ML19350C815

From kanterella
Revision as of 03:56, 18 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Schedule for Completion of Remaining Seismic Reviews & Submittal of Seismic Qualification Review Team Info Sheets & Seismic Repts
ML19350C815
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/02/1981
From: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8104060747
Download: ML19350C815 (3)


Text

, s.

SOUTH CAROLINA ELECTRIC a GAS COMPANY cas,o,m c .e. v..

COLume:p, S3utM CAROLINA 29218 T. C. Niewot s, J n.

v.c ...... ... o.. o c April 2, 1981

= = .e n...

Mr. Harold R. Denton, Director Office of Nucicar Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Seismic Qualification Review Team (SQRT)

. Follow-Up Information

Dear Mr. Denton:

In followup to our March 6, 1981 letter, South Carolina Electric and Gas Company provides forty-five (45) copies of a schedule of when the remaining seismic reviews will be completed and when the SQRT Information Sheets and the

- Seismic Reports will be submitted. Recognizing the tight schedule on some of the items, SCE&G will try to improve their completion dates.

If you have any questions, please let us know.

Very truly yours, s

T. C. Nichals, Jr. ..

/h j.I' i RBC:TCN:rh s 'b fj Enclosures s ,[.,f /

cc: V. C. Summer w/o enc 1. D' UQ f 3

l. G. H. Fischer v/o enc 1. A- C T. C. Nichols, Jr. w/o enc 1.

p "'gPR0.3798; p,j

'C. A. Price Q,, % asmug D. A. Nauman y  %

W. A. Will10ms, Jr.

R. B.-Clary -

?-

A. R. Koon N A. A. Smith J. B. Knotts,.Jr.

J.-L. Skolds H. N. Cyrus

0. S. Bradham B.-A..Bursey

~ISEG PRS NPCF File i

stenoeoyy

. s -

EQUIPMENT SLTfARY SHEET Schedule for Seismic Schedule for SQRT Equipment Iten Review Completion Forn Submittal

1. -Fire Dampers 4/30/81 Submitted 1
2. Limit Switches for HVAC 4/30/81 Sub=itted
3. Beck Electric Motor Actuators for Dampers 4/30/81 Sub=itted l 4
4. Roof Ventilators 4/30/81 Submitted
5. Bettis Damper Actuators Co=pleted Sub=itted
6. ASCO Solenoid Valves for Reactor-

.. Building Cooling Unit Completed Sub=itted

7. Filter Plenums 6/15/81 6/22/81
8. Solenoid Valves and Limit Switches for .

-l Posi-Seal Purge Isolation Valves Completed Submitted

9. Solenoid Vavles for Air Handling Units completed Submittted
10. Namco Limit Switches on Anchor Darling Valves Completed- Submitted

.11. Solenoid Valve Panel for M.S.

Isolation Valve 4/30/81 Submitted

12. Terry Turbine for E W Pump' 4/30/81 Submitted  ;

1

13. Limit Swtiches for Roewell Valves Completed Submitted
14. 1" EPG Ball Valve Actuator Completed Submitted .
15. . Sodium Hydroxide Tank. Completed Subnitted
16. Fuel Oil Storage Tank Completed Submitted )
17. Radiation Monitor Panel' 6/15/81 6/22/81
18. Local' Control Panels Completed. Submitted

/19.-- Hydrogen Analyzer Panel 6/15/81- 6/22/81

- 20.. Reactor' Trip Switchgear- Completed Submitted - l 21.- PAM Indicators 8/1/81 8/1/8'. )

22., Core Subcooling-Monitor 8/1/01 8/1/81 23.: Critical Systems Leak. Monitoring '8/1/81 8/1/81

\

s 4 ,

y, .

SEISMIC REPORTS STILL DUE TO THE hTC Equipment Item 5 hedule for Submittal

1. PAM Indicators 8/1/81

- 2..- -

Hydrogen Analyzer Panel 6/22/81

3. Radiation Monitor Panel 6/22/81
4. Accummulator. Tanks (W) will be available to meet with NRC to provide 7

seismic report during week of 4/20/81, or later if necessary e