Interim Deficiency Rept Re Overstressed Condition in Letdown Cooler Supports.Forces & Moments Transmitted to Bechtel Portion of Letdown Cooler Support Clarified.Revised Bracket Design Available for Review by 810501.Final Rept by 810630
ML20008F663
Person / Time
Site: Midland
Issue date: 04/15/1981
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 11967, 80-01, 80-1, NUDOCS 8104210479
Download: ML20008F663 (2)


Text

,

C011SumBIS Power Company """

, Vice President - Project;. Engsneenng

.rnd Construction General Offices: 1945 West ParnaH Road, Jackson. MI 49201 * (517) 788 0453 60-01 #6 Apr.1 15, 1981 o SD 4

0

%j0%

Mr o G Keppler, Regional Director 2-Office of Iuspection and Enforcement US Iluelear Regulatory Cc==issiot Z -

hV V

D -

(9 4J Regico III y/q, / y 799 F msevelt Rc3d @g/

Glen Ellyn, IL tol37 4 Q j MA '

MIDLA'ID FRCJECT DOCIET IICS 50-329, 50-330 LEIOC'n7I COOLER SUFFORTS FILI.: 0.4.9 36 UFI: 73*10*01, 152h0(E), 02312(S) SERIAL: 11967 i

References:

CFCo letters to J G Keppler, Same

Subject:

1 l (1) Serial Ecve-6h-EO, dated March 27, 1980 (2) Serial 9180, dated June 19, 1980 (3) Serial 9769, dated Octcber 10,198e (h) Serial 1099h, dated recember 30, 1980 (5) Serial 11177, dated Januar/ 30, 1951 This letter, as were the referenced letters, is an interi: 50.55(e) report cencerning the overstressea conditic:. in the letdown eccler suppcrts.

echtel and E&W have clarified the forces and eccents transnitted to the 3echtel portion of the letdevn cooler support. Bechtel is now in the process of rede;igning their pcrtien of the support bracket . The revised bracket design is expected to be n.vailable for review and tencurrence by May 1,1981.

l It is also expected that approval of the revised design vill be available by yay 15, 1981.

Based en the above, a final report will be issued on er before June 30, 1961.

l a<< w bl. M l JLW/lr CC: Director of Office of Inspecticn & Enforcement Att Mr Victor Stelle, US:!RC (15)

Directcr, Office of Management Information & Program Control, US!!RC (1) l l

1 6104210479 5

a 2 80-01 #6 Serial 11967 EJCook, USIaC Resident Inspector Midland Nuclear Plant (1)

CBechhoefer, ASL3 GALinenberger, ASL3 FPCowan, ASL3 AS&L Appeal Fanel IO: Cherry, Esq MSinclair CRStephens, US:iRC WDPaten, Esq, US:iRC FJKelly, Esq, Attorney General SHFreeman, Esq, Asst Attorney General GTTaylor, Esq, Asst Attorney General

'a"r' Marshall GJMerritt , Esq, TI!K&J i

. -