ML20195B475

From kanterella
Jump to navigation Jump to search

Forwards Rev 7 to UFSAR Chapter 2 & Chapter 3 from 1998 UFSAR for Catawba Nuclear Station.List of Instructions on Insertion Encl
ML20195B475
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/24/1999
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20195B482 List:
References
TAC-M99322, TAC-M99323, NUDOCS 9906010038
Download: ML20195B475 (3)


Text

'

Duke Energy Corporation Catawba Nuclear Station 4800 Concord Road Yctk, SC 29745 Gary R. Petenon (803) 831-425I amct (go3) g3y.3435 px Via1%id '

May 24, 1999 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Duke Energy Corporation Catawba Nuclear Station Docket No. 50-413 and 50-414 1998 UFSAR Update TAC Nos. M99322 and M99323 Pursuant to 10CFR 50.71(e), please find enclosed the original and ten copies of the text portion of UFSAR Chapter 2 and Chapter 3 from the 1998 Updated Final Safety Analysis Report (UFSAR) for Catawba Nuclear Station. The previous revision (UFSAR Revision 6) of these two Chapters was mistakenly transmitted in our April 8, 1998 transmittal of the 1998 UFSAR Update (UFSAR Revision 7). Please update your copies per the attached list of instructions.

The effective date of the changes provided by this submittal is October 24, 1998.

I certify that I am a duly authorized officer of Duke Energy Corporation, and that the information contained herein accurately represents changes made to the Catawba Nuclear Station UFSAR since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements.

If there are any questions concerning this submittal, please contact J.W. n at (803) 831-3051.

/

s -

pn_gg ~~

G. R. Peterson Attachments -

f s

(

9906010038 990524 ,( g\

PDR ADOCK 05000413 t g PDR .

l U.S. Nuclear Regulatory Commission Document Control Desk May 24, 1999 Page 2 xc: L. A. Reyes, Regional, Administrator USNRC, Region II P.S. Tam, Project Manager USNRC, ONRR D. J. Roberts Senior Resident Inspector (CNS)

L. ..

i Duke Power Catawba Nuden Station

" ' " ' 2 5 Yor (803) 831-3000 i

s.

May'24, 1999

Subject:

Catawba Nuclear Station 1998 Updated Final Safety Analysis Report Distribution Code CADM-01 The October 1998 Catawba Updated Final Safety Analysis Report was distributed on April 8, 1999. It has been discovered that the previous revision of the text portion of Chapter 2 " Site Characteristics" and Chapter 3 " Design O Criteria" was mistakenly transmitted instead of the current revision. Manual holders should update their manual as indicated by the attachment.

Any questions concerning this update may be directed to John Glenn at (803) 831-3051, ohn Glenn Catawba Regulatory Compliance Attachment i

V i

l l

l s.