Forwards Revised Sections & Table of Contents Discussed in NRC 810610 Ltr for ETR-1001,Ebasco Nuclear QA Program Manual.Revisions,Which Are Dtd 810731 Will Be Included in Change 10 to ETR-1001
ML20009H273
Person / Time
Site: Harris, Waterford, Satsop, Allens Creek  Entergy icon.png
Issue date: 08/06/1981
From: Tenzer B
EBASCO SERVICES, INC.
To: Haass W
Office of Nuclear Reactor Regulation
Shared Package
ML20009H274 List:
References
NUDOCS 8108070133
Download: ML20009H273 (3)


Text

W

. o EBASCO SERVICES INCORPORATED EKO Two World Trade Center, New York, N.Y.10048 Benjamin E.Tenzer Vice President Matenats Engneenng and QuahtyAssurance g A

b f s Ild j Mr. Walter P Haass, Chief b Quality Assurance Branch

/IUG 0 G 198)w ,9 y,,,

E Division of Project Management coawrsso g U S Nuclear Regulatory Commission 4' #

Washington, D C 20555 s im $' .

Dear Mr. Haass:

This is to acknowledge receipt and thank you for your letter of June 10, 1981 accepting recently proposed revisions to Ebasco Topical Report No. ETR-1001, "Ebasco Nuclear Quality Assurance Program Manual," Sections QA-I-2, QA-I-5 and QA-II-9. The revisions, which are dated 7/31/81, are being included t.s Change 10 to the Topical Report.

In accordance with your request, thirty-six (36) copies of the revised sections are transmitted. These are in sets, with each set including updated Table of Contents, the Nuclear Regulatory Commission letter of acceptance of June 10, 1981, STATEMENT OF AUTHORITY, FOREWORD and Transmittal Memorandum. The follow-ing of our existing contracts will be covered by Change 10 to ETR-1001:

Carolina Power & Light Co. Shearon Harris Nuclear Station Units 1,2,3,&4.

Houston Lighting & Power Company Allens Creek Nuclear Power Station Unit #1.

Louisiana Power & Light Company Waterford Steam Electric Station Unit #3.

j Washington Public Power Supply System Nuclear Projects #3 and #5.

Very truly yours, f5r g B E Tenzer BET /lc Attachments cc: W Belke (with attachment)

C J Hale, NRC Region IV, O.I.&E (w/ attachment) l B R Mazo l

wnwa%

A

p-

. July 31, 1981 To:  !! alders of Ebasco Nuclear Quality Assurance Manual ETR-1001 From: P D Agashiwala ,/ F. A;puluwab

Subject:

EBASCO NUCLEAR QUALITY ASSURANCE MANUAL ETR-1001 DISTRIBUTION 10 Enclosed is the following material for insertion in your copy of the subject manual as indicated. Remove and destroy super-seded sheets.

Revised Sheets Supersedes NRC Ictter to B E Tenzer NRC letter to B E Tenzer dated June 10, 1981 dated January 5, 1981 STATEMENT OF AUTHORITY STATEMENT OF AUTHORITY dated April 24, 1981 dated January 17, 1979 FOREWORD dated April 27, 1981 FOREWORD dated Nov. 19, 1976 TABLE OF CONTENTS TABLE OF CONTENTS dated July 31, 1981 dated March 4, 1981 Sections Sections QA-I-2 Organization and Respon- QA-I-2 Organization and Respon-sibilities Rev 5 - dated sibilities Rev 4 - dated July 31, 1981 March 4, 1981 QA-I-5 Quality Assurance QA-I-5 Quality Assurance Evaluation of Suppliers / Contract Evaluation of Suppliers / Contract Rev 2 - dated July 31, 1981 Rev 1 - dated QA-II-9 Quality Assurance QA-II-9 Quality Assurance Rev 3 - dated July 31, 1981 Rev 2 - dated Please print your name on this memorandum and return to P D Agashiwala, 14th floor, Two World Trade Center, as acknowledgement of receipt, not later than a. gust 14, 1981.

Print Bookholder's Name Location Book No. Tel. No.

PDA/tp encls

, >> u co o UNITED STATES 8

o NUCLEAR REGULATORY COMMISSION '

WASHINGTON, D. C. 20646

  • JUN 101981 Mr. B. E. Tenzer Vice President Materials Engineering &

Quality Assurance Ebasco Services Incorporated Two World Trade Center New York, NY 10048

Dear Mr. Tenzer:

SUBJECT:

NRC ACCEPTANCE OF REVISIONS TO QA TOPICAL REPORT We have completed our review of proposed Revision 10 (dated April 30, 1981 and June 2,1981) to Ebasco Topical No. ETR-1001, "Ebasco Nuclear Quality Assurance Program Manual." The revisions concern general organizational and programmatic changes.

Based on our evaluation of the proposed changes described in Revision 10, we find that your revised topical report continues to meet the criteria of Appendix B to 10 CFR Part 50 and is, therefore, acceptable. To use the topical report in future license applications, Ebasco need only reference this topical report in Section 17 of the Safety Analysis Report. We do not intend to repeat our review of this topi-

^ cal report when it is referenced in an application unless changes occur in our acceptance criteria.

Should regulatory criteria or regulations change such that our conclusions about this topical report are invalidated, we will notify you. You will be given the

, opportunity to revise and resubmit it should you so desire. As noted above, should l

you desire to reference this topical report in support of quality assurance progr?ms for new nuclear power projects, the basis of our evaluation will be the acceptance criteria given in the revision to SRP Section 17.1 in use at that time.

Programatic changes by Ebasco to the quality assurance program described in this topical report are to be submittee to the NRC for review prior to implementation.

Organizational changes are to be ubmitted no later than 30 days after announcement.

Please replace our letter of January 5,1981 with this letter, renumber the report as ETR-1001, Rev.10A, and submit 36 copies to the NRC. Your submittal should iden-tify the changes by use of a black bar in the margin, and the revision number should be shown adjacent to the bar. Your transmittal letter should also identify the nuclear units to which this revised topical report will apply.

Should you have any questions regarding our review or if we can provide assistance, please feel free to contact me or Mr. William Belke at (301) 492-7741.

Sincerely,

/] (l' . An Walter P. Haass, Chief Quality Assurance Branch .