ML20055H413

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Epips,Including RP/0/A/5000/07 & HP/0/B/1009/04
ML20055H413
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/16/1990
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20055H414 List:
References
NUDOCS 9007260173
Download: ML20055H413 (4)


Text

..$tAhs i

c a p'. fi-Le,-

PO flat 31198

. g., y,,g,,,

Charlotte, N C NH2 y.p.g, p,,,y.

(7%)3?] 1211 '

k

- DUKE POWER '-

.Julyc16, 1990.

Document Control Desk i

U.S. Nuclear Regulatory Commission Washington, D.C.'20555 Re: Catawba. Nuclear Station

'l 9

Docket'Nas. 50-4 D and 50-414 Emerger,cy Pfan Implementing Procedures c

DearSIr:

Please fisd' enclosed for.NRC Staff use and review the following Emergency Pun Implementing Procedures:

~RP/0/A/5000/0i --

Natural Disaster and Earthquake HP/0/B/1009/04 -

Environmental Monitoring For Emergency Conditions Within The Ten Mile-Radius of Catawba Nuclear Station t

H l

Due to an' administrative error, this-is being sent late.

Hope this l

!=

'I 0

-does not inconvenience you'.

This revision is being submitted in accordance with 10 CFR' 50.54(q) and'does not decrease the effectiveness of the Emergency Plan Implementing Procedures or the Emergency Plan.

Please delete privacy material in the form of personal l

telephone numbers prior to placing in the Public Document Room.

l-By copy of-this. letter, two copies of the above document are j

being provided to the NRC, Region 11.

Very truly yours, A

W Hal B. Tucker l

6 HAF/haf Attachment 0 F y 72 73 900716 a

F OK 03000423

, I PDC n

1

. l1 3L

~

7 i

p 7.-

y 4

)

CATAWBA NUCLEAR STATION l

IN/0VT OF STATION DOCUME!(T TRANSt!ITTAL

.l DATE: MAY-24, 1990-

)

CONTROL NO.

[h daftY OC

'1 TD:

/

DOCUtd)tT(S):

EMERGENCY PLAN IMPLEMENTING PROCEDtlRES - CATAWRA REMOVE INDEX PAGES 1 & 2 DATED MAY 7. 1990.

'1 IN' SERT INDCX PAGES 1 & 2 DATED MAY 23. 1990.

1 i

REMOVE OLD PROCEDURE AND INSERT NEW.

DATE-APPROVED

-l

[

PROCEDURE #

RP/0/A/5000/07 5/23/90-HP/,0/8/1009/04 5/10/90 In Station - Please sign Distribution Index Log when picking up i

this document.

Out of Station - Please sign and return this transmittel within within thirty (30) working days indicating you have received the j

attached to: Catawba Nuclear Station, Master File, Document Control l

Out of Station - Inforeation Only Copy. This copy cannot be used l'

to perform any work. These revisions cannot be used for developing programs or p;ocedures. Revisions will continue to be issued; however, do not sign this form and return it.

Received by:

Date:

1'

\\

r

-. x -..-

7,E

+

ls

(

.4

.Page-1 of 2' i

DUKE POWER COMPANY.

CATAWBA NUCLEAR STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES-INDEX PROCEDURE #-

TITLE RP/0/A/5000/01 Classification of Emergency-(03/06/90)-

RP/0/A/5000/02 Notification of Unusual Event-(11/02/89)

RP/0/A/5000/03 Alert (11/02/69)

RP/0/A/5000/04 Site. Area Emergency (11/02/89)

RP/0/A/5000/05 General Emergency (11/02/89)-

RP/0/A/5000/06 Follow-up Notification (09/01/89)

RP/0/A/5000/07 Natural Disaster and Earthquake (05/23/90)'

i

/RP/0/A/5000/08 Release of A Hazardous Substance (03/03/89)

l RP/0/A/5000/09 Collision / Explosion-(07/30/87)

-RP/0/A/5000/10' Conducting A Site' Assembly or Evacuation (07/15/88) l RP/0/A/500b/11-Protective Action Reconsnendations-Without The OAC-(10/19/88) m'

'RP/0/B/5000/12 Control of Assessnont and Repair Teams (01/06/88)

RP/0/B/$000/13.

NRC Notification Requirements (05/19/89)

[

s >.

RP/0/B/5000/14 Follow-up Notifications From TSC (09/01/89) j HP/0/B/1000/06 Emergency Equipment Functional Check and.

Inventory (04/23/90) l s

HP/0/B/1009/01 Health Physics. Recovery Plan (08/18/87) i HP/0/B/1009/03 Health Physics Response Following a Primary to Secondary Leak (05/11/89)

HP/0/B/1009/04 Environmental Monitoring for Emergency Conditions Within the Terdtile Radius of Catawba Nuclear

'l Stetion (05/10/90)

HP/0/B/1009/05 Personnel / Vehicle Monitoring for Emergency conditions (01/12/87)

May 23, 1990

L'

, LP,,,,

+1, _

1_

Page 2 of 2 DUKE POWER COMPANY CATAWBA NUCLEAR STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES-INDEX PROCEDURE #

TITLE 1

- HP/0/B/1009/06 Alternative Method for Determining Dose Rate Within the Reactor Building (01/12/87)

HP/0/B/1009/07 In-plant Particulate and Iodine Monitoring Under Accident Conditions (04/14/89)

HP/0/B/1009/08 Contamination Control During Transportation of Contaminated Injured Individuals (01/31/90) l HP/0/B/1009/09:

. Guidelines for Accident and Emergency Response 1

(02/01/90) 1m HP/0/B/1009/12 Quantifying Gaseous Releases through Steam Relief Valves Under Post-Accident Conditions (02/15/85)

HP/0/B/1009/14 Health Physics Actions Following an Uncontrolled Release of Liquid Radioactive Material (02/04/85)

HP/0/B/1009/16 Distribution of Potassium Iodide Tablet in the Event of a Radiolodine Release (10/19/87)-

HP/0/B/1009/17 Post Accident. Containment Air Sampling. System 1

(08/29/89) 1 HP/0/B/1009/18 Offsite Dose Projections (03/30/90)

HP/0/B/1009/19 Emerg.ncy Radio System operations, Maintenance and Communications (01/31/90)

OP/0/A/6200/21 Operating Procedure for Sampling at the Post Accident Liquid Sample Panel (04/30/90)

CNS Directive 3.7.5 Response to Bomb Threat (04/287)

CNS Directive 3.8.4 Onsite Emergency Organization (04/23/90)

CNS Directive 2.0.1 News Release / Rumor Control (02/15/88)

CNS Directive 3.0.7 Site Assembly / Evacuation (09/14/89)

May 23, 1990 4

~A

-