ML20055F413
| ML20055F413 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/05/1990 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20055F414 | List: |
| References | |
| NUDOCS 9007160394 | |
| Download: ML20055F413 (1) | |
Text
'
Duke her Company k'!^
'lin R h en 8
n<ePresident PO Box 33199 y
Charlotte, N C 28242 Nuclear Production (704)373 4 51)
DUKE POWER July 5, 1990 U..S Nuclear Regulatory Commission ATTN Document Control Deek Washington, D.C.
20555
Subject:
- Catawba Nuclear Station, Unit 1 Docket'No. 50-413 End of Cycle 4 Inservice Inspection Report Gentlemen Pursuant to 10 CFR 50.55 (a) (q) and Catawba Nucinar Station Technical Specification. 4.0.5, please find attached the Catawba Unit 1 end of Cycle 4 Inservice Inspection Report. The Catawba Unit 1 end of Cycle 4 refueling outage was completed on April 26, 1990.
This Inservice Inspection was performed in accordance with Section XI of the ASME Boiler and Pressure i
Vessel Code and applicable addenda.
Very truly yours, h
f c,g 2 v Ital B. Tucker
- MHil/47/lcs Attachment (Without) xc:
Mr. S. D. Ebneter. Regional Administretc/e U. S. Nuclear Regulatory _ Commission Region II 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 Mr. W.'T.
Orders NRC Resident Inspector Catawba Nuclear Station 9007160394 9007o5 gDR -ADOCK 05000413
[hWL[
- v i