McGUIRE NUCLEAR STATION l
Operating Status Report I
1.
Personnel Exposure For the month of December, no individual (s) excedded 10 percent of their i
allowable annua 1' radiation dose limit.
l 2.
The total station liquid release contribution to whole body dose for l
December has been compared with the Technical Specifications annual value of 3 mrem; the total release for December was less than 10 percent.of j
this limit.
1 The total station gaseous release contribution to-any organ dose for December has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for December was'less than 10 percent of this limit.
1 a
4 1
f I
8204050042 820215 PDR ADOCK 05000369 R
CORRECTED COPY OPERATING DATA REPORT.
DOCKET NO; 50-369 DATE 2-15-82 CO>lPLETED BY J. A. Reavis TELEPilONE 704-171-8532 OPERATING ST.\\TUS
- 1. Unit Name:
McGuire Unit 1 Notes
- 2. Reporting Period:
December, 1981
- 3. Licensed Thermal Power talWti:
3 411 1 220
.l. Nameplate Rating (Grow ilwel:
- 5. Design Electrical RatingINet alWen:
1 180
- 6. Stasimum Dependable Capacity (Gross.\\lWe):
- 7. bla\\imum Dependable Capacity (Net alw l:
820 e
S. If Changes Occur in Capacity Rating titems Number 3 Through ') Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. lf Any (Net >!We):
- 10. Reasons For Restrictions. lf Any:
This 51onth Yr..to Date Cumulative 744.0 744.0 744.0
- 11. Ilours in Reporting Period
- 12. Number Of 11 mrs Reactor Was Critical 45.7 45.7 45.7
- 13. Reactor Resene Shutdown flours
- 14. Ilours Generator On Line 45.7 45.7 45.7
- 15. Unit Resene Shutdown !!ours
- 16. Gross Thermal Energy Generated (>lwill 84 955 84 955 84 955 28 436 28 436 28 436
- 17. Gross Electrical Energy Generated (.\\lWil)
IS. Net Electrical Energy Generated (SIWil) 19 056 19 056 19 056
- 19. Unit Service Factor 6.1 6.1 6.1 6.1 6.1 6.1
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Uning.\\lDC Nett 2.2 2.2 2.2
- 22. Unit Capacity Factor (Using DER Net) 2.2 2.2 2.2
- 23. Unit Forced Outace Rate 93.9
'93.9 93.9
- 24. Shutdowns Scheduled Oser Nest 6 ilonths(Type.Date.and Duration of Eacht; Bearing Inspectitn S/G Eddy Current Testing to February is shutdown Online March 7, 1982 25 If Shut Down -\\t End Of Report Permd. Estimated Date of Startup: January 2 1982
- 26. Units In Test Status (Prmr to Conunercul Operationj:
Forecast Achiesed INITI \\ L CRITICAll1 Y INill \\L LLLClRICIf Y CO\\1\\lLRCI \\ L Ol'LR A flON (9/77)
8 CORRECTED COPY 50-369 7-DOCKET NO.
UNITSilUTDOWNS ANDl'OWEli REDUC 110NS UNIINAMg McGuire Unit l'.
DA TE 2-15-82 COMPLETED IlY J. A. Reavis REPORT MONTl! December. 1981 TELEPilONE ' 704-373-8552 "L
c
.] g 4YE Licensee
,E -r,
[*?
Canse A corrective o
No.
Ibte i
5g js&
Event 3,y F-Action to
~gg Report er mL E'
Prevent ' Recurrence y 2,,
d' o
o g
C 1-p 81-12-01 S
3 ZZ ZZZZZZ Holding at 75% power for power escalation testing.
1 81-12-02 F
.33 B
3 ZZ ZZZZZZ During shutdown to eddy current steam generator tubes, t-he unit tripped while performing a loss of offsite power test.
2 81-12-02 F
218.00 B
CB HTEXCH Eddy current of selected tubes in the "A" steam generator.
3 81-12-12 F
480.00 A
HA
'IURBIN Extensica to steam generator outage for replacement of electrical generator hydrogen cooler.
I 2
3 4
17: Forced Reamn:
Method:
Exhibit G. instructions S: Scheduleil A. Equipment Failure (Explain) 1 -Manual for Preparation of Data 11 Maintenance of Test 241anual Scram, Entry Sheets for Licensee C-Refueling 3 Automatic Serain.
Event Report (LElt) File (NURI:C.
D.Itegulatory Restriction 4 Other(Explain) 0161)
E Ope.ator Training & License Examination F Administrative 5
G-Operational E ror (thplain)
Eshibit 1 - Sanie Soinee (9/77)
II-Ot her (lixplain)
.