Responds to Violations Noted in Insp Rept 50-458/89-40. Corrective Actions:All Prestaged Matl Removed from Containment & Radiation Protection Personnel Cautioned on Placement of Matl on 95-ft Elevation of Containment
ML20011E843
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/09/1990
From: Deddens J
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBG-32285, NUDOCS 9002220576
Download: ML20011E843 (4)


Text

,

i

> GULF STATES UTILITIES COMPANY

- Ryt R t (ND 51 ATION , -PO$T OFFICf flOX 220 $f FRANC $yllLE. LOU $iANA 70775 ARE A CODE M4 - 635 f.0M 346 6661 i

February 9, 1990 RBG- 32285 File Nos. G9.5, G15.4.1 U.S._ Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

River Bend Station - Unit 1 Refer to : Region IV

, Docket No. 50-458/89-40 Pursuant to 10CFR2.201, this letter provides Gulf States -

Utilities Company's 'GSU) response to the Notice of Violation _for NRC Inspection Report No. 50-458/89-40. The inspection was conducted by Messrs. E. J. Ford and W. B. Jones during the period November 1-30, 1989, of activities authorized by NRC Operating License NPF-47 for River Bend Station - Unit 1. GSU's response to the violation is provided in the enclosure.

Should- have any cuestions, please contact Mr. L. A. England at'(504)you381-4145.

Si cerel ,

    • 7 J. C. Deddens Senior Vice President River Bend Nuclear Group JCD/TFP/d10/

Y

/PDG/DNL/JWC/ F/RGW/pg s4 Enclosure

~

cc: U. S. Nuclear Regulatory Commission Region IV.

611 Ryan Plaza Drive, Suite 1000 Arlington, TX - 76011 Senior Resident Inspector Post Office Box 1051

'St. Francisville, LA 70775 8!

'9002220576 900209 f DR ADOCK0500gg8

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION STATE OF LOUISIANA )

PARISH OF WEST FELICIANA )

Docket No. 50-458 In the Matter of )

GULF STATES UTILITIES COMPANY )

(River Bend Station - Unit 1) 4

,._ AFFIDAVIT J. C. Deddens, being duly sworn, states that he is a j Senior Vice President of Gulf States Utilities Company; that  !

he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the documents attached l 1

hereto; and that all such documents are true and correct to ^

the best of his knowledge, information and belief.

i

// ?h**?

J. CV Deddens Subscribed and sworn to before me, a Notary Public-in and for the State and Parish above named, this 9 44~ day of 3 drut uu _, 1990 . My Commission expires with Life, d

H 0 00 U(loc d Claudia F. Hurst kloraf l Notary Public in and for West Feliciana' Parish, Louisiana 1

--. . _ _ _ _ _ _ _ _ _ _l

.c ' *

.. . RESPONSE TO NOTICE OF VIOLATION 50-458/8940-01 LEVEL IV REFERENCE Notice of Violation - Letter from S. J. Collins to J. C. Deddens, dated January 10, 1990.

FAILURE TO PROVIDE ADEQUATE CONTROL FOR MATERIAL ACCESS TO THE CONTAINMENT The Code of Federal Regulations, in 10CFR50.59, allows a licensee to make changes to a facility as described in the safety analysis report provided -

the changes do not increase the probability of a malfunction of equipment important to safety.

Contrary to the above, on November 30, 1989, with the reactor at 97 percent thermal power, the licensee made a change to the facility by placing materials in the containment which increased the probability of a malfunction of emergency core cooling systems during an accident in that the material could obstruct the flow path of those emergency systems that use the suppression pool as a source of cooling water for the reactor.

-These materials included several hundred square feet of plastic sheeting, computer terminals and tables located on a walkway directly over the suppression pool.

-REASON FOR THE VIOLATION On November 30, 1989, the Director - Radiological Programs initiated Condition Report (CR) 89-1242. This CR identifies a condition where materials were pre-staged on the 95' elevation of the containment in preparation for an outage without approval of the shift supervisor. The root cause of this event is considered to be a lack of coordination between the shift supervisor and the radiation protection personnel responsible for placing this material inside the containment.

CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED Upon discovery, all pre-staged material was removed from the containment.

On December l'1, 1989, the Director-Radiological Programs issued a memorandum to all radiation protection personnel reminding them to notify the shift supervisor of the quantity and location of material being moved into the containment. Additionally, all Radiation Protection personnel were cautioned on the placement of material on the 95' elevation of the containment.

Page 1 of 2

C < j CORRECTIVE, STEPS WHICH WILL BE TAKEN TO PREVENT FURTHER VIOLATIONS

-A sign will be posted inside the containment at the entrances to the 95' elevation stating: ,

WITH THE PLANT- IN MODES 1 OR 2, MATERIALS BEING USED ON THE 95' ELEVATION SHALL NOT BE LEFT UNATTENDED UNLESS PROPERLY ANALYZED.

.An additional sign will be posted at the airlock ^ entrances reminding personnel that any irretrievable item (s) dropped into the suppression pool i shall be. identified on a condition report in accordance with Administrative -

Procedure (ADM)-019.

DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED All signs will be posted by February 15, 1990.