal Power I5!WO: 3 411
4. Nameplate itating (Gross SIWE):

1 220

5. Do';n Electrical RatinMNet MWel: 1 180 6.'Masimum Dependable Capacity (Grow MWe):
7. Masimum Dependable Capacity (Net MWe):

S. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Give Reasons:

9. Power Level To which Restricted. If Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr..to.Date Cumulative

11. liours In Reporting Period 744.0 744.0 1 488.0
12. Number Of li.mrs Reactor W. $ Critical 675.7 675.7 721.3
13. Reactor Resene Shutdown llours
14. liours Generator On.Line 667.2 667.2 712.8
15. Unit Resene Shutdown flours - - -
16. Gross Thermal Energy Generated (51Wil) 1 273 713 1 273 713 1 358 668- .
17. Gross Electrical Energy Generated (MWl') 450 940 _,

450 940 479 376 IS. Net Electrical Energy Genera'ed (MWil) 424 022 424 022; _ _

443 078

19. Unit Senice Factor 89.7 89.7 47.9

- 20. Unit Availability Factor 89.7 89.7 47.9

21. Unit Capacity Factor (Using MDC Nett 48.3 48.3 25.2
22. Unit Capacity Factor (Using DER Net) 48.'3 48.3 25.2
23. Unit Forced Outace Rate 10.3 10.3 52.1
24. Shutcouns Scheduled Oser Nest 6 Months (Type.Date.and Duration of Each):

Eddy Current Testing - February 21, 1982 - three weeks

23. If Shut Down At End Of Repor Perind. Estimated Date of Startup:

2b. Units In Test Status (Prnir to Commereul Operation): Forecast Achioed INITi \ L CRITICA LI T Y INITIAL ELEC1RICITY CO\lNIERCI A L OPLR A flON 8204050032 820215 PDR ADOCK 05000369 e)/771 R PDR

UNil S!!UTDOWNS AND POWER REDt:C110NS DOCKET NO.

UNIT N Ah!E JcGuire Unit 1 ~

DATE 2-15-82 CONtPLETED IlY J. A. Reavis REPORT AfONTil Januarv. 19S2 TELEP!IONE 704-373-8552

= -

= r, '5 v. : . E ~~

, .2 ? E: - , .E X Licensee g -r, p't Cause & Corrective

% Da te ~@ 4 .5 s E Esent sg Action to i E- s fE d 5 5 ;--

<. Report : EU 5' '

Prevent Reenrrence g L C

1 82-01-01 F 31.67 A -

IIA 'RJRBIN Conpletion of generator drying and hydrogen cooler replacement.

2 82-01-03 F 9,97 A 3 EB RELAYX An electrical switchgear nroblem caused a trip of the "A" ThT'T resulting in a LO-LO steam generator IcVel tripping the reactor.

3 82-01-05 F 6.83 B 3 ZZ ZZZZZZ Reactor tripped during a periodic test due to a procedure deficiency.

4 S2-01-09 F 11.67 B 3 IIA TURBIN During maintenance to the turbine controls (DEII), the turbine / generator tripped, trioping the reactor.

5 82-01-11 F 11.15 A 3 IA INSTRU Frozen instramentation caused a reactor trip and safety injection.

I 2 3 4 P Finced Reason: hiethod: Exhibit C . instrnssions S Sc hed nfed A Equipment Failure (Lxplam) 141anual for Preparation of Data 1141ai..icnance or Test 24f an nal Scram. Entry Sheets tor Licensee C Refueling 3 Automatic Scram Event Report (LER) File tNtlRI G.

D Regulat ary Restriction 4-Ot her ( E xplain) 01ol1 E-Ope.aior Training 1 License Examination F Admimstrative 5 .

G-Opeiational Leror (Esplain) Eshibii ! Same Souice (9/77) Il-Ot her ( Explain)

D 50-369 -

UNIT SliUlDOWNS AND POWER REDUClIONS U A E McGuire Unit 1 ^

DYIE 2-15-82 COMPLETED IlY J. A. Reavis III~. PORT MONTil .Tanuarv . 198~3 TELEPit0NE 704-373-8552

--, .5 E "k A Es Licensee ,E n, h',i cause & correctise N"- Da t e 5? i 5sE Event 3g 9- Action to H

$5 5 5;55 Repori e v) U o

5O Prevent lleentrence g

O 1-p 82-01-14 F --

II -- CB ITEXOI Reduced to 50% power until an outage for further inspection and analysis of steam, generator condition, 6 82-01-15 F 5.55 A 2 IA INSTRU Operator tripped reactor on indication of "B" reactor coolant pumn high vibration as procedure instructed, 2-p 82-01-15 F -- II --

CB IffEXQI IIolding at 50% power imtil an outage for further inspection and analysis of steam generator condition, i 2 3 4 F: l'orced Reason: Method: Exhibit G - lest ructions S. Stheduled A Equipurni Failure (Explain) 1-Manual for Preparatant of Data ll Maintenance or Test 2 Manual Serain. lintry Sheets for Licemee C-Refueling 3 Autoniatic Scram. Esent Report (l.l!R) File iNURI:G-D Regulatory Restriction 4 Other (Explain) 0161)

I: Ope.ator Training 1 License Examination F Adininistrative 5 .

G Opetational La ror (Explain) Eshibit 1 -Same Souree 19/77) Il-Oiher ( Explain )

e a

DOCKET NO. 50-369 UNIT McGuire Unit i 2-15-82 DATE AVERAGE DAILY UNIT POWER LEVEL MO?ffil January, 1982 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe net) DAY (SIWE net) .

17 503 1

183 18 638 2

613 310 3 39 525 20 510 4

491 21 510 5

944 22 sia 6

993 23 516

.3 7 841 24 516 8

496 25 517 9

634 26 437 10 313 27 546 11 824 28 543 12 1 075 29 527 13 f 30 536 14 1 067 333 31 541 15 502 16 g

DAILY UNir POWER LEVEL FOR\1 INSTRUCTIONS i

On this form, hst ila aserare daily tuut power lesel in M'Ne net for each day m the reporting n.onth.

' Compute to the nearest whole megawatt.

These figures will i e used to plot a graph lor each reportintt month. Note that by usinsi maximum dependable capacity tor the net electrical ratm t of the umt. there may be .it casions when the daily average power lese; euceth the 1t10

  • hoe f or the restrated power lesel Imel. In such cises, the average daily unit power output sheet should be footnoted to t splam the app.uent anomaly.

DOCKET NO: 50-369 UNIT: McGuire Unit 1 DATE: 2-15-82 NARRATIVE

SUMMARY

MONTH: January, 1982 McGuire 1 returned to service on January 2 and increased to 75% power.

A switchgear problem resulted in the loss of the unit on January 3.

It was returned to service the following day and increased in power to 90% for testing.

On January 5, a procedure deficiency caused a reactor trip during a periodic test. The unit was returned to 90% power the same day and testing continued. Following completion of testing at 90%, power was reduced to 75% on January 7, to await confirmation of a procedure change before escalating to 100% power.

Another trip of the unit occured on January 9 while maintenance was in progress on the turbine control (DEH) system. It was returned to 75%

power on January 10. Freezing instrumentation lines resulted '.n a recator trip on January 11. It was returned to service the same day.

The reactor was increased to 100% power on January 13, for a twenty four (24) hour period. Power was then reduced to 50% until an outage for further inspection and analysis of the steam generator condition.

By procedural instructions, the reactor was manually tripped on January 15, due to an indicated high vibration on one of the reactor coolant pumps.

The indication was false and the unit was returned to the 50% power level within a few hours.

Increased to 75% power on January 18, to meet system demand. After peak the unit was reduced to 50% power and continued at this level the remainder of the month.

. MONTHLY REFUELING INFOPJtATION RF.0UEST

1. Facility name: __ McGuire Unit 1 .

2 .- Scheduled next refueling shutdevn: June, 1983 .

3. Scheduled restart following refueling: .

4, Will refueling or resu=ption of operation thereafter require a technical specification change or other license amendatnt? .

If yes, what will thes'c be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? .

If no, when is review scheduled? .

5 Scheduled date(s) for submitting proposed licensing action and supporting in f o rma t ion : .

6. I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Sumber of fuel assemblics (a) in the core: 193 .

(b) in the spent fuel pool: 20 .

8. Present licensed fuel pool capacity: 500 .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accccmodated by present licensed capacity: .

DUKE PG.4ER COMPANY Date: February, 1982 .

Name of

Contact:

J. A. Reavis .