ML20052D861

From kanterella
Revision as of 18:22, 9 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Bechtel Power Corp 820430 Ltr & Seismic Evaluation of Wolf Creek Generating Station Structures Using Lll Spectrum, Per 820319 Meeting.Info Will Be Incorporated Into FSAR
ML20052D861
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/03/1982
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20052D863 List:
References
KMLNRC-82-192, NUDOCS 8205070265
Download: ML20052D861 (3)


Text

{{#Wiki_filter:AS AND ELECTRIC COMPANY THF ELECTRC COMPA p RECEtygg 9 otr %s t worsten 2 fg - . , - - . . - , _ . . . Igegu _ May 3, 1982 ruc

                                                                          %                     4 Mr. Harold R. Denton, Director                              %

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 KMLNRC 82-192 Re: Docket No. STN 50-482 Ref: Letter KMLNRC 82-182 dated March 26, 1982, from GLKoester, KG&E, to HRDenton, NRC Subj: Additional Information

Dear Mr. Denton:

Kansas Gas and Electric Company representatives met with the NRC on March 19, 1982, to discuss seismic design margins in Wolf Creek structures and components assuming a Wolf Creek Site specific response spectra loading. During the meeting the Geotechnical Engineering Branch requested that some additional information be provided for the ultimate heat sink dam. That information was pro-vided in the Referenced letter. Transmitted herewith is the seismic design margin evaluation for the essential service water system (ESWS) pumphouse, safety-related manholes, valvehouse and discharge structure. This infomation will be formally incorporated into the Wolf Creek Generating Station, Unit No. 1, Final Safety Analysis Report in Revision 9. This information is hereby incorporated into the Wolf Creek Generating Station, Unit No. 1, Operating License Application. Yours very truly, GLK:bb

                                                                                         %ss)bd &

Attach cc: Mr. J.B. Hopkins (2) Division of Project Management Office of Nuclear Reactor Regulation 8205070265 820503 PDR ADOCK 05000482 U.S. Nuclear Regulatory Commission A PDR Washington, D.C. 20555 Mr. Thomas Vandel Resident NRC Inspector ' Box 311 ' Burlington, Kansas 66839  ! 201 N. Market -Wictuta, Kansas - Mat 1 Address: PO. Box 208 i Wichita, Kansas 67201 - Telephone: Area Code (316) 261-6451

OATII OF AFFIRMATION STATE OF KANSAS )

                                                    ) SS:

COUNTY OF SEDGWICK) ~ I, Glenn L. Koester, of lawful age, being duly sworn upon oath, do depose, 4 state and affirm that I am Vice President - Nuclear of Kansas Gas and Electric Company, Wichita, Kansas, that I have signed the. foregoing letter of transmittal, know the contents thereof, and that all statements contained therein are true. KANSAS GAS AND ELECTRIC COMPANY By 4th / // . y Q ,. Glenn L. Koester Vice President - Nuclear 4 W.B. Walker, Secretary ) STATE OF KANSAS )

)~SS

COUNTY OF SEDGWICK) e BE IT PEMEMBERED, that on this 3rd day of May, 1982 , before 4 me, Jerry L. Malmgren ,a Notary, personally appeared Glenn L. Koester, Vice President - Nuclear of Kansas Gas and Electric Company, Wichita, Kansas, who is personally known to me and who executed the foregoing instrument, and he duly acknowledged the execution of the same for and on behalf of and as the act and deed of said corporation. IN WITNESS WilEREOF, I have hereunto set my hand and affixed my seal the date and year above written. p*,, . t.\

      , s
                      ....h..L.Pyq;             ' .fg.

fi #

                 .O
                                                                          / 4
                                                                                         ._NA W
               ";;$lk V/ '                 /     " ' 
                         .    ,a I [[n expires __

M2 /ff@

               , #'e tes e s e s.s t 

g-

Bechtel Power Corporation Engineers - Constructors . 15740 Shady Grove Road i Gaithersburg, Maryland 20877 l 301 - 258-3000 l l Mr. M. L. Johnson I Manager, Nuclear Plant Engineering APR 3 01982 Kansas Gas & Electric Co. 201 North Market St. Wichita, Kansas 67201 BLKE 1 File: 0540.1, 1073 Bechtel Job No. 10881 SNUPPS Project Wolf Creek Seismic Analysis Encl: A. Report: Seismic Evaluation of Wolf Creek Generating Station Using Livermore Spectrum (Rev. 1)

Dear Mr. Johnson:

We are enclosing Revision 1 of the subject report, dated April 30, 1982. The report, originally transmitted on April 6, 1982 via BLKE-738 was revised to incorporate K,G&E's comments as per telephone conference between Dan Green /Candace Sprout (KG&E); and L. Rotondo/G. Goddard /R. Burris/P. Labarta (Bechtel) on April 20, 1982. Very truly yours, -

                                               ._/           /        .-
                                                .glif; r[O '

J. H. Smith Project Engineering Manager PL/ek cc: N.A.Petrick,w/1 Eely C. Sprout, (KG&E) ; /8'- cl. A G. Rathburn, (KG& , w/1 Encl. A i-}}