Interim Deficiency Rept Re Control of Retroactive Design Changes.Initially Reported on 840518.Investigation Continuing.Next Rept Will Be Provided by 841130
ML20092K612
Person / Time
Site: Midland
Issue date: 06/15/1984
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
30324, 84-08-#1, 84-8-#1, OL, OM, NUDOCS 8406280461
Download: ML20092K612 (5)


Text

...

Consumers Power i

James W Cook h

f Vice President - Pmjects, Engineering and Construction General offices: 1945 West Parnali Road, Jackson, Mt 49201 * (517) 788 0453 June 15, 1984 84-08 #1 Mr. J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER PROJECT DOCKET NOS 50-329 AND 50-330 CONTROL OF RETROACTIVE DESIGN CHANGES FILE:

0.4.9.95 SERIAL:

30324 This letter is an interim 10CFR50.55(e) report on a potentially reportable-deficiency in the system for controlling retroactive design changes. This condition was reported by telecon to the NRC on May 18, 1984.

The attachment to this letter provides a description of the deficiency and the corrective actions being planned.

Another report, either interim or final, will be sent on or before November 30, 1984.

JWC/AHB/cd

Attachment:

1) MCAR-1, Report No 85, dated May 24, 1984.

CC: Document Control Desk, NRC Washington, DC BBurgess, NRC Resident Inspector.

Midland Nuclear Plant DSHood, US NRC Office of NRR INPO. Records Center 8406280461 840615 PDR ADOCK 05000329 8

PDR OC0684-0020A-MP01-

/

2 84-08 #1 Serial 30324 OM/0L SERVICE LIST Mr Frank J Kelley Atomic Safety & Licensing Attorney General of the Appeal Board State of Michigan U S Nuclear Regulatory Commission Ms Carole Steinberg Washington, DC 20555 Assistant Attorney General Environmental Protection Division Mr C R Stephens (3) 720 Law Building Chief, Docketing & Services Lansing, MI 48913 U S Nuclear Regulatory Commission Office of the Secretary Washington, DC 20555 Mr Myron M Cherry, Esq Suite 3700 Ms Mary Sinclair Three First National Plaza 5711 Summerset Street Chicago, IL 60602 Midland, MI 48640 Mr Wendell H Marshall Mr William D Paton, Esq RFD 10 Counsel for the NRC Staff Midland, MI 48640 U S Nuclear Regulatory Commission Washington, DC 20555 Mr Charles Bechhoefer, Esq Atomic Safety & Licensing Atomic Safety & Licensing Board Panel Board Panel U S Nuclear Regulatory Commission U S Nuclear Regulatory Commission East-West Towers, Room E-413 Washington, DC 20555 Bethesda, MD 20014 Ms Barbara Stamaris Dr Frederick P Cowan 5795 North River Road 6152 N Verde Trail Rt 3 Apt B-125 Freeland, MI 48623 Boca Raton, FL 33433 Dr Jerry Harbour Mr Fred C Williams Atomic Safety & Licensing Isham, Lincoln & Beale Board Panel 1120 Connecticut Ave, NW, Suite 840 U S Nuclear Regulatory Commission Washington, DC 20036 East-Wect Towers, Room E-454 Bethesda, MD 20014 Mr James E Brunner, Esq Consumers Power Company Mr M I Miller, Esq 212 West Michigan Avenue Isham, Lincoln & Beale Jackson, MI 49201 Three First National Plaza 52nd Floor Chicago, IL 60602 OC0684-0020A-MP01

1 3-3 84-08 #1 Serial 30324 Mr D F Judd Babcock & Wilcox PO Box 1260 John Demeester, Esq Lynchburg, VA 24505 Dow Chemical Building Michigan Division Mr Steve Gadler, Esq Midland MI 48640 2120 Carter Avenue St Paul, MN 55108 Ms Lynne Bernabei Government Accountability Project Mr P Robert Brown 1901 Q Street, NW Clark, Klein & Beaumont Washington, DC 20009 1600 First Federal Bldg Woodward Ave Detroit, MI 48226 3/14/84 x

a

[

g

=

Y "N_,

s\\

k<

~/*

OC0684-0020A-MP01

I5283I I5286i MCAR 85 Intsria R; port No. 1 8'

QUAUTY ASSURANCE PROGRAM MANAGEMENT CORRECTIVE ACTION REPORT Att chment 1 MCAR 1 REPORT NO. [ p al 303%

JOBNO. 7220 15iSII o uo.

o,1,

s,26,Rt l' DESCRIPTION (including.eferences):

As a result of a review of Midland project design change documents, it was determined that the method utilized on the project for cont olling retroactive design changes may not adequately ensure that associated hardware had the l

required design changes and inspections performed. This concern was addressed on Consumers Power Company (CPCo) Safety Concern and Reportability Evaluation (SCRE) 99 and CPCo Management Corrective Action Request / Report (MCAR/R) - TWI-1.

No nonconforming hardware or safety concern has been identified from t!'e reviews/

  • RECOMMENDED ACTION (Optional) inspections performed to date.
1) Evaluate and correct the specific condition (s)
2) Investigate for related and similar co'.ditions
3) Determine root cause and provide co.-.ective action to preclude recurrence
4) Issue first report by 6/8/84 REFERRED TO 3 ENGINEERING 5l CONSTRUCTION O QA MANAGEM NT 3 upnan O PROCUREMENT ISSUED BY
    • This condition was reported to the NRC by CPCo fv Protect OA Eng"ceer Date as potentially reportable on 5/18/84 11 REPORTABLE DEFICIENCY NOTIFIEDCU NT O NO D YES **

= = YlY N)

Protect M Oate '

lliCAUSE CORRECTIVE ACTION TAKEN AUTHORIZED BY Date STANDARD DISTRSUTON ADDITONAL DeSTRSUTON. AS APPROPRIATE DMSON OA MANAGER ENGINEERING MANAGER FORMAL REPORT TO CUENT MANAGER OF OA. SPC PROJECT ENGINEER (lf Sectionll ApplieB) 08

GPO. OA MANAGER OE SUPERVISOR PD OA MANAGER CONSTRUCTON MANAGER PROJECT MANAGER PROJ SUPT /PROJ CONSTR MANAGER CUENT CHIEF CONSTR OC ENQiNEER CORRECTIVE ACTION IMPLEMENTED DmSON PROCU0ENT MOR PROJ PROCUREMENT MGR PROCUREMENT SUPPUER OUAUTY MOR AND DfV SUPPUER QUAUTY MGR VERIFIED BY Protect OA Engeeer Date

'Doectae e acece provided and attach reference document.

AAPD-O t 61

NRC LICEISING CORZESPONDENCE - RECORD

SUMMARY

DATE: 6/15/84 DcCKET : USERS 50-329, 50-330 M!DLAND UNITS 1 & 2 S'aNARY :

(State why letter is written)

Interim 10CFR50 55(e) Report CC! NIT 5E'iTS MADE:

(LCP items vill be made for these items by Safety & Licensing; Site cocimitments vill be identified separately).

(1) Determine specific condition (2) Investigate scope and determine other affected areas (3) Determine root cause and take corrective action PRIV!OUS NRC/CPCC CCRRESPONDCICE SPECIAL DISTRIBUTION (References)

US Mail 6 None.

Federal Express O File /UFI !IO.

Te h py 6 0.h.9 95 To Whom:

22-Internal /32-External INDIVIDUALS PROVIDING UTFORMATION EIDr/IDUALS ASS! TIED RESPO?ISI$ILITY (Including Censultants)

FCR IMPLEME'ITING CCSNITME'ITS:

EBPocer/Bechtel Project Engineering EBPoter/Bechtel Project Engineering CONC'JFRE* ICES (normally name of LCPitem(s)orSERopenitem(s)this section or depart ent head gl,, name correspondence closes:

d of any site personnel who concurred)

None WRBird/MPQAD m.

CRIGUIAT0 h eparer b.

Attachments or Enclosurest ook Yes 8 How Many:

1 1

No Q

k

/

31 k/up a m