ML19330C640

From kanterella
Revision as of 18:00, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Bechtel Power Corp Detailed Procedure for Test Program to Evaluate Welds of Anchor Rods & Studs to Embedded Plates. Requests Comment by 800725.Forwarding Ltr Encl
ML19330C640
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 07/17/1980
From: Schnell D
UNION ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19330C641 List:
References
ULNRC-365, NUDOCS 8008110116
Download: ML19330C640 (2)


Text

(

i -

U N IO N EtccTnic COMPANY 19 01 GRATIOT STRE ET - ST, touts l

t July 17, 1980 =ag'g(^; tac $5 ST lou e $ MO. eb 3 e 6 Mr. James G. Keppler, Director Region III Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 ULNRC-365

Dear Mr. Keppler:

PROCEDURE TRANSMITTAL TESTING OF ANCHOR RODS AND EMBEDS CALLAWAY PLANT UNITS 1 AND 2 We are transmitting herewith one copy of Bechtel's transmittal letter BLUE-710, dated July 16, 1980, Testing Program for Embedded Plates, Callaway Jobsite, with its enclosure, subject as above.

Please review this procedure and furnish us your comments by July 25, 1980.

Our present schedule for testing the embeds and anchor rods is as follows:

Lab Tests - Tension & bend tests on anchor rods -

week of August 4, 1980.

Field Test - Testing of installed machine-welded embeds - week of August 11, 1980.

Issue Final Report - October 1, 1980 If possible, these dates will be expedited. We will inform you of any revisions to the schedule.

By copy of this letter, we are transmitting a copy of this material directly to Mr. E. Gallagher.

Very truly yours, f

Donald F. Schnell Manager - Nuclear Engineering WHZ/sla cc: Mr. E. Gallagher w/a , , , , _ ,

AtVFoC

~h38-so U

Km JUL 211980 PWC souviNo Pnosteus TsaouGS INVENTiON & INNOVATION

~ ~

~8008110 iib

Bechtel Power Corporation

' Engineers-Constructors 15740 Shady Grove Road Gaithersburg, Maryland 20760 301- 258 3000 Mr. D. F. Schnell Manager - Nc. clear Engineering Jg } $ jggQ Union Electric Company Post Office Box 149 St. Louis, MO 63166 BLUE 1 b File: C-131 Bechtel Job No. 10884 SNUPPS Project Testing Program for Embedded Plates Callaway Jobsite Ref: 1. ULS 3282 dated June 19, 1980

2. BLUE 707 dated July 7, 1980 Enc 1: A. Revised Detailed Procedure for Test Program to Evaluate Welds of Anchor Rods and Studs to Embedded Plates

Dear Mr. Schnell:

We transmit herewith procedures for the test program per Reference 1 incorporating your consnents. Please coordinate this procedure with the NRC and obtain their approval so that the testing can begin in the first week of August.

Very ly ours, 4

. . ith f Project Engineering Manager EWT:bg cc: N. A. Petrick, w/l l

- .