ML19329F919

From kanterella
Revision as of 20:03, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Steam Generator Water Hammer Demonstration Test, Per Tech Spec 8.1
ML19329F919
Person / Time
Site: North Anna Dominion icon.png
Issue date: 07/09/1980
From: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Youngblood R
Office of Nuclear Reactor Regulation
Shared Package
ML19329F920 List:
References
607, NUDOCS 8007110364
Download: ML19329F919 (6)


Text

VINGINIA ELECTHIC AND Powna COMPANY Hrcuwoxn,VrmoxxzA 20261 July 9. 1980 Mr. Harold R. Denton, Director S; rial No. 607 Office of Nuclear Reactor Regulation LQA/WRM:rab Attn: Mr. B. Joe Youngblood, Chief Licensing Granch No. 1 Docket No. 50-339 Division of Licensing U. S. Nuclear Regulatory Commission License No. NPF-7 Washington, D.C. 20555

Dear Mr. Denton:

WATER HAMMER DEMONSTRATION TEST SAFETY ANALYSIS AND TECHNICAL ~ SPECIFICATION EXEMPTION REQUESTS NORTH ANNA UNIT NO. 2 Enclosed (Enclosure 1) is the procedure for cunducting the secondary flow stability tests as required by Technical Specification 8.1. Also enclosed (Enclosure 2) is the safety analysis and dis-cussion of the required exemptions to Technical Specifications for conducting the stability tests.

1 Pursuant to 10 CFR 50.90, we request an amendment to license NPF-7 which would permit the performance of the special test program by temporarily exempting certain-Technical Specifications. Included in Enclosure 2 is a list of the specifications which will require exemptions and the reasons these specifications must be exempted. This enclosure also provides the basis for continued operation during the test.

The enclosed safety analysis, request for Technical Specifi-cation exemptions, and test procedure have been reviewed and approved by the Station Nuclear Safety and Operating Committee and the System Nuclear Safety and Operating Committee.

The request has been evaluated in accordance with the criteria in 10 CFR 170.22.. It has been determined that this request involves a single safety issue; therefore, a Class III license amendment fee is

, required. Accordingly, a voucher check in the amount of $4,000.00 is

- enclosed in payment of the required fee.

In accordance with Technical Specification 8.1, we are sub-mitting this test program for your review. We are ready to perform this test and would appreciate your prompt review and approval of this request.

8007110 f

- Vinotwa Etscresc AMD POWER COMPANY TO - Mr. Harold R. Denton 2-As required by Specification 8.1, once your approval of the enclosed program is received, we will provide 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification prior to conducting the' test.- i Very truly yours, J. H. Ferguson Executive Vice President-Power Attachments:

1. Special Test, 2-ST-22, Water Hammer Demonstration Test
2. Spacial Test Evaluation
3. Voucher Check No.26556 for $4,000.00 ec: Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II 1

e m

COMMONWEALTH OF VIRGINIA )

) s. s.

CITY OF RICHMOND )

Before me, a Notary Public, in and for the City and Common-wealth aforesaid, today personally appeared J. H. Ferguson, who being duly sworn, made oath and said (1) that he is Executive Vice President-Power of the Virginia Electric and Power Company, (2) that he is duly authorized to execute and file the foregoing Amendment in behalf of that Company, and (3) that the statements in the Amendment are true to the best of his knowledge and belief.

Given under my hand and notarial seal this '71A day of Js)v ,L22-My Commission expires J,n w,,r gv y /> > </ M )

Wf &$}Y Ns Notary Public~

+

(SEAL)

e i ,

1 l

ADM-40.0 i Attachment A '

SAFER RELATED n';'s;'  ;

1 2 _ST- 22 VIRGIN!A EIICTRIC AND P07.R CGt1 PANT Date: 06-24-ev Page 1 of 2

SPECIAL TEST PROCEDUPI FCR NORTH ANNA PCWER STATION UNIT # 2 TITII: STE.Uf CCERATOR WATER HJM!ER DEMONSTRATION TEST Preoared Ev: C. A. KAN'* Date: 06-01-80 ,

Engineering Recon: mended Acoroval: gs m Date: 06-01-80 l

STATION NCCI.7.AR SAFETY MD OP"J'lTING CCS.IT~EE REVIEW 0F ?ROCEDCF2:

Unreviewed Safety Cuestien: OTes ENo l

Di.:,sitten: $Appr:ved ODisappre7ed O Approved as Modified

~

Cc~ .iman's Signature:

.- A

- u _Ma

-j ._ ,

.Oftd!__-

Date: 06-?t n i

S i

SYSTEM NCC:. EAR SAFT.TY AND OPERAT!NG COMMI. a . REVII'J OF PROCEDCRE :

NOTE: Review not required unless an unre*.-iewed saf ety question is involved as deter =ined above.

Disectition: CApproved C~tsapproved O Approved as Modified

. Q.jr. nan's Signature: Date:

I.l

'D' 3 .r.2: aAT!ON OF NRC APPROVAL:

O App:=ved O No: Requi:ee 4

Station Manazer's Si2 nature: Date:

  • E2T REST.~TS FIVIET"., E? ENGINEERING: Date:

TEST RFSUI.TS ?lvIE*.ED BY STATION NUCIIAR SATITY, AND OPEFJ. TING COSD1ITTEE:

Chai man's Signature: Date:

Coc:e.e n t s :

e- A . - -

og ' t

/

e eo k

J. '-- ~ __

,4 e

E M

% W i 11' 6

I 4

I l

1 h

l I

J

,n-- , , , - - - - - . -

r e ,,, + ,-m- --- - - ----- --- - ,,, .-

u 4 n. -.. - w ,- -,~~ - -

E k e

sui g:.eUl.,

i. s,Use aces. :icna! ages as eeced) ;49,. ., ..

)IE03E?A?3CIII (LIS* Oy nt.Sc e r) ; l l' O 1

e 1

REIOL'JTION OF 315;?E?Miclis (Lis 29 31fe,7 : 7.,3 c,=;,, 3 , ey,), j il !

I l

1 1

I il i I

. 31 1.U e_ .

k T

l I

l i

1 l

d i

I.

- _ , - . , . , . - ---_m - , r e - ,