ML20043F611
| ML20043F611 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 06/06/1990 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9006150148 | |
| Download: ML20043F611 (1) | |
Text
ll I
. gue her compey guy 7,
c
- "nwa v~~
f5NEII$[""
DUKE POWER June 6, 1990 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C.
20555
Subject:
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Steam Generator Tube Rupture Your April 20, 1990 letter transmitted a request for additional information regarding operator response times during a simulated Steam Generator Tube Rupture (SGTR) at Catawba Nuclear Station.
Specifically, you requested response times for the reccvery actions identified in Table 2.3-1 of the Westinghouse Owner's Group WCAP-10698, SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill, for all the Catawba operators.
1 Be advised that my response will be delayed until June 30, 1990. Additional j
time is required to properly evaluate your request for information.
I l
apologize for the slight delay.
i.
Very truly yours, I
\\s.?>.T%
H. B. Tucker JGT/7/0EL xc: Mr. S. D. Ebneter Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 l
Mr. W. T. Orders NRC Resident Inspector Catawba Nuclear Station Dr. K. N. Jabbour Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 14H25 Washington, D. C. 20555 l
9006150148 900606 PDR ADOCK 05000413 1
\\0v P
PDC i