ML20008F663
| ML20008F663 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 04/15/1981 |
| From: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 11967, 80-01, 80-1, NUDOCS 8104210479 | |
| Download: ML20008F663 (2) | |
Text
,
C011SumBIS Power Company
, Vice President - Project;. Engsneenng
.rnd Construction General Offices: 1945 West ParnaH Road, Jackson. MI 49201 * (517) 788 0453 60-01 #6 Apr.1 15, 1981 o
SD 4
0
%j0%
Mr o G Keppler, Regional Director 2-Office of Iuspection and Enforcement Z hV D
y/q, /
4J US Iluelear Regulatory Cc==issiot (9
V Regico III y
@g/
799 F msevelt Rc3d Glen Ellyn, IL tol37 4
Q j MA '
MIDLA'ID FRCJECT DOCIET IICS 50-329, 50-330 LEIOC'n7I COOLER SUFFORTS FILI.:
0.4.9 36 UFI:
73*10*01, 152h0(E), 02312(S) SERIAL:
11967 i
References:
CFCo letters to J G Keppler, Same
Subject:
1 l
(1) Serial Ecve-6h-EO, dated March 27, 1980 (2) Serial 9180, dated June 19, 1980 (3) Serial 9769, dated Octcber 10,198e (h) Serial 1099h, dated recember 30, 1980 (5) Serial 11177, dated Januar/ 30, 1951 This letter, as were the referenced letters, is an interi: 50.55(e) report cencerning the overstressea conditic:. in the letdown eccler suppcrts.
- echtel and E&W have clarified the forces and eccents transnitted to the 3echtel portion of the letdevn cooler support. Bechtel is now in the process of rede;igning their pcrtien of the support bracket. The revised bracket design is expected to be n.vailable for review and tencurrence by May 1,1981.
l It is also expected that approval of the revised design vill be available by yay 15, 1981.
Based en the above, a final report will be issued on er before June 30, 1961.
l a<< w bl. M l
JLW/lr CC: Director of Office of Inspecticn & Enforcement Att Mr Victor Stelle, US:!RC (15)
Directcr, Office of Management Information & Program Control, US!!RC (1) l l
6104210479 5
1
a 2
80-01 #6 Serial 11967 EJCook, USIaC Resident Inspector Midland Nuclear Plant (1)
CBechhoefer, ASL3 GALinenberger, ASL3 FPCowan, ASL3 AS&L Appeal Fanel IO: Cherry, Esq MSinclair CRStephens, US:iRC WDPaten, Esq, US:iRC FJKelly, Esq, Attorney General SHFreeman, Esq, Asst Attorney General GTTaylor, Esq, Asst Attorney General
'a"r' Marshall GJMerritt, Esq, TI!K&J i
-