o u;.: v o. : e August 1, 1990 Document Control Desk U.S. Nucletr Regulatory Commission Washing'.on, D.C. 20555 Re: Cat v;ba Nuclear Station Doc;3t Nos. 50-413 and 50-414 Emergency Plan Implementing Procedures
Dear Sir:
Please find enclosed for NRC Staff use and review the following Emergency Plan Implementing Procedures:
Station Directive 3.8.4 Rev. 26 (07/23/90)
This revision is being submitted in accordance with 10 CFR 50.54(q) and does not decrease the effectiveness of the Emergency Plan Implementing Procedures or the' Emergency Plan.
Please delete privacy material in the form of peraonal telephone numbers prior to placing in the Public Document Room.
By copy of this letter, two copies of the above document are being provided to the NRC, Region II.
Very truly yours g
t 3n_
v.
Hal B. Tucker HAF/haf i
Attachment
- g883883! #d43 L
del e
,g l
0001.10 p
=
2 s
~
+
Page 2 of 2 DUKE POWER COMPANY CATAWBA NUCLEAR STATION EMERGENCY PIAN IMPLEMENTING PROCEDURES INDEX i
PROCEDURE W TITLE HP/0/B/1009/06 Alternative Method for Determining Dose Rate Within the Reactor Building (01/12/87)
HP/0/B/1009/07 In-plant Particulate and Iodine Monitoring Under Accident Conditions (04/14/89)
HP/0/B/1009/08 Contamination Control During Transportation of Contaminated Injured Individuals (01/31/90)
HP/0/B/1009/09 Guidelir.es for Accident and Emergency Response (02/01/90)
HP/0/B/1009/12 Quantifying Gaseous Releases through Steam Relief Valves Under Post-Accident _ Conditions (02/15/85)
HP/0/B/1009/14 Health Physics Actions Following an Uncontrolled Release of Liquid Radioactive Material (02/04/85)'
HP/0/B/1009/16 Distribution of Potassium Iodide Tablet in the Event i
of a Radioiodine Release (10/19/87)
HP/0/B/1009/17 Port Accident Containment hi.- C spling System (08/29/89)
HP/0/B/1009/18 Offsite Dose Projections (03/30/90) l HP/0/B/1009/19 Emergency Radio System Operations, Maintenance and i
Contunications (01/31/90)
OP/0/A/6200/21 Operating Procedure for Sampling at the Post Accident Liquid-Sample Panel (04/30/90)
CNS Directive 3.7.5 Response to Bomb Threat (04/27/87)
CNS Directive 3.8.4 Onsite Emergency Organization (07/23/90)
CNS Directive 2.0.1 News Release / Rumor Control (02/15/88)
CNS Directive 3.0.7 Site Assembly / Evacuation (09/14/89)
July 24, 1990
((
' UNITED sT ATES NUCLE AR RECULATORY COMMISSION duYst13II9YO
,\\
50-413/414 Catawba 1
MEMORANDUM FOR:
Chief, Document Control Branch, IRM FROM:
Director, Division of Freedom of Infomation and Publications Services, ADM
SUBJECT:
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Freedom of Information and Publications Services has reviewed the attached document and has determined that it may now be made publicly.
available.-
how-8 kmds, -
Donnie H. Grimsley, Director Division of Freedom of Infomation and Publications Services Office of Administration