ML18136A311

From kanterella
Revision as of 05:13, 23 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to NRC 791123 Ltr Re Violation Noted in IE Insp Repts 50-280/79-63 & 50-281/79-83.Corrective Action: Design Change on Replacement Starting Contactors Completed
ML18136A311
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/19/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7912260244
Download: ML18136A311 (2)


Text

.....

  • vi:iici:-i~IA EiEicTR'.Ic; AN>> 'Po~En CoMPANY RI(?HM;ONl:>,VJ:RGINIA. 2.3~i61 .*
  • 3: .. . . *. ~- *.**o* ,-~- *1*1** * *,.,. * *. *.
  • i'-.-.... 0,*"*/**1')*3** a 1',o_~-:--8.5 ) . .. ,. .7 .,
  • *-11{ **<,*** .* .
  • .*. r.. ames ._,, *. - h0.l  ;-:Y.,-::,_,1.reci::qr -:-:.:*, .... :* ._...,,~r,L_.cd.
  • .* OfUi::'e, of..in~pe.t.t16n ~ln<l **inro.r.ce>_m6nti-
  • PQ/JiJ-fTi:ba{v*. .

. '1j. s:; }:ucle"ar* -R~gul~t*~*ry Commission . Doci~i_:;.t' Hos-: 50.;;230 .

.Reg:ionII} *: ... *:* .* ** ' .. ,, . ..., . . -* so:2s.1 **

  • . : .101_ iJ?rif.tf,1, St.r~et, .. g;_ilte 31QO :Lfc'eri_se 'No_s:. DFR~32

. Atlanta_;

C--eorg"ia.

  • 30303*. npn_.:...37.

.n,,, ;r.-:'.,,*lr. .. :o* 1 '-::i( -1.* 1**1*~, ;* .. -

.*\:.* c:.. '. -*' -o* . *;- .) * *.

.we*: h:~v~' r,~vteired'.'your lettit>i\ o.f' I,ioy~nibAr *:t:3~*::1979 ;-:: in *r~fe~'er1di{ to tli.e.*

inspeei::Lor1 *conducted at:. -s1:1*rr.y-::Po~:i"er Stctiion*:.Un.its .l'1q_S~ ~~~:_2 .on ~epter.ib~.r 24.;.2B:; *.*19 79 *,.

  • a11cl *report~<:1 in.' I.R: Irispection:. Rep.art* N.6.s *. ~,280/.79-63 ]and S.0"7'2B,l./79~83},.: . .

Cx,1r

':i:es"t>on,sE~

toX:thii.,

.spcc:tfJ.c infrrictio'n

. . . is >iliac'fi(;tr:~

. . . \ *.*

. Fe.- ha~e d~ter~in~d _:fhat n:o. P~OJ),d:~-ta:ry:infoi,,;ation *is conta:ined. :in Jhe reports\'. i ~'-'lc~ordlngl.y{th~ *v1:*r.~i-rui*:E1~:"dt:fic 'ai1d **,fower, Cor1;pa~y h;is .. no ob;.'.

- iectic>'n

. . ~- .

to* tliese*

insnect:i.on

.* *.. ~- ~ . . .. .

-r'ei)oi'ts.

being*

made a *rn~tter .

of public cUsclc.rsurr.> *

  • c ~- *}f~-
  • Sta_l lin*gt;
  • .Vi9e_ Pre*sJ.de'qt.-'Power: Suppl:y .*.
  • ancl.. P1.~oduciiob

.Qper~tions

  • . '~-1 .

)~: ..

  • j* :*. ~.

.: ' ,~

. ,r,* , ..

  • -----**** ***-*--*--------- . - - ~ * *-----------*--**-* . - - ----**--~-.---~*--.::;-;,-,

---*~:~:..a.-=~---,---=~..r--*-


**------- -* " -.A .~---:s

~ *--- -. **--_'I

..,..;" . -~*

I Attachment.

Page 1 SURRY POWER STATION RESPONSE TO NOTICE OF VIOLATION REPORTED IN INSPECTION REPORT NOS. *-* ... ,'

50-280/79-63 AND 50-281/79-83 NRC Comment :

As required by 10 CFR 50 Appendix B, Criterion V which states in part that "Activities affecting quality shall be prescribed in documented instructions, procedures, or drawings, of a. type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings" and as implemented by the Nuclear Power Station Quality Assurance Manual (NPSQAM), Section 2 (QA Program), "Design Changes must be processed and evaluated using the procedures of NPSQAM, Section 3.

Contrary to the above, on September 21, 1979, a design change was made to the starting circuit of a Safety Class I emergency diesel fire pump engine without a design change request being submitted and evaluated (MR 5-0908210831).

This is an infraction.

Response

  • The non-compliance is correct as stated.

1.) Corrective steps which have been taken and results achieved:

The starting circuit of the Emergency Diesel Fire Pump was*proven operable by performing PT-24. 1. A Design Change has been completed on the replacement starting contactors. The Design Change concluded the _

replacement of the #118848 magnetic switch with the Cummins recommended

  1. 199573 D.C. relay results in an improved starting circuit.

2.) Corrective steps which will be taken to avoid further non-compliance:

Futnre changes to safety-related systems will be accomplished by design change in accordance with NPSQAM, Section 3, 3.) Date when full compliance will be achieved:

Full compliance has been achieved.

I l