ML20043H692
| ML20043H692 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 06/18/1990 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9006260304 | |
| Download: ML20043H692 (2) | |
Text
g l
-s
- s-Duke her Conwary HatB Lan PO Box 33198 the Hessdernt Char!vtte, N C 28242 Nuclear Production (TM)173 4531 DUKE POWER June 18, 1990 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D. C.
20555
Subject:
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 NRC Inspection Report Nos. 50-413 and 50-414/90-03 Revision to Comtsitment Date Gentlemen:
In my March 30. 1990 response to Violation 414/90-03-01 concerning failure to take prompt and timely corrective action for the inoperable 2ABFX System, I committed to complete the cleaning of all remaining VA ductwork, susceptible of having lint from dryers, by July 1,1990.
Vendor personnel assigned this task will be needed to support the current U2EC3 outage and will be unavailable to complete VA ductwork cleaning until late 1990.
Based on these outage support needs, I have revised the completion date for VA ductwork cleaning to December 31, 1990.
b-i y
Hal B. Tucker WRC140/cs i
j.gf>2ggpje_iefiShas a
/ \\
q i
j*
a U. S. Nuclear Regulatory Commission June 18, 1990 Page Two xc:
Mr. Stewart D. Ebneter Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 Mr. W. T. Orders NRC Resident Inspector Catawba Nuclear Station i
6 q