ML20008E206

From kanterella
Revision as of 19:05, 28 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Deficiency Rept Re Installation of nonsafety-related Anchors in safety-related Bldg W/O Approved Procedures. Engineer Evaluation Determined That Installation Does Not Impair Bldg Safety.Item Is Not Reportable Under 10CFR50.55e
ML20008E206
Person / Time
Site: Marble Hill
Issue date: 10/17/1980
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8010240409
Download: ML20008E206 (2)


Text

O PUBLIC SERVICE INDIANA .

S. W. Shields Senior Vice Prescent .

Nuciear osv.sion October 17, 1980 Mr. James G. Keppler, Director Docket :Jos.: ST:1 50-546 U. S. !1uclear Regulatory Commission ST1 50-547 Region III Construction Permit !!os.:

799 Roosevelt Road CPPR - 170 Glen Ellyn, Illinois 60137 CPPR - 171 Marble Hill :!uclear Generating Station - Units 1 and 2 Dear Mr. Keppler On September 17, 1979, Mr. J. U. Bott of Public Service Company of Indiana, Inc., (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). During installation of temporary non-safety related pipe, concrete expansion anchors used for support of pipe hangers were placed in a safety related concrete structure (Auxiliary Building) without approved procedures.

PSI personnel have surveyed the anchor installations to determine what, if any, damage may have occured. The results of this survey (Attachment 1) were submitted to PSI's architect-engineer for evaluation.

The architect-engineer evaluated this information from a design standpoint and concluded that the installation of the subject concrete expansion anchors would not impair the safety of the structure involved.

To prevent recurrence of this problem in the future, PSI has sent letters to each site contractor indicating that no attachments are to be made to safety related structures without PSI approved procedures unless such attachments are shown on approved drawings.

As those anchor installations did not impair the safety of the structure involved, this item would not have affected adversely the safety of operatior.s of the plant and therefore is not reportable under 10 CFR 50.55(e).

\k b 9 'o l P.O. Box 190, New Washington, indiana 47162 812. 293. 4441 8010240 N 3

oi PUBUC SERVICE INDIANA Letter: James G Keppler .3.

~ October 17, 1999 If you have any questions on this matter please feel free to contact me.

Sincer,ely , ,

? - .

'/ h S. W. Shields TDG/cg cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 E. R. Schweibinz, p. g, J. J. Harrison

.