ML12243A392

From kanterella
Revision as of 18:31, 5 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Meeting Summary with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1
ML12243A392
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/18/2012
From: Lyon C
Plant Licensing Branch IV
To:
Union Electric Co
Lyon C
References
TAC ME9233
Download: ML12243A392 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 September 18, 2012 LICENSEE: Union Electric Company FACILITY: Callaway Plant, Unit 1

SUBJECT:

SUMMARY

OF AUGUST 29,2012, PRE-APPLICATION MEETING WITH UNION ELECTRIC COMPANY TO ADD A NEW TECHNICAL SPECIFICATION FOR THE CLASS 1E ELECTRICAL EQUIPMENT AIR CONDITIONING SYSTEM (TAC NO. ME9233)

On August 29,2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Union Electric Company (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the licensee's planned submittal of an amendment request for Callaway Plant, Unit 1, for a new Technical Specification (TS) to provide operability and surveillance requirements for the Class 1E electrical equipment air conditioning system.

The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML12227A347.

The licensee presented information on the background and content of the proposed request (ADAMS Accession No. ML12241A292). The licensee described its proposed TS for the Class 1E electrical equipment air conditioning system.

The NRC staff queried the licensee about several aspects of the proposed changes and provided comments for consideration by the licensee in developing its submittal. The licensee's staff acknowledged the NRC staff's questions and comments and stated that they would be considered as the licensee continues to prepare its submittal. Several representatives from other utilities were in attendance or participated by telephone. Industry and NRC staff participating in the meeting recognized the challenges raised by the underlying issues that the new TSs propose to address, but acknowledged that a generic solution has not yet been determined. No regulatory decisions were made at the meeting.

No Public Meeting Feedback forms were received.

- 2 Please direct any inquiries to me at 301-415-2296, or Fred.Lyon@nrc.gov.

Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENDEES AUGUST 29.2012. PRE-APPLICATION MEETING WITH UNION ELECTRIC COMPANY TO ADD A NEW TECHNICAL SPECIFICATION FOR THE CLASS 1E ELECTRICAL EQUIPMENT AIR CONDITIONING SYSTEM CALLAWAY PLANT, UNIT 1 LICENSEE S. Maglio J. Little R. Andreasen M. Smith B. Yates T. Elwood M. Markley R. Mathew J. Andersen H. Walker K. Scales S.Som M. Hamm G. Armstrong*

F. Lyon OTHERS L Parker, STARS Alliance T. Weber, Arizona Public Service Company (Palo Verde)

D. Bice, Entergy (ANO)

S. Wideman, Wolf Creek Nuclear Operating Company*

D. Buschbaum, STARS Alliance*

L Conklin, San Onofre Nuclear Generating Station*

F. Mowasat, San Onofre Nuclear Generating Station*

J. Morris, South Texas Project Nuclear Operating Company*

  • by telephone Enclosure

Meeting Notice ML12227A347, Meeting Summary ML12243A392, Handouts ML12241A292 *via email OFFICE DORLlLPL4/PM DORLlLPL4/LA DORLlLPL4/BC DORLlLPL4/PM NAME FLyon JBurkhardt* MMarkley FLyon DATE 9/13/18 9/13/12 9/14/12 9/18/12