Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages IR 05000413/19980131999-08-0202 August 1999 Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & Insp ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units IR 05000413/19990101999-07-22022 July 1999 Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29 ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20196E9541999-06-18018 June 1999 Forwards SG Tube Insp Conducted During Unit 1 End of Cycle 11 Refueling Outage.Attachments 1,2,3 & 4 Identify Tubes with Imperfections in SGs A,B,C & D,Respectively ML20195K4571999-06-14014 June 1999 Forwards MORs for May 1999 & Revised MORs for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20195J1691999-06-10010 June 1999 Forwards Written Documentation of Background & Technical Info Supporting Catawba Unit 1,notice of Enforcement Discretion Request Re TS 3.5.2 (ECCS-Operating),TS 3.7.12 (Auxiliary Bldg Filtered Ventilation Exhaust Sys) ML20217G5771999-06-0909 June 1999 Forwards Post Exam Comments & Supporting Reference Matls for Written Exams Administered at Catawba Nuclear Station on 990603 05000414/LER-1999-002, Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 9907081999-06-0303 June 1999 Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 990708 ML20207F2381999-06-0101 June 1999 Forwards Copy of Catawba Nuclear Station Units 1 & 2 1998 10CFR50.59 Rept, for NRC Files ML20195J1131999-05-26026 May 1999 Requests Approval to Change Cycle Dates for Two Year Requalification Training Program Required by 10CFR55.59,to Improve Scheduling of Requalification Exams to non-outage Periods 05000413/LER-1999-007, Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section1999-05-26026 May 1999 Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section ML20195B4751999-05-24024 May 1999 Forwards Rev 7 to UFSAR Chapter 2 & Chapter 3 from 1998 UFSAR for Catawba Nuclear Station.List of Instructions on Insertion Encl ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers 05000413/LER-1997-009, Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept1999-05-17017 May 1999 Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206R1721999-05-13013 May 1999 Forwards Monthly Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 ML20206T0281999-05-12012 May 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual. Document Constitutes Chapter 16 of UFSAR 05000413/LER-1999-006, Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 9906071999-05-10010 May 1999 Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 990607 ML20206N8201999-05-10010 May 1999 Forwards Revs 15 & 16 to Catawba Unit 1 Cycle 12 COLR, Per TS 5.6.5.Rev 15 Updates Limits for New Catawba 1 Cycle 12 Reload Core & Rev 16 Revises Values Re Min Boron Concentrations for Rwst,Cla & SFP ML20206J4431999-05-0303 May 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e).Document Constitutes Chapter 16 of UFSAR ML20206D2141999-04-29029 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Catawba Nuclear Station,Units 1 & 2, Per Plant TS 5.6.3. Rept Contains Listed Documents ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L5491990-09-14014 September 1990 Forwards Proprietary Response to Question Re Scope of Review of Topical Rept, Safety Analysis Physics Parameter & Multidimensional Reactor Transients Methodology, Per & 900723 Meeting.Response Withheld ML20059L5521990-09-14014 September 1990 Forwards Response to 18 Questions Re Topical Rept DPC-NE-2004,per NRC 900802 Request for Addl Info.Encl Withheld (Ref 10CFR2.790) ML20059K2021990-09-12012 September 1990 Submits Supplemental Response to Generic Ltr 89-14, Svc Water Sys Problems Affecting Safety-Related Equipment. Intake Structure Insp Program Developed.Procedures for Insp Implemented & Intake Structures Sampled & Analyzed ML20064A8041990-09-0505 September 1990 Notifies NRC of Mod to 890301 Response to Violations Noted in Insp Repts 50-413/86-18-01 & 50-414/86-18-01 Re Valves. All Valve Locking Mechanisms Would Be Installed by End of Unit 2 Refueling Outage (Approx Aug 1990) ML20064A5741990-09-0404 September 1990 Discusses Re Info to Support Util Position Relative to Resolving Issue of Main Steam Line Breaks Inside Ice Condenser Containments & Requests That Info Be Withheld (Ref 10CFR2.790) ML20059G3011990-09-0404 September 1990 Forwards Response to NRC 900327 Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20059G8321990-08-30030 August 1990 Withdraws 880726 Proposed Tech Spec Change,Clarifying Tech Spec 3/4.7.6 Re Emergency Power Requirements for Control Room Ventilation Sys ML20059D2011990-08-27027 August 1990 Forwards Piedmont Municipal Power Agency , Authorizing Use of Annual Rept for NRC Docket Requirements ML20059D2441990-08-24024 August 1990 Forwards Special Rept PIR-1-C90-0261 on 900725 Re Cathodic Protection Sys Failure to Pass Acceptance Criteria of 60-day Surveillance.Std Work Request Generated to Check Voltage Potential at Test Station TS-36 on Weekly Basis ML20056B4981990-08-22022 August 1990 Responds to NRC Request for Addl Info Re General Relief Request for Pump Vibration Submitted 900315.Relief Request Changed to Insure Data Taken Over Range That Encompasses All Main Potential Noise Contributors ML20056B5011990-08-22022 August 1990 Responds to Violation Noted in Insp Repts 50-413/90-17 & 50-414/90-17.Corrective Actions:Review Will Be Conducted to Determine Category of Infrequently Run Procedures Needing Addl Verification Controls ML16259A2391990-08-22022 August 1990 Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo ML20056B4971990-08-20020 August 1990 Clarifies Info Submitted in 871207 & s Re Steam Generator Tube Rupture Analysis Demonstration Runs. Demonstration Runs Met plant-specific Requirements in Section D to NRC SER on WCAP-10698 ML20059C1201990-08-20020 August 1990 Forwards Rept Summarizing Util Findings Re Three False Negative Blind Performance Urine Drug Screens Which Occurred During Jan & Feb 1990.Recommends That NRC Consider Generic Communication to Clearly State Reporting Requirement ML20059B6581990-08-17017 August 1990 Responds to Violation Noted in Insp Repts 50-413/90-15 & 50-414/90-15.Corrective Actions:Present Methods of Testing Operability of CO2 Fire Protection Sys Will Be Evaluated by 910201 to Determine If Addl Testing Necessary ML20059C1591990-08-17017 August 1990 Suppls by Providing Addl Info to Support Util Position Re Anl Confirmatory Analysis of Main Steamline Breaks in Ice Condenser Plants.Encl Withheld ML20063Q0951990-08-15015 August 1990 Forwards Monthly Operating Rept for Jul 1990 for Catawba Nuclear Station Units 1 & 2 & Revised Rept for June 1990 ML20059C1231990-08-15015 August 1990 Advises That Util Submitting Special Rept Re Valid Failure of Diesel Generator 2B Would Be Delayed Until 880229 Had Incorrect Ltr Date.Date of Ltr Should Have Been 880204 Instead of 880104.Corrected Ltr Encl ML20063Q2671990-08-14014 August 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8 & Rev 35 to CMIP-9.W/DH Grimsley 900821 Release Memo ML20059C2211990-08-13013 August 1990 Forwards Revised Chapter 16, Selected Licensee Commitments Manual, to Plant Updated Fsar,Per 10CFR50.4 & 50.71.Manual Contains Commitments Which Require Control But Not Appropriate in Tech Specs ML20063Q0261990-08-10010 August 1990 Forwards Rev 0 to Catawba Unit 2 Cycle 4 Core Operating Limits Rept, Per Tech Spec 6.9.1.9 ML20063Q0671990-08-10010 August 1990 Submits Revised Response to Violations Noted in Insp Rept 50-413/90-09.Procedure to Verify Test Inputs Modified to Verify Dummy Input Signal to Channel RTD Circuit ML20058N0181990-08-0808 August 1990 Forwards Response to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20081E1601990-08-0101 August 1990 Advises of Completion of 900330 Commitment Re Standing Work Request for Insp of Air Flow Monitors & Dampers,Per Violations Noted in Insp Rept 50-413/90-03 & 50-414/90-03 ML20058P3261990-08-0101 August 1990 Forwards Public Version of Rev 26 to Station Directive 3.8.4, Onsite Emergency Organization ML20081E0951990-07-27027 July 1990 Forwards Decommissioning Financial Assurance Certification Rept for Duke Power Co,co-owner of Catawba Nuclear Station Units 1 & 2 ML20055H9741990-07-26026 July 1990 Forwards end-of-cycle 3 Steam Generator Insp Rept.Nineteen Tubes Removed from Svc by Plugging W/Rolled Mechanical Plug ML20055H5231990-07-24024 July 1990 Discusses co-licensee Relationship & Obligations Re Decommissioning Financial Assurance for Facilities ML20055H4571990-07-19019 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-413/90-11 & 50-414/90-11.Corrective actions:I-beams/ Hoists Rolled to Ends of Ice Condenser & Securely Located on Rails to Prevent Any Movement ML20055H1741990-07-18018 July 1990 Withdraws 880527 & 0725 Amends Clarifying Requirements for Containment Pressure Control Sys ML20055J3441990-07-17017 July 1990 Advises That Commitment Re Procedure IP/O/A/3190/01,per Violation in Insp Repts 50-413/90-06 & 50-414/90-06, Completed on 900619 ML20055H4131990-07-16016 July 1990 Forwards Public Version of Epips,Including RP/0/A/5000/07 & HP/0/B/1009/04 ML20055F8991990-07-13013 July 1990 Forwards Monthly Repts for June 1990 for Catawba Nuclear Station Units 1 & 2 & Operating Status Rept for May 1990 ML20055G2311990-07-13013 July 1990 Withdraws 880311 Proposed Amend to Tech Spec Table 3.3-3, Item 8.f Re Number of Instrumentation Channels Associated W/ Main Feedwater Pumps.Util Determined That Change Unnecessary ML20055F8461990-07-12012 July 1990 Requests 14-day Extension Until 900802 to Submit LER 414/90-010 to Investigate Power Supply Realignment ML20058P1231990-07-0707 July 1990 Advises That Commitment to Revise Maint Mgt Procedure 1.12 to Include Functional Verification Requirements & to Develop Retest Manual to Address Retest Requirements for Any Maint Performed on Components Completed on 900614 ML20055F4131990-07-0505 July 1990 Forwards Inservice Insp Rept Unit 1 Catawba 1990 Refueling Outage 4, Per 10CFR50.55(a)(q) & Tech Spec 4.0.5.Insp Performed Per Section XI of ASME Boiler & Pressure Vessel Code & Applicable Addenda ML20055D4291990-06-29029 June 1990 Supplemental Response to Violations Noted in Insp Repts 50-413/89-13 & 50-414/89-13,per .Personnel Responsible for Maintaining Crisis Mgt Ctr Drawing Trained. Util Will Continue to Evaluate Changes Made to Program ML20055E2191990-06-29029 June 1990 Submits Revised Commitment Dates Re Implementation of Dept Guidance on post-maint Testing,Per Commitment Made in 891002 Response to Violations in Insp Repts 50-413/89-19 & 50-414/89-19.Completion Date Changed to 900701 ML20044B0621990-06-26026 June 1990 Forwards Public Version of Revised EPIP HP/0/B/1009/05, Personnel/Vehicle Monitoring for Emergency Conditions. W/Dh Grimsley 900716 Release Memo ML20043H6921990-06-18018 June 1990 Advises of Revised Completion Date for VA Ductwork Cleaning to 901231,per Insp Repts 50-413/90-03 & 50-414/90-03. Vendor Personnel Assigned to Task Unavailable to Complete Cleaning Until Late 1990 Due to Outage Support Needs ML20043G1691990-06-15015 June 1990 Forwards Monthly Operating Repts for May 1990 for Catawba Nuclear Station,Units 1 & 2 & Corrected Monthly Operating Repts for Apr 1990 Re Personnel Exposure ML20055C8041990-06-15015 June 1990 Responds to NRC Re Violations Noted in Insp Repts 50-413/90-10 & 50-414/90-10.Corrective Actions:Instrument Root Valves Unisolated & Analog Channel Operational Tests for Low Temp Overpressure Protection Completed ML20043G4331990-06-13013 June 1990 Withdraws 900423 Proposed Amend to Tech Spec 4.6.1.8 Re Lab Test of Carbon Samples from Annulus Ventilation Sys ML20043G3771990-06-13013 June 1990 Withdraws 900423 Proposed Amend to Tech Spec 4.7.7 Which Required That Lab Test of Carbon Samples from Auxiliary Bldg Filtered Exhaust Sys Be Tested for Methyl Iodide Penetration of 0.71% ML20043G2511990-06-12012 June 1990 Withdraws 900419 Suppl to 871221 Application for Amends to Licenses NPF-35 & NPF-32 Re Tech Specs 4.7.6 Re Control Room Area Ventilation Surveillance Requirements ML20043G1741990-06-0707 June 1990 Responds to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire. Correct RCS Operating Pressure Would Be 2,250 Psia as Identified in Table 3-1 ML20043G3451990-06-0707 June 1990 Forwards Proprietary Response to Request for Addl Info Re Topical Rept BAW-10174, Mark-BW Reload Safety Analysis for Catawba & Mcguire. Response Withheld ML20043G0721990-06-0707 June 1990 Responds to NRC 900510 Ltr Re Violations Noted in Insp Repts 50-413/90-09 & 50-414/90-09.Corrective Actions:Vc/Yc Train a Returned to Svc W/Supply Power from 2ETA.Terminal Box 1TB0X0346 Inspected & Insured Operable ML20043F6111990-06-0606 June 1990 Advises That Response to Request for Addl Info Re Operator Response Times During Simulated Steam Generator Tube Rupture at Facility,Will Be Delayed Until 900630 1990-09-05
[Table view] |
Text
-_ - *
. DUKE POWEn GOMPANY <
l'.O. IM)X 33180 CliAHLUTTE, N.C. 28242 II AI. II. T1*CKER TELEPflONE via a ,arassen (704) 3?J~4S!Il
.u ,.. .. um. September 14, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuc1 car Regulatory Commission Washington, D. C. 20553 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414
Dear Mr. Denton:
On July 29, 1982, Duke Power Company transmitted comments on the Fire Protectiot.
preliminary draft SER. Included as Table 1 was a list of rooms and the type of fire detector provided. A number of errors were noted in this table. Attached is a corrected copy.
Very truly yours, f B.f A /fs Hal B. Tucker ROS/php Attachment cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. P. K. Van Doorn hTC Resident Inspector Catawba Nuclear Station Q Mr. Robert Guild, Esq.
Attorney-at-Law 314 Pall Mall Columbia, South Carolina 29201 8209210037 820914 PDR ADOCK 05000413 E PDR
Mr. Harold R. Denton, Director September 14, 1982 Page 2 cc: Palmetto Alliance 2135 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 Mr. Henry A. Presler, Chairman Charlotte-Mecklenburg Environmental Coalition 943 Henley Place Cnarlotte, North Carolina 28207 i
Table 1 Room Number Description Detection ELEVATION 522 100 Refueling Water Recirculating Pump; I - R/R Component Cooling Drain Sump & Sump Pumps 101 Corridor I - R/R-102 Containment Spray Pump 1A I - R/R 103 Containment Spray Pump 1B I - R/R 104 Residual Heat Removal Pump 1B I - R/R 105 Residual Heat Removal Pump 1A ~ I - R/R 106 Corridor I - R/R 107 Containment Spray Pump 2A I - R/R 108 Containment Spray Pump 2B I - R/R 109 Residual Heat Removal Pump 2B I - R/R 110 Residual Heat Removal Pump 2A I - R/R-
.111 Corridor I - R/R 112- Corridor I - R/R 113 Pipe Chase -
ELEVATION 543 200 Area Between Column Lines 56 & 58 I - R/R 200A Stairwell North of East Elevator -
200B Area in Front of East Elevatorf -
200C Groundwater Drainage Sump & Pumps -
200D Stairwell Adjacent to Room 248 -
201 Area South of Valve Gallery 202 -
202 Valve Gallery -
203 Waste GaF Decay Tanks -
204 Hydrogen Recombiner Control Panel Area -
- (Corridor) 204A Exhaust Fan Concrete Pad -
204B Waste Gas Analysis Rack "A" -
205 Waste Gas Hydrogen Recombiner "A" -
205A Gas Analysis Rack
~
206A Waste Gas Hydrogen Recombiner "B" -
206B Waste Gas Compressor Package "B" -
207 Waste Gas Compressor Package "A" -
208 Corridor I - R/R 209 Corridor I - R/R 209A Stairwell -
210 Corridor Adjacent to Recycle Evap. -
l Feed Pump l
210A Recycle Evap. Feed Pump "A" & "B" -
210B Valve Callery -
l 211 Recycle Evap. Package -
212 Corridor I - R/R 212A Stairwell -
212B Exhaust Fan Concrete Pad -
\
l
Room Number Description Detection 213 Gas Decay Tank Drain Pump -
214 Chemical Drain Tank, Floor Drain Sump, -
Waste Evap. Feed Sump 215 Access Corridor -
215A Waste Drain Tank Pumps -
215B Waste Evap. Feed Tank Pumps -
215C Waste Drain Tank -
215D Waste Evap. Feed Tank -
216 Waste Evaporator Package -
217 Mechanical Penetration Area - Unit 1 I - R/R 220 Mixing & Settling Tank Pumps -
221 Mixing & Settling Tank -
222 Spent Resin Valve Body Room -
222A Spent Resin Stora8e Tank B -
222B Spent Resin Storage Tank A -
223 Spent Resin Sluicing Pump & Valve -
Body Area 224 Laundry & Hot Shower Tank Pump -
225 Laundry & Hot Shower Tank / Floor Drain Tank -
226 Floor Drain Tank Pump -
227 Mechanical Penetration Area - Unit 2 I - R/R 230 Centrifugal Charging Pump 1A I - R/R 231 Centrifugal Charging Pump 1B I - R/R 232 Corridor I - R/R 233 Reciprocal Charging Pump - Unit 1 I - R/R 234 Safety Injection Pump 1B I - R/R 235 Safety Injection Pump 1A I - R/R 236 Hatch Area I - R/R 237 Restricted Instrument Shop I - R/R 238 Sample Panel Area - Unit 1 I - R/R 239 Cable Shaft Access Area I - R/R 240 Centrifugal Cherging Pump 2A I - R/R 241 Centrifugal Charging Pump 2B I - R/R 242 Corridor I - R/R 243 Reciprocal Charging Pump - Unit 2 I - R/R 244 Safety Injection Pump 2B I - R/R 245 Safety Injection Pump 2A I - R/R 246 Hatch Area I - R/R 247 Restricted Instrument Shop I - R/R 248 Sample Room - Unit 2 I - R/R 250 Vent Condensate Drain Tank - Unit 1 I - R/R 250A Stairwell -
251 Aux. Feedwater Pump Turbine Panel I - R/R 252 Train A Shutdown Panel I - R/R 253 Train B Shutdown Panel I - R/R 254 Turbine Driven Aux. Feedwater Pump - 1A Photoelectric 255 Motor Driven Aux. Feedwater Pump - IB I - R/R 256 Motor Driven Aux. Feedwater Pump - 1A I - R/R 260 Vent Condensate Drain Tank - Unit 2 I - R/R 260A Stairwell -
261 Aux. Feedwater Pump Turbine Panel I - R/R 262 Train A Shutdown Panel I - R/R Room Number Description Detection 263 Train B Shutdown Panel I - R/R 264 Turbine Driven Aux. Feedwater Pump - 2A Photoelectric 265 Motor Driven Aux. Feedwater Pump - 2B I - R/R 266 Motor Driven Aux. Feedwater Pump - 2A I - R/R ELEVATION 560 300 Equipment Area I - R/R 390A Stairs -
300B Elevator Lobby -
300C Duct Shaft -
300D Duct Shaft -
301 Boric Acid Transfer Pumps - Unit 2 -
302 Boric Acid Transfer Pumps - Unit 1 -
303 Corridor (Boric Acid Batching Tank) I - R/R 303A Stairs -
303B Duct Shaft -
304 Valve Gallery I - R/R 305 Boric Acid Tank "A" -
306 Valve Gallery I - R/R 307 Boric Acid Tank "B" -
308 Corridor I - R/R 303A Boron lajection Tank & Pumps - Unit 2 I - R/R 309 Volume Control Tank - Unit 2 -
310 Corridor I - R/R 310A Stairs -
310B Duct Shaft -
311 Pipe Trench & Hall -
312 Pipe Trench & Hall -
313 Valve Gallery I - R/R 314 Recycle Holdup Tank "A" -
315 Valve Gallery I - R/R 316 Recycle Holdup Tank "B" -
317 Valve Gallery -
318 Corridor I - R/R 318A Boron Injection Tank & Pumps - Unit 1 I - R/R 319 Volume Control Tank - Unit 1 -
320 Motor Control Center I - R/R 321 Seal Water Heat Exchanger - Unit 2 -
322 Cable Tray Access - Unit 2 I - R/R 322A Stairs -
323 Pipe Chase I - R/R 323A Pipe Chase -
323B Pipe Chase I - R/R 324 Boronometer - Unit 2 -
330 Motor Control Center I - R/R
- 331 Seal Water Heat Exchanger - Unit 1 -
332 Boronometer - Unit 1 -
333 Pipe Chase I - R/R 333A Pipe Chase -
l 333B Pipe Chase I - R/R 4
Room Number Description Detection 334 Cable Tray Access - Unit 1 I - R/R 340 Battery Room - Unit 2 I-340A Cable Shaft -
340B Cable Shaft -
341 Vital Battery 2EBA I - R/R 342 Vital Battery 2 EBB I - R/R 342A Battery Charger 2ECB I-343 Vital Battery 2EBC I - R/R 344 Vital Battery 2EBD I - R/R 345 Aux. Cont. Pwr. Batt. 2CBB I - R/R 346 Aux. Cont. Pwr. Batt. 2CBA I - R/R 350 Battery Room - Unit 1 I-350A Cable Shaft -
350B Duct Shaft -
351 Vital Battery 1EBA I - R/R 252 Vital Battery 1 EBB I - R/R 352A Battery Charger 1ECB I-353 Vital Battery 1EBC I - R/R 354 Vital Battery 1EBD I - R/R 355 Aux. Cont. Pwr. Batt. ICBB I - R/R 356 Aux. Cont. Pwr. Batt. ICBA I - R/R 360 Electrical Penetration Room - Unit 2 I-360A Stairs -
362 Switchgear Room I-363 Switchgear HVAC Equipment Room I-370 Electrical Penetration Room - Unit 1 I-370A Stairs -
372 Switchgear Room I-373 Switchgear HVAC Equipment Room I-ELEVATION 577 400 Equipment Area I - R/R 400A Stairs -
400B Stairs -
400C Duct Shaft -
400D Duct Shaft -
400E Stairs -
400F Duct Shaft -
400G Duct Shaft -
401 Glycol Mixing & Storage Tank; I - R/R Elevator Lobby 401A Stairs -
402 Corridor I - R/R 403 Container & Drum Storage I - R/R 404 Access to Rooms -
404A Dewatering Pump I - R/R 404B Radwaste Feed Skid I - R/R 404C Evaporator Concentrate Holdup Tank I - R/R 405 Filter Bunkers I - R/R 407 Corridor I - R/R l
Rev. I
l 1
Room Number Description Detection 408 Fue! Pool Cooling Demineralizer I - R/R 409 Fuel Fool Cooling; Skimmer Pumps; Heat I - R/R Exchangers 410 Recycle Evaporator Feed Demin (Hatch) -
411 Recycle Evaporator Condensate Demin. -
(Hatch) 412 Recycle Evaporator Condensate Filter -
(Double Hatch) 413 Boric Acid Filters (2 Adjacent hatches) -
414 Recycle Evaporator Feed Demin (Hatch) -
415 Recycle Evaporator Concentrate Filter -
(Hatch) 416A Recycle Evaporator Feed Filter -
(Double Hatch) 416B Recycle Evaporator Feed Filter -
(Double Hatch) 417 Fuel Pool Cooling Demineralizer I - R/R 418 Fuel Pool Cooling Pumps & Heat Exchanger I - R/R 419 Mechanical Penetration Room I - R/R 420 Fuel Pool Cooling Post Filters and Pre- -
Filters and Fuel Pool Skimmer Filter (6 Hatches) 421 Thermal Regenerative Demineralizer 2B -
(Hatch) 422 Thermal Regenerative Demineralizer 2C -
(Hatch) 423 Cation Bed Demineralizer 2A (Hatch) -
424 Waste Monitor Tank Demineralizer (Hatch) -
425 Containment Spray & Residual Heat Removal I - R/R Heat Exchangers - 2A 426 Containment Spray & Residual Heat Removal I - R/R Heat Exchangers - 2B 427 Mechanical Penetration Room I - R/R 428 Laundry / Hot Shower Carbon Filter -
430 Fuel Pool Skimmer Filter & Waste Evaporator -
Condensate Filter (3 Hatches) 431 Thermal Regenerative Demineralizer - IE -
(Hatch) 432 Thermal Regenerative Demineralizer - IC -
(Hatch) 433 Cation Bed Demineralizer IA (Hatch) -
434 Containment Spray & Residual Heat Removal I - R/R Heat Exchangers - 1A 435 Containment Spray & Residual Heat Removal I - R/R Heat Exchangers - IB 441 Floor Drain Tank Filter -
442 Laundry & Hot Shower Filter (Primary and -
Secondary) 443 Thermal Regenerative Demineralizer - 2A -
(Hatch) 444 Thermal Regenerative Demineralizer - 2D -
445 Mixed Bed Demineralizer (Hatch) -
I l
1 Room Number Description Detection 446 Reactor Coolant Filter - 2B (Hatch) -
447 Seal Water Return Filter (Hatch) -
448 Thermal Regenerative Demineralizer - 2E -
(Hatch) 449 Mixed Bed Demineralizer - 2A (Hatch) -
450 Fuel Pool Cooling Filters - Unit 1 -
(5 Hatches) 451 Seal Water Return Filter - Unit 1 -
(2 Hatches) 452 Thermal Regenerative Demineralizer - 1D -
(Hatch) 453 Thermal Regenerative Demineralizer - IB -
(Hatch) 454 Mixed Bed Demineralizer - IB (Hatch) -
455 Reactor Coolant Filter - IB (2 Hatches) -
456 Reactor Coolant Filter - 1A (2 Hatches) -
457 Waste Evaporator Condensate Demineralizer -
(1 Hatch) 458 Thermal Regenerative Demineralizer 1A -
(1 Hatch) 459 Mixed Bed Demineralizer IA -
460 Reactor Coolant Filter 2A -
461 Waste Monitor Tank Filter -
462 Seal Water Injection Filter 2B -
463 Seal Water Injection Filter 2A -
464 Spent Resin Sluice Filter -
465 Letdown Reheat Heat Exchanger - Unit 2 I - R/R 466 Letdown Chiller Heat Excharger - Unit 2 I - R/R 467 Letdown Heat Exchanger 'Jnit 2 I - R/R l 468 Moderating Heat Exchanger - Unit 2 I - R/R l 469 Motor Control Center I - R/R 470 Seal Water Injection Filter 1A -
471 Seal Water Injection Filter IB -
472 Waste Evaporator Feed Filter B -
l 473 Waste Evaporator Feed Filter A -
474 Letdown Heat, Exchanger - Unit 1 I - R/R l
475 Chiller Heat Exchanger - Unit 1 1 - R/R 476 Letdown Heat Exchanger - Unit 1 I - R/R 477 Moderating Heat Exchanger - Unit 1 I - R/R 478 Motor Control Center I - R/R 480 Corridor (East of #2 Cable Room 481) I - R/R 480A Cable Shaft Room I - R/R
! 481 Cable Room I - R/R 481A Electrical Boards I - R/R 482 Duct Shaft (East of #2 Corridor & Cable -
l Room) 483 Corridor -
484 Electrical Penetration Room - Unit 2 I-484A Stairs - Entry to Electrical Penetration -
Room 485 Switchgear Equipment Room I-486 Load Center - Unit 2 I-Rev. I
{
Room Number Description Detection 490 Corridor I - R/R 490A Cable Shaft I - R/R 491 Cable Room - Unit 1 I - R/R 491A Electrical Boards Room - Unit 1 I - R/R 492 Duct Shaft (Adjacent to #1 Corridor) -
493 Corridor Unit 1 -
494 Electrical Penetration Room - Unit 1 I-494A Stairs & Access to Electrical Penetration -
Room 495 Switchgear Equipment Room - Unit 1 I-496 Load Center - Unit 1 I-ELEVATION 594 500 Central Area - Auxiliary Building I - R/R 500A NE Stairwell -
500B NW Stairwell -
500C SE Stairwell -
500D SW Stairwell -
510 Counting Room -
511 Environmental Room I - R/R 512 H. P. Respiratory I - R/R 530 New Fuel Storage Area, Unit 1 UV 531 New Fuel Receiving Area, Unit 1 UV 540 New Fuel Storage, Unit 2 UV 541 New Fuel Receiving, Unit 2 UV 550 Manway to Spent Resin Batching Tank I - R/R 551 Instrument Calibration -
551A Corridor -
560 Equipment Area (Vent.) I-561 Corridor / Hatch Area -
561A Stairwell -
561B Stairwel, -
562 Unit 2 Penetration Area (Steam Doghouse) -
563 Electrical Penetration, Unit 2 I-564 RMC Room I-570 Equipment Area (Vent.) I-571 Corridor -
571A Stairwell -
572 Unit 1 Steam Penetration (Doghouse) -
573 Control Room I - R/R 574 Operators Room I-575 Interface Office I-576 Electrical Penetration Room, Unit 1 I-580 N, Accum. Tank Blowoff, Unit 2 -
580A Stairwell -
581 Steam Penetration, Unit 2 (Outside -
Doghouse) 590 N, Accum. Tank Blowoff, Unit 1 -
590A Stairwell -
i- 591 Steam Penetration, Unit 1 (Outside -
! Doughouse) i Rev. 1 4
. - , . , _ . . . _ _ - , .p, , ,._y__e. ,,,._,-y_,- _ ... - , .... , - _.__ _ - , _ _ . . . . - - , , _ , . . _ , - . . . _ , _ _ . .
Room Number Description Detection ELEVATION 609 600 Fuel Pool Operating Floor, Unit 1 I - R/R 600A Duct Room -
601 Reactor Personnel Lock Area -
601A Reactor Personnel Area I - R/R 602 Decontamination Storage, Unit 1 I - R/R 614 Fuel Pool Operating Floor - Unit 2 I - R/R 614A Duct Room -
615 Reactor Personnel Lock Area #2 -
615A Reactor Personnel Area I - R/R 616 Decontamination Storage, Unit 2 I - R/R ELEVATION 611 750 Purge Supply Room - Unit 1 -
751 Purge Supply Room - Unit 2 -
ELEVATION 623 + 10 Fuel Pool Purge Unit (Unit 1)
~
801 -
802 Fuel Pool Purge Unit (Unit 2) -
Room Number Description Detection DIESEL GENERATOR BUILDING 302 Diesel Generator 1A - R/R 302C Diesel Generator 1A Sequencer Panels I - R/R 304 Diesel Generator IB - R/R 304C. Diesel Generator IB Sequencer Panels I - R/R 306 Diesel Generator 2A - R/R 306C Diesel Generator 2A Sequencer Panels I - R/R 308 Diesel Generator 2B - R/R 308C Diesel Generator 2B Sequencer Panels I - R/R NUCLEAR SERVICE WATER PJMP STRUCTURE 662 NSWP 1A & 2A I - R/R 663 NSWP IB & 2B I - R/R REACTOR BUILDING Annulus - Unit 1 I-Annulus - Unit 2 I-Pipe Corridor - Unit 1 I-Pipe Corridor - Unit 2 I-Safety Related Cable Trays - Unit 1 I-Safety Related Cable Trays - Unit 2 I-RCP 1A, IB, IC, ID Heat Sensitive Cab.
RCP 2A, 2B, 2C, 2D Heat Sensitive Cab.
Lower Containment Filters IA, 1B I - R/R Lower Containment Filters 2A, 2B I - R/R l
I 1
1 Rev. 1 i
. - . -