IR 05000277/2011009 and 05000278/2011009; 04/15/2011 - 04/22/2011; Peach Bottom Atomic Power Station Plant; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event
ML111300540
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/13/2011
From: Doerflein L T
Engineering Region 1 Branch 2
To: Pacilio M J
Exelon Generation Co, Exelon Nuclear
Shared Package
ML111300168 List:
References
IR-11-009
Download: ML111300540 (24)


Text

May 13, 20L1.Mr. MichaelJ. PacilioSenior Vice President, Exelon Generation Company' LLCPresident and Chief Nuclear Otficer, Exelon Nuclear4300 Winfield Rd.Warrenville, lL 60555

SUBJECT: PEACH BOTTOM ATOMIC POWER STATION _ NRC TEMPORARYI NSTRUcIoN 2s 1 5/1 s5 iNrsFecr oN REpoRT osooo277 t201 1 009 AN D05000278/201 1 009

Dear Mr. Pacilio:

On April 22,2011, the U.S. Nuclear Regulatory CSmmission (NRC) completgd an inspection atyour peach gottom'Atomic power statiSn, Jsing Temporarv lhstruction 2515l183, "Followup tothe Fukushima Daiichi Nuclear station'Fueio"il"g" Event-." The enclosed inspection report.documents the inspection results which *"t" Jit.,itsed on Aprll22,2011, with Mr' Navin andother members of Your staff.The objective of this inspection was to promptly assess the capabilities of Peach Bottom Atomicpower station to ,"rpono to eitraoroinary consequenc_es.simi[ar to those that have recentlyoccurred at the Japanese Fukushima o"ii.ni Nuciear station. The results from this inspection,along with the r"rufii from this inspeciion performed at.other operating commercial nuclearplants in the United states will be used to evaluate the u.s. nuclear industry's readiness tosafely respond to similar events. These results will also help the NRC to determine if additionalregulatory actions are warranted.All of the potential issues and observations identified by this inspection are contained in thisreport. The NRC,s Reactor Oversight Process willfurtlier evaluate any issues to determine ifthey are regulatory findings or violations. Any resulting findings or violations will be documentedby the NRG in " t!p"t"t"-report. You are not required to respond to this letter' In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosure will be made available electronically for public inspection in the NRCPublic Document Room or from the Publicly Available Records (PARS) component ofNRC's Agencywide Documents Access and Management System (ADAMS), accessible fromthe NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic ReadingRoom).

Sincerely,a%-^,,--,^--PK) *J!t*ILawrence T. Doerflein, Chief /Engineering Branch 2Division of Reactor SafetyDocket Nos.: 50-277, 50-278License Nos.: DPR-44, DPR-56

Enclosure:

f nspection Report 05000277 1201 1 009 and 0500027 81201 lOOgcc w/encl: Distribution via ListServ