SOUTH CAROLINA ELECTRIC a GAS COMPANY cas,o,m c.e. v..
COLume:p, S3utM CAROLINA 29218 T. C. Niewot s, J n.
April 2, 1981 v.c
......... o.. o c
= =.e n...
Mr. Harold R. Denton, Director Office of Nucicar Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Subject:
Virgil C. Summer Nuclear Station Docket No. 50/395 Seismic Qualification Review Team (SQRT)
Follow-Up Information
Dear Mr. Denton:
In followup to our March 6, 1981 letter, South Carolina Electric and Gas Company provides forty-five (45) copies of a schedule of when the remaining seismic reviews will be completed and when the SQRT Information Sheets and the
- Seismic Reports will be submitted. Recognizing the tight schedule on some of the items, SCE&G will try to improve their completion dates.
If you have any questions, please let us know.
Very truly yours, s
T. C. Nichals, Jr.
/h.I' j
i
'b RBC:TCN:rh s
fj
,[.,f /
Enclosures s
cc:
V. C. Summer w/o enc 1.
D' UQ f 3
l.
G. H. Fischer v/o enc 1.
A-C p "'gPR0.3798;, j p
T. C. Nichols, Jr. w/o enc 1.
Q,, %
asmug
'C.
A. Price D. A. Nauman y
W. A. Will10ms, Jr.
R. B.-Clary
?-
A. R. Koon N
A. A. Smith J. B. Knotts,.Jr.
J.-L. Skolds H. N. Cyrus
- 0. S. Bradham B.-A..Bursey
~ISEG PRS NPCF File i
stenoeoyy
s EQUIPMENT SLTfARY SHEET Schedule for Seismic Schedule for SQRT Equipment Iten Review Completion Forn Submittal
- 1. -Fire Dampers 4/30/81 Submitted 1
2.
Limit Switches for HVAC 4/30/81 Sub=itted 3.
Beck Electric Motor Actuators for Dampers 4/30/81 Sub=itted 4.
Roof Ventilators 4/30/81 Submitted 4
5.
Bettis Damper Actuators Co=pleted Sub=itted 6.
ASCO Solenoid Valves for Reactor-
.. Building Cooling Unit Completed Sub=itted 7.
Filter Plenums 6/15/81 6/22/81 8.
Solenoid Valves and Limit Switches for Posi-Seal Purge Isolation Valves Completed Submitted 9.
Solenoid Vavles for Air Handling Units completed Submittted
- 10. Namco Limit Switches on Anchor Darling Valves Completed-Submitted
.11.
Solenoid Valve Panel for M.S.
Isolation Valve 4/30/81 Submitted
- 12. Terry Turbine for E W Pump' 4/30/81 Submitted
- 13. Limit Swtiches for Roewell Valves Completed Submitted 14.
1" EPG Ball Valve Actuator Completed Submitted
- 15.. Sodium Hydroxide Tank.
Completed Subnitted 16.
Fuel Oil Storage Tank Completed Submitted
- 17. Radiation Monitor Panel' 6/15/81 6/22/81 18.
Local' Control Panels Completed.
Submitted
/19.-- Hydrogen Analyzer Panel 6/15/81-6/22/81
- 20..
Reactor' Trip Switchgear-Completed Submitted -
21.- PAM Indicators 8/1/81 8/1/8'.
22., Core Subcooling-Monitor 8/1/01 8/1/81 23.: Critical Systems Leak. Monitoring
'8/1/81 8/1/81
\\
4 s
y, SEISMIC REPORTS STILL DUE TO THE hTC Equipment Item 5 hedule for Submittal 1.
PAM Indicators 8/1/81
- 2..- Hydrogen Analyzer Panel 6/22/81 3.
Radiation Monitor Panel 6/22/81 (W) will be available to 4.
Accummulator. Tanks meet with NRC to provide seismic report during 7
week of 4/20/81, or later if necessary e
_ j e-b 2
)