Forwards Schedule for Completion of Remaining Seismic Reviews & Submittal of Seismic Qualification Review Team Info Sheets & Seismic Repts
ML19350C815
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/02/1981
From: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8104060747
Download: ML19350C815 (3)


Text

,

s.

SOUTH CAROLINA ELECTRIC a GAS COMPANY cas,o,m c.e. v..

COLume:p, S3utM CAROLINA 29218 T. C. Niewot s, J n.

April 2, 1981 v.c

......... o.. o c

= =.e n...

Mr. Harold R. Denton, Director Office of Nucicar Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Seismic Qualification Review Team (SQRT)

Follow-Up Information

Dear Mr. Denton:

In followup to our March 6, 1981 letter, South Carolina Electric and Gas Company provides forty-five (45) copies of a schedule of when the remaining seismic reviews will be completed and when the SQRT Information Sheets and the

- Seismic Reports will be submitted. Recognizing the tight schedule on some of the items, SCE&G will try to improve their completion dates.

If you have any questions, please let us know.

Very truly yours, s

T. C. Nichals, Jr.

/h.I' j

i

'b RBC:TCN:rh s

fj

,[.,f /

Enclosures s

cc:

V. C. Summer w/o enc 1.

D' UQ f 3

l.

G. H. Fischer v/o enc 1.

A-C p "'gPR0.3798;, j p

T. C. Nichols, Jr. w/o enc 1.

Q,, %

asmug

'C.

A. Price D. A. Nauman y

W. A. Will10ms, Jr.

R. B.-Clary

?-

A. R. Koon N

A. A. Smith J. B. Knotts,.Jr.

J.-L. Skolds H. N. Cyrus

0. S. Bradham B.-A..Bursey

~ISEG PRS NPCF File i

stenoeoyy

s EQUIPMENT SLTfARY SHEET Schedule for Seismic Schedule for SQRT Equipment Iten Review Completion Forn Submittal

1. -Fire Dampers 4/30/81 Submitted 1

2.

Limit Switches for HVAC 4/30/81 Sub=itted 3.

Beck Electric Motor Actuators for Dampers 4/30/81 Sub=itted 4.

Roof Ventilators 4/30/81 Submitted 4

5.

Bettis Damper Actuators Co=pleted Sub=itted 6.

ASCO Solenoid Valves for Reactor-

.. Building Cooling Unit Completed Sub=itted 7.

Filter Plenums 6/15/81 6/22/81 8.

Solenoid Valves and Limit Switches for Posi-Seal Purge Isolation Valves Completed Submitted 9.

Solenoid Vavles for Air Handling Units completed Submittted

10. Namco Limit Switches on Anchor Darling Valves Completed-Submitted

.11.

Solenoid Valve Panel for M.S.

Isolation Valve 4/30/81 Submitted

12. Terry Turbine for E W Pump' 4/30/81 Submitted
13. Limit Swtiches for Roewell Valves Completed Submitted 14.

1" EPG Ball Valve Actuator Completed Submitted

15.. Sodium Hydroxide Tank.

Completed Subnitted 16.

Fuel Oil Storage Tank Completed Submitted

17. Radiation Monitor Panel' 6/15/81 6/22/81 18.

Local' Control Panels Completed.

Submitted

/19.-- Hydrogen Analyzer Panel 6/15/81-6/22/81

- 20..

Reactor' Trip Switchgear-Completed Submitted -

21.- PAM Indicators 8/1/81 8/1/8'.

22., Core Subcooling-Monitor 8/1/01 8/1/81 23.: Critical Systems Leak. Monitoring

'8/1/81 8/1/81

\\

4 s

y, SEISMIC REPORTS STILL DUE TO THE hTC Equipment Item 5 hedule for Submittal 1.

PAM Indicators 8/1/81

- 2..- Hydrogen Analyzer Panel 6/22/81 3.

Radiation Monitor Panel 6/22/81 (W) will be available to 4.

Accummulator. Tanks meet with NRC to provide seismic report during 7

week of 4/20/81, or later if necessary e

_ j e-b 2

)

f a

a f!

t

, +.

r

~

e t

s k-e, I-4 4

'-1 6

i