ML20206N820

From kanterella
Jump to navigation Jump to search
Forwards Revs 15 & 16 to Catawba Unit 1 Cycle 12 COLR, Per TS 5.6.5.Rev 15 Updates Limits for New Catawba 1 Cycle 12 Reload Core & Rev 16 Revises Values Re Min Boron Concentrations for Rwst,Cla & SFP
ML20206N820
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 05/10/1999
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206N823 List:
References
NUDOCS 9905180081
Download: ML20206N820 (2)


Text

'h Duk) Energy C:rpor .ti::n Catawba Nudear Station L,/ b g , 4800 Concord Road York, SC 29745 Gary R. Peterson (803) 831-4251 omcr Via kident (803) 831-3426 ux May 10, 1999 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555

Subject:

Duke Energy Corporation Catawba Nuclear Station Unit 1 Docket No.: 50-413 Core Operating Limits Report (COLR)

Attached, pursuant to Catawba Technical Specification 5.6.5, is an information copy of a revision to the Core Operating Limits Report for Catawba Unit 1 Cycle 12. Revision 15 to tbs Unie 1 COLR is being made to update the limits for the new Catawba 1 Cycle 12 reload core. Along with the power distribution surveillance data (Appendix A) which changes each cycle, this revision also includes changes associated with minimum boron concentrations for the Refueling Water Storage Tank (RWST), Cold Leg Accumulators CLA), and the Spent Fuel Pool (SFP). Revision 16 to the ClCl2 COLR is also attached and revises these values.

Please direct any questions or concerns to Martha Purser at (803) 831-4015.

Sin e ely,  !

f0tf

. . Peterson I Attachment ti . 0.2 l

l l

9905180081 990510 4 PDR ADOCK 05000413 P PDR

U. S. Nuclear Regulatory Commission May 10,1999 Page 2 xc w/att: L. A. Reyes, Regional, Administrator USNRC, Region II P. S. Tam, Project Manager USNRC, ONRR D. J. Roberts Senior Resident Inspector (CNS)

I c ,