Category:CORRESPONDENCE-LETTERS
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217G0801999-10-0707 October 1999 Informs That on 990930,staff Conducted mid-cycle PPR of Farley & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Will Conduct Regional Insps Associated with SG Removal & Installation ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity ML20212J8391999-09-30030 September 1999 Forwards RAI Re Request for Amends to Ts.Addl Info Needed to Complete Review to Verify That Proposed TS Are Consistent with & Validate Design Basis Analysis.Request Discussed with H Mahan on 990930.Info Needed within 10 Days of This Ltr ML20212J8801999-09-30030 September 1999 Discusses GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps. Util 980731,990607 & 03 Ltrs Provided Requested Info in Subj Gl.Nrc Considers Subj GL to Be Closed for Unit 1 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212E7031999-09-23023 September 1999 Responds to GL 98-01, Year 2000 Readiness of Computer Sys at Npps. Util Requested to Submit Plans & Schedules for Resolving Y2K-related Issues ML20212F1111999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C8041999-09-10010 September 1999 Responds to to D Rathbun Requesting Review of J Sherman Re Y2K Compliance.Latest NRC Status Rept on Y2K Activities Encl ML20212D4581999-09-10010 September 1999 Responds to to D Rathbun,Requesting Review of J Sherman Expressing Concerns That Plant & Other Nuclear Plants Not Yet Y2K Compliant ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N8041999-09-0808 September 1999 Informs That on 990930 NRC Issued GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition, to Holders of Nuclear Plant Operating Licenses ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20212C0071999-09-0202 September 1999 Forwards Insp Repts 50-348/99-05 & 50-364/99-05 on 990627- 0807.No Violations Noted.Licensee Conduct of Activities at Farley Plant Facilities Generally Characterized by safety-conscious Operations & Sound Engineering ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS ML20211G6851999-08-26026 August 1999 Informs That During Insp,Technical Issues Associated with Design,Installation & fire-resistive Performance of Kaowool Raceway fire-barriers Installed at Farley Nuclear Plant Were Identified L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210T2021999-08-0606 August 1999 Forwards Draft SE Accepting Licensee Proposed Conversion of Plant,Units 1 & 2 Current TSs to Its.Its Based on Listed Documents ML20210Q4641999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr to La Reyes,As Listed,With List of Individuals to Take exam,30 Days Before Exam Date ML20210J8341999-07-30030 July 1999 Forwards Second Request for Addl Info Re Util 990430 Amend Request to Allow Util to Operate Unit 1,for Cycle 16 Based on risk-informed Probability of SG Tube Rupture & Nominal accident-induced primary-to-second Leakage ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210G8181999-07-26026 July 1999 Forwards Insp Repts 50-348/99-04 & 50-364/99-04 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation IR 05000348/19990091999-07-23023 July 1999 Discusses Insp Repts 50-348/99-09 & 50-364/99-09 on 990308- 10 & Forwards Notice of Violation Re Failure to Intercept Adversary During Drills,Contrary to 10CFR73 & Physical Security Plan Requirements ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20196J6191999-07-0202 July 1999 Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed ML20196J7471999-07-0202 July 1999 Forwards RAI Re Cycle 16 Extension Request.Response Requested within 30 Days of Date of Ltr ML20196J5781999-07-0202 July 1999 Forwards RAI Re 981201 & s Requesting Amend to TS Associated with Replacing Existing Westinghouse Model 51 SG with Westinghouse Model 54F Generators.Respond within 30 Days of Ltr Date ML20196J6571999-07-0202 July 1999 Discusses Closure to TAC MA0543 & MA0544 Re GL 92-01 Rev 1, Suppl 1,RV Structural Integrity.Nrc Has Revised Rvid & Releasing It as Rvid,Version 2 as Result of Review of Responses ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed L-99-024, Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC1999-06-30030 June 1999 Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC L-99-025, Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.211999-06-30030 June 1999 Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.21 ML20196J8631999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-249, Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA1999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-224, Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments1999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195F1731999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-217, Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld1999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-225, Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants1999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195F0621999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195E9581999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195C6941999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program L-99-021, Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included1999-05-28028 May 1999 Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included L-99-203, Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program1999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program ML20195F2101999-05-24024 May 1999 Requests That Farley Nuclear Plant Proprietary Responses to NRC RAI Re W WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs, Be Withheld from Public Disclosure Per 10CFR2.790 L-99-180, Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI ML20206F4321999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI L-99-017, Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers ML20206C8021999-04-26026 April 1999 Forwards 1998 Annual Rept, for Alabama Power Co.Encls Contain Financial Statements for 1998,unaudited Financial Statements for Quarter Ending 990331 & Cash Flow Projections for 990101-991231 05000348/LER-1998-007, Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed1999-04-23023 April 1999 Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed L-99-015, Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.211999-04-21021 April 1999 Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.21 ML20206B4391999-04-21021 April 1999 Forwards Corrected ITS Markup Pages to Replace Pages in 981201 License Amend Requests for SG Replacement L-99-172, Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.21999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205S9501999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205R0431999-04-13013 April 1999 Forwards Correction to 960212 GL 95-07 180 Day Response. Level 3 Evaluation for Pressure Locking Utilized Analytical Models.Encl Page Has Been Amended to Correct Error 1999-09-23
[Table view] Category:UTILITY TO NRC
MONTHYEARML20064A7131990-09-17017 September 1990 Advises That Due to Reassignment,Jj Clark No Longer Needs to Maintain Senior Reactor Operator Licenses ML20059J2811990-09-14014 September 1990 Forwards List of Key Radiation Monitors Which Will Be Used as Inputs to Top Level Radioactivity Status Bar Re Spds.List Identifies Monitors Which Would Provide Concise & Meaningful Info About Radioactivity During Accidents ML20065D5961990-09-13013 September 1990 Responds to Violations Noted in Insp Repts 50-348/90-19 & 50-364/90-19.Response Withheld ML20059J1661990-09-13013 September 1990 Forwards Monthly Operating Rept for Aug 1990 for Jm Farley Nuclear Plant & Rev 10 to ODCM ML20059L0751990-09-12012 September 1990 Forwards Revised Pages to Rev 3 to, Second 10-Yr Interval Inservice Insp Program for ASME Code Class 1,2 & 3 Components ML20059J2911990-09-12012 September 1990 Forwards Operator Licensing Natl Exam Schedules for FY91 Through FY94,per Generic Ltr 90-07.Requalification Schedules & Estimated Number of Candidates Expected to Participate in Generic Fundamental Exam,Also Encl ML20064A7111990-09-12012 September 1990 Forwards Rev 1 to Relief Request RR-1, Second 10-Yr Interval Inservice Insp Program for ASME Code Class 1,2 & 3 Components ML20059J2891990-09-12012 September 1990 Confirms Rescheduling of Response to Fitness for Duty Program Notice of Violation 90-18-02,per 900907 Telcon ML20065D6621990-09-12012 September 1990 Forwards NPDES Permit AL0024619 Effective 900901.Limits for Temp & Residual Chlorine Appealed & Stayed ML20064A3431990-08-28028 August 1990 Forwards Corrected Insertion Instructions to Rev 8 to Updated FSAR for Jm Farley Nuclear Plant ML20059D4711990-08-22022 August 1990 Forwards Fitness for Duty Performance Data for Jan-June 1990 ML20059B5101990-08-22022 August 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1990.No Changes to Process Control Program for First Semiannual Period of 1990 Exists ML20056B2751990-08-20020 August 1990 Forwards Relief Requests from Second 10-yr Interval Inservice Testing Program for Class 1,2 & 3 Pumps & Valves. Request Incorporates Commitments in 891222 Response to Notice of Violation ML20056B2741990-08-20020 August 1990 Forwards Rev 2 to Unit Inservice Testing Program,For Review & Approval.Rev Incorporates Commitments Addressed in Util 891222 Response to Notice of Violation & Other Editorial & Technical Changes ML20058Q1481990-08-15015 August 1990 Forwards Rev 3 to FNP-1-M-043, Jm Farley Nuclear Plant Unit 1 Second 10-Yr Inservice Insp Program,Asme Code Class 1,2 & 3 Components ML20058P6201990-08-15015 August 1990 Forwards Rev 1 to FNP-2-M-068, Ten-Yr Inservice Insp Program for ASME Code Class 1,2 & 3 Components, Per 891207 & 900412 Responses to NRC Request for Addl Info ML20055G7701990-07-18018 July 1990 Updates 900713 Response to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount ML20055F7411990-07-11011 July 1990 Forwards Monthly Operating Rept for June 1990 & Corrected Monthly Operating Repts for Nov 1989 Through May 1990.Repts Revised to Correct Typo on Value of Cumulative Number of Hours Reactor Critical ML20055F3781990-07-10010 July 1990 Submits Final Response to Generic Ltr 83-28,Items 4.2.3 & 4.2.4.Util Position That Procedures Currently Utilized by Plant Constitute Acceptable Ongoing Life Testing Program for Reactor Trip Breakers & Components ML20055D4861990-07-0202 July 1990 Requests Authorization to Use Encl ASME Boiler & Pressure Vessel Code Case N-395 Re Laser Welding for Sleeving Process Described by Oct 1990,per 10CFR50.55a,footnote 6 ML20055D1001990-06-26026 June 1990 Responds to Violations Noted in Insp Repts 50-348/90-12 & 50-364/90-12 on 900411-0510.Corrective Actions:Electrolyte Level Raised in Lights Identified by Inspector to Have Low Electrolyte Level ML20044A6191990-06-26026 June 1990 Suppls 900530 Ltr Containing Results of SPDS Audit,Per Suppl 1 to NUREG-0737.One SPDS Console,Located in Control Room,Will Be Modified So That Only SPDS Info Can Be Displayed by Monitor.Console Will Be Reconfigured ML20043G4741990-06-11011 June 1990 Submits Addl Info Re 900219 Worker Respiratory Protection Apparatus Exemption Rev Request.Proposed Exemption Rev Involves Features Located Entirely within Restricted Area as Defined in 10CFR20 ML20043C1851990-05-29029 May 1990 Forwards Proposed Schedules for Submission & Requested Approval of Licensing Items ML20043B5941990-05-25025 May 1990 Provides Rept of Unsatisfactory Performance Testing,Per 10CFR26,App A.Error Caused by Olympus Analyzer Which Allowed Same Barcode to Be Assigned to Two Different Samples. Smithkline Taken Action to Prevent Recurrence of Scan Error ML20042G7461990-05-10010 May 1990 Certifies That Plant Licensed Operator Requalification Program Accredited & Based Upon Sys Approach to Training,Per Generic Ltr 87-07.Program in Effect Since 890109 ML20042F0831990-05-0101 May 1990 Forwards Rev 18 to Security Plan.Rev Withheld ML20042G3081990-04-25025 April 1990 Forwards Alabama Power Co Annual Rept 1989, Unaudited Financial Statements for Quarter Ending 900331 & Cash Flow Projections for 1990 ML20042E4121990-04-12012 April 1990 Provides Addl Info Re Review of Second 10-yr Inservice Insp Program,Per NRC 890803 Request.Relief Request RR-30 Requested Reduced Holding Time for Hydrostatically Testing Steam Generator Secondary Side ML20012E9571990-03-27027 March 1990 Forwards Annual Diesel Generator Reliability Data Rept,Per Tech Spec 6.9.1.12.Rept Provides Number of Tests (Valid or Invalid),Number of Failures for Each Diesel Generator at Plant for 1989 & Info Identified in Reg Guide 1.108 ML20012D9661990-03-22022 March 1990 Forwards Annual ECCS Evaluation Model Changes Rept,Per Revised 10CFR50.46.Info Includes Effect of ECCS Evaluation Model Mods on Peak Cladding Temp Results & Summary of Plant Change Safety Evaluations ML20012D8901990-03-20020 March 1990 Clarifies 891130 Response to Generic Ltr 83-28,Item 2.2.1 Re Use of Q-List at Plant,Per NRC Request.Fnpims Data Base Utilized as Aid for Procurement,Maint,Operations & Daily Planning ML20012C4701990-03-15015 March 1990 Responds to NRC 900201 Ltr Re Emergency Planning Weaknesses Identified in Insp Repts 50-348/89-32 & 50-364/89-21. Corrective Actions:Cited Procedures Revised.Direct Line Network Notification to State Agencies Being Implemented ML20012C6241990-03-14014 March 1990 Informs of Resolution of USI A-47,per Generic Ltr 89-19 ML20012C4651990-03-13013 March 1990 Provides Verification of Nuclear Insurance Reporting Requirements Specified in 10CFR50.54 w(2) ML20012C2051990-03-0505 March 1990 Forwards SPDS Critical Function Status Trees,Per G West Request During 900206 SPDS Audit at Plant.W/O Encl ML20012A1621990-03-0202 March 1990 Forwards Addl Info Inadvertently Omitted from Jul-Dec 1989 Semiannual Radioactive Effluent Release Rept,Including Changes to Process Control Program ML20012A1301990-03-0101 March 1990 Responds to Generic Ltr 90-01 Re Request for Voluntary Participation in NRC Regulatory Impact Survey.Completed Questionnaire Encl ML20043A7481990-02-0202 February 1990 Forwards Util Exam Rept for Licensed Operator Requalification Written Exams on 900131 ML20006D2311990-01-31031 January 1990 Responds to NRC Bulletin 89-003 Re Potential Loss of Required Shutdown Margin During Refueling Operations. Refueling Procedures Will Be Revised to Incorporate Guidance That Will Preclude Inadvertent Loss of Shutdown ML20006A9091990-01-23023 January 1990 Forwards Response to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment.Util Has Program to Perform Visual Insps & Cleanings of Plant Svc Water Intake Structure by Means of Scuba Divers ML20005E4931989-12-28028 December 1989 Provides Certification That fitness-for-duty Program Meets 10CFR26 Requirements.Testing Panel & cut-off Levels in Program Listed in Encl ML20005E3681989-12-28028 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-28 & 50-364/89-28 on 891002-06.Corrective Actions:All Piping Preparation for Inservice Insp Work in Containment Stopped & All Participants Assembled to Gather Facts on Incident ML20005E1971989-12-27027 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-22 & 50-364/89-22 on 890911-1010.Corrective Actions:Steam Generator Atmospheric Relief Valve Closed & Core Operations Suspended.Shift Supervisor Involved in Event Counseled ML20011D5041989-12-22022 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-26 & 50-364/89-26.Corrective Actions:Personnel Involved in Preparation of Inservice Test Procedures Counseled. Violation B Re Opening of Pressurizer PORV Denied ML19332F2111989-12-0707 December 1989 Forwards Final Response to NRC 890803 Request for Addl Info Re Review of Updated Inservice Insp Program,Summarizing Results of Addl Reviews & Providing Exam Listing Info ML19332F0791989-12-0707 December 1989 Responds to Violations Noted in Insp Repts 50-348/89-22 & 50-364/89-22.Corrective Actions:All Managers Retrained on Intent of Overtime Procedures & Sys Established to Provide Independent Check of All Time Sheets Each Pay Period ML19332F1141989-12-0707 December 1989 Forwards Description of Instrumentation Sys Selected in Response to Generic Ltr 88-17, Loss of DHR, Per Licensee 890127 Commitment.Hardware Changes Will Be Implemented During Unit 1 Tenth & Unit 2 Seventh Refueling Outages ML19332F1241989-12-0707 December 1989 Forwards Response to NRC 890803 Request for Addl Info Re Review of Second 10-yr Inservice Insp Program,Per 891005 Ltr ML19353B0071989-12-0606 December 1989 Forwards Rev 1 to Safeguards Security Contingency Plan.Rev Withheld 1990-09-17
[Table view] |
Text
' '
AMbim Pow;r Comp!ny 600 North 16th Street Post Off.co Box 2641 8>tmingnam. A:abama 35291 Teiepncne 205 323-5341 L k L';;&^lJR, tit Alabama Power
.n .,- ...c, n, April 1, 1980 Docket No. 50-348 Director, Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
'4an hin g t on , D.C. 20555 Attn: Mr. D. G. Eisenhut
Dear Mr. Eisenhut:
Alabama Power Company submits the enclosed response, as requested in enclosure two of your letter dated October 13, 1979, concerning Auxiliary Feedwater Systems.
If you have any further questions, please advise.
Sincerely yours,
.
-
N y o. : E . ' .
F. L. Claytott , Jr.
FLC/RF:aw Enclosure cc: Mr. R. A. Thomas Mr. G. F. Trowbridge
/9o 39' s
///
8 004 080 [$f
.
.
, . . . . _ ..- _ .. . - . _ . .
. .
ENCLOSURE Question 1
- a. Identify the plant transient and accident conditions considered in establishing AFWS flow requirements, including the following events:
(1) Loss of Main Feed (LMFW)
(2) LMFW w/ loss of offsite AC power-(3) LMFW w/ loss of onsite and offsite AC power (4) Plant cooldown (5) Turbine trip with and without bypass (6) Main steam isolation valve closure (7) Main feed line break (8) Main steam line break (9) Small break LOCA (10) Other transient or accident conditions not listed above.
- b. Describe the plant protection acceptance criteria and corresponding technical bases used for each initiating event identified above.
The acceptance criteria should address plant lLaits such as:
(1) Maximum RCS pressure (PORV or safety valve actuation)
(2) Fuel temperature or damage limits (DNB, PCT, maximum fuel central temperature)
.-- (3) RCS cooling rate limit to avoid excessive coolant shrinkage (4) Minimum steam generator level to assure sufficient steam generator heat transfer surface to remove decay heat and/or cool down the primary system.
RESPONSE
- a. The reactor plant conditions which impose safety-related performance requirements on the design of the Auxiliary Feedwater System are as
. _ _ follows for the Joseph M. Farley Unit No. 1 plant.
(1) Loss of main feedwater with of f site power available (2) Station blackout (i.e., loss of main f eedwater without of f site power available)
(3) Loss of all AC Power (4) Cooldown (5) See note (6) See note (7) Feedline rupture (8) Steamline rupture (9) Loss of Coolant Accident (LOCA)
NOTE: The transient conditions resulting from a turbine trip with and without bypass and main steam isolation valve closure which impose safety-related performance requirements on the design of the AFWS are bounded by the transients and conditions resulting from events listed above.
. . . . _ _
. , . . . _ . . _ _ _ _ _ _ . _ .
. .
- b. Table 13-1 su=marizes the criteria which are the general design bases for each event, discussed in the response to Question 1.a above.
Specific assumptions used in the analyses to verify that the design bases are met are discussed in response to Question 2.
The primary function of the Auxiliary Feedwater System is to provide sufficient heat removal capability for heatup transients, returning Tavg to its no-load value following a reactor trip; and cooling the reactor coolant system to the point at which RER can be established.
Other plant protection systems are designed to meet short term or pre-trip fuel failure criteria. The effects of excessive coolant shrinkage are bounded by the analysis of the ruprure of a main steam pipe transient. The maximum flow requirements determined by other bases are incorporated into this analysis, resulting in no additional
-
flow requirements.
'
--
WD
,
__ -
. . .. -
. . . - . . - .- .- . _ . - .
. .
Question 2 Describe the analyses and assumptions and corresponding technical justi-fication used with plant conditions considered in 1.a above including:
- a. Maximum reactor power (including instrument error allowance) at the time of the initiating transient or accident.
.
- b. Time delay from initiating event to reactor trip.
- c. Plant parameter (s) which initiates AFWS flow and tLas delay between initiating event and introduction of AFWS flow into steam generator (s).
- d. Minimum steam generator water level when initiating event occurs.
- a e. Initial steam generator water inventory and depletion rate before J and after AFWS flow commences -- identify reactor decay heat rate used.
- f. Maximum pressure at which steam is released from steam generator (s) and against which the AFW pump must develop sufficient head.
- g. Minimum number of steam generators that must receive AFW flow; e.g. ,
1 out of 27 2 out of 4?
- h. RC flow condition -- continued operation of RC pumps or natural circulation.
~~
- 1. tiaximum AFW inlet temperature.
'
- j. Following a postulated steam or feed line break, time delay assumed to isolate break and direct AFW flow to intact steam generator (s).
AFW pump flow capacity allowance to accommodate the time delay and maintain minimum steam generator water level. Also identify credit -
taken for primary system heat removal due to blowdown.
- k. Volume and maxtmum temperature of water in main feed lines between steam generator (s) and AFWS connection to main feed line.
]~~
- 1. Operating condition of steam generator normal blowdown following initiating event.
- m. Primary and secondary system water and metal sensible heat used for i
cooldown and AFW flow si=ing,
- n. Time at hot standby and time to cooldown RCS to RRR system cut in temperature to size AFW water source inventory.
RESPONSE
.
Analyses have been performed for the limiting transients which define the AFWS performance requirements. These analyses have been provided for review and have been approved in the' Farley. FSAR. Specifically,-
they include:
e i
l L
-
- --.- - .._,. _ _ _ , _
a .
-
Loss of Main Feedwater (Station Blackout)
-
Rupture of a Main Feedwater Line
-
Rupture of a Main Steam Line Inside Containment In addition to the above analyses, calculations have been performed specifically for the Joseph M. Farley Unic Mo.1 to determine the plant cooldown flow (storage capacity) requirements. The Loss of All AC Power is evaluated via a comparison to the transient results of a Blackout, assuming an available auxiliary pump having a diverse (non-AC) power supply.
The LOCA analysis incorporates the system flows requirements as defined by other transients, and therefore is not performed for the purpose of specifying AFWS flow requirements. Each of the analyses listed above are explained in further detail in the following sections of this response.
The assumptions used in the Auxiliary Feedwater Design Verification are listed in Table 2-1.
-
Loss of Main Feedwater (Blackout)
A loss of feedwater, assuming a loss of power to the reactor coolant pumps, was performed in FSAR Section 15.2.8 for the purpose of showing that for a station blackout transient, a single motor driven auxiliary feedwater pump delivering flow to two steam generators does not result in filling the pressurizer. Furthermore, the peak RCS pressure remains below the criterion for Condition II transients and no fuel failures occur (refer to Table 1B-1).
Table 2-1 summarizes the assumptions used in this analysis. The transient analysis begins at the time of reactor trip. This can be done because the trip occurs on a steam generator level signal, hence the core power,
~~'
temperatures and steam generator level at time of reactor trip do not depend on the event sequence prior to trip. Although the time from the loss of feedwater until the reactor trip occurs cannot be determined from this analysis, this delay is expected to be 20-30 seconds. The analysis assu=es that the plant is initially operating at 102% (calorimetric error) of the Engineered Safeguards Design (ESD) rating shown on the table, a very conservative assumption in defining decay heat and stored energy in the RCS.
The reactor is assumed to be tripped on steam / feed mismatch coincident with low steam generator level, allowing for level uncertainty. The FSAR shows
--
that there is a considerable margin with respect to filling the pressurizer.
A loss of normal feedwater transient with the assumption that the two smallest auxiliary f eedwater pumps and reactor coolant pumps are running results in even more margin.
This analysis establishes the capacity of the smallest single pump and also establishes train association of equipment so that this analysis remains valid assuming the most limiting single failure.
Rupture of Main Feedwater Line The double ended rupture of a main feedwater pipe downstream of the main feedwater line check valve is analyzed in FSAR Section 15.4.2.2. Table 2-1 summarizes the assumptions used in this analysis. Reactor trip is assumed to occur when the unaf fected steam generators are at the low level setpoint (adjusted for errors) and the faulted loop is assumed to be empty. This conservative assumption maximizes the stored heat prior to reactor trip and
.n , . . .. . . . .. ~. - -~.~ ~ - . . . -
, ,
minimizes the ability of the steam generator to remove heat from the RCS following reactor trip due to a conservatively small total steam generator
'
inventory. As in the loss of normal feedwater analysis, the initial power rating was assumed to be 102% of the ESD rating. The flow orifices in the
! Joseph M. Farley Unit No. _1 auxiliary feedwater system allow the delivery of 150 gpm to the two intact loops in 1 minute. At 10 minutes, the operator is assumed to have-isolated the auxiliary feedwater from the break at which tLee the full 350 gpm requirement commences. The criteria listed in Table 1B-1 are met.
This analysis may establish the capacity of single pumps, establishes i requirements for layout to preclude indefinite loss of auxiliary feedwater to the postulated break, and establishes train association requirements for equipment so that the AFWS can deliver the mini =um flow required in 1 minute and 10 minutes assuming the worst single failure.
-
Rupture of a Main Steam Line Inside Containment Because the steamline break transient is a cooldown, the AFWS is not needed to remove heat in the short ters. Furthermore, addition of excessive auxiliary feedwater to the faulted steam generator will af fect the peak containment pressure following a steamline break inside containment. This transient is performed at four power levels for several break sizes.
Auxiliary feedwater is assumed to be initiated at the time of the break, independent of system actuation signals. The maximum flow is used for this j analysis, considering pump runout. Table 2-1 summarizes the assumptions used in this analysis. At 30 minutes af ter the break, it is assumed that
'
the operator has isolated the AFWS from the faulted steam generator which
~~
subsequently blows down to ambient pressure. The criteria stated in Table 1B-1 nre met.
This transient establishes the maximum allowable auxiliary feedwater flow rate to a single faulted steam generator assuming all pumps operating, establishes the basis for runout protection, if needed, and establishes layout requirements so that the flow requirements may be met considering the worst single failure.
--
Plant Cooldown
'
'
Maximum and minimum flow requirements from the previously discussed transients meet the flow requirements of plant cooldown. This operation, however, defines the basis for tankage size, based on the required cool-down duration, maximum decay heat input and maximum stored heat in the system. The auxiliary feedwater system partially cools the system to the
- point where the RHRS may complete the cooldown, i.e., 3500F in the RCS.
Table 2-1 shows the assumptions used to determine the cooldown heat capacity of the auxiliary feedwater system.
The cooldown is assumed to commence at the maximum rated power, and maximum trip delays and decay heat source terms are assumed when the reactor is tripped. Primary metal, primary water, secondary system metal and secondary system water are all included in the stored heat to '
be removed by the AFWS. See Table 2-2 for the itens constituting the sensible heat stored in the MSSS.
l This operation is analyzed to establish minimum tank size requirements
! for auxiliary feedwater fluid source which are normally aligned.
!
I t
.
. . . . , . - ....
- .> ... .- . . .
. .
.
Question 3 Verify that the AFW pumps in your plant will supply the necessary flow to the steam generator (s) as determined by items 1 and 2 above considering a single failure. Identify the margin in sizing the pump flow to allow for pump recirculation flow, seal leakage and pump wear.
Resp 0NSE Flow rates for the design transients described in Response 2, requiring minimums low, have been met by the system for the worst single failure.
The flows for those single f ailures considered are tabulated for the various transients in Table 3-1, including the following:
~
A. A/C Electrical Power Train Failure B. Turbine Driven Pump Failure C. Motor Driven Pump Failure Operator intervention within 10 minutes is required in order to meet the minimum flow requirements on the Feedline Rupture.
The AFW pumps' design points for minimum flow were conservatively specified so that the design flow is produced at the maximum steam generator pressure developed when all main steam safety valves are vide open and fully relieving.
System flow calculations verified pump acceptability by assuming pump
__,
performance degradation, due to wear, to be^ consistent with the limits of the Technical Specification.
AFW pump recirculation flow is through mini-flow orifices, back to the condensate storage tank. In all system flow analyses used to establish minimum flow, it is conservatively assumed that the mini-flow lines are open and operational. In addition, the mini-flow orifices are assumed to be worn and to pass 20% more flow, at a specified pressure drop, than a new orifice.
' * "
The AFW purps have been provided with mechanical seals. Since the leakage characteristics of mechanical seals are a few drops per minute, no pump margin was added for seal leakage.
As stated in response to question 2, the upper bound for auxiliary feedwater flow is e stablished by the steamline break transient. For this case operator,-
intervent.on is required within 30 minutes and no f ailures were assumed.
.
l 4 g ,
(
'
TABLE IB-1 Criteria for Auxiliary Feedwater System Design Basis Conditions -
Condit' ion Additional Design or Transient Classification
- Criteria Loss of Main Feedwater Condition II Peak.RCS . pressure not to exceed design pressure.
-No consequential fuel failures ,
Station Blackout Condition II (same as L5fFW) Pressurizer does not fill with 1 single motor driven aux. feed pump feeding 2 SGs.
,
Steamline Rupture Condition IV 10CFR100 dose limits --
,
containment design pressure '!'
4 _not exceeded
?
'
Feedline Rupture Condition IV 10CFR100 dose limits. "
RCS design pressure not ;
exceeded
. Loss of all A/C' Power N/A Note 1 Pressurizer does not fill with i the turbine driven aux. feed s pump feeding 2 SCs. ,
' Loss of Coolant Condition III 10 CFR 100 dose limits 10 CFR 50 PCT limits Condition IV 10 CFR 100 dose limits '
10 CFR 50 PCT limits
?
Cooldown N/A 100 F/hr 5470F to 3500F
Note 1 Although this transient establishes the' basis for 'AFW pump powered by.a diverse power source, this is not . l evaluated _ relative to typical. criteria since multiple' failures must be assumed to postulate this transient._ .
.
9
.
-l
_. _ - _ _ _ . - _
.l' 1
'
TABLE 2-l'
SUMMARY
.0F ASSUMPTIONS USED IN AFWS DESIGN VERIFICATION ANALYSES Loss of Feedwater > bin Steamline Break Transient (station blackout) Cooldown Main Feedline Break (Containment)
- a. Max reactor power 102% of ESD rating 2713 MWt 102% of ESD rating 0, 30, 70, 102% of rated (102% of 2774'MWt) (102% of 2774 MWt) (% of 2660 MWt)
- b. Time delay f rom 2 sec 2 sec 2 sec variable event to Rx trip c.. AFNS actuation Low-low SG Icvel NA low-low SG 1evel- Assumed immediately signal / time delay l1 minute 1' minute O see (no delay) for AFWS flow
'd. SG water level.at (10-1o SG level) NA (lo SG 1evel + N/A time of reactor' 0% NR. span steamfeed mismatch) trip .2 0 20% NR span 1 0 tube sheet
- c. . Initial SG in- 60,700 lbm/SG 100,800 lbm/SG 93,100 lbm/SG consistent with power ventory (at trip) G 5170F
' Rate of change See FSAR Figure .N/A turnaround 1600 N/A before & after 15.2-31. sec.
AFWS actuation de' cay heat' FSAR Firure 15.1-6' FSAR Figure FSAR Figure 15.1-6 FSAR Figure 15.1-6.
ANS + 20% 15.1-6
- f. AFW pump design-
.
1133 psia 1133 psia 1133 psia N/A
.g. Minimum # of SGs 2 of 3. N/A 2 of 3 N/A
'which must re-ceive.AFW flow
- h. RC pump status Tripped G reactor Tripped Tripped G reactor All operating trip trip c i. . Maximum AFW 1200F 1000F 1200F equal to main feed
. temperature temperature
.
.-
'}- -
,
TABLE 2-1 (Continued) , 1
.
'
Loss of'Feedwater Main Steamline Break
' Transient (station blackout) Cooldown Main Feedline Break (containment)
- j. - Operator action none N/A 10 min. 30 min.
' - k. MFW purge volume / '100 ft 3/436.2 F 450 ft 3/per 330 ft 3/436.2 F 150'ft3/ loop (for temp. loop dryout time) 436.2 F
- 1. Normal ~ blowdown none assumed none assumed none assumed none assumed
- m. Sensibic heat see cooldown Table 2-2 see cooldown N/A
- n. :
Time'at' standby / 2 hr/4.hr 2 hr/4 hr 2 hr/4 hr U/A time to cooldown
-
.
'
to RHR o.- AFW flow rate 350 GPM - constant variable 150 gpm at 1 min 880 CPM (constant)f to (min. requirement) increased to 350 broken SG.
gpm af ter _10 min (max. requirement)
(Min. requirement)-
t.
I
-
s s .
. . _
-
>
. .
-TABLE 2-2
SUMMARY
OF SENSIBLE HEAT SOURCES Primary Water Sources (initially at rated power temperature and inventory)
'
- RCS-fluid
'
- Pressurizer fluid (liquid and vapor)
!
Primary Metal Sources (initially at rated power temperature)
- Reactor coolant piping, pumps and reactor vessel
- Pressurizer
- Steam generator tube metal' and tube sheet i _ - Steam generator metal below tube sheer
- Reactor vessel. internals Secondary Water Sources (initially at rated power temperature and inventory)
- Steam generator fluid (liquid and vapor)
- Main feedwater purge fluid between steam generator and AFWS piping..
Secondary Metal Sources (initially at rated power temperature)
- All steam generator metal above tube sheet, excluding tubes.
i _ . .
~
!l
!
.
Nb i
i I
e 4
1 a
4 4
,
4
--- - , - , , <.r -
,-
. .. . _ . ,_. - . .. . , - - - _ . . ..- ., , ~ _ .... . , _ . ..
, , .
TABLE 3-1 AUXILIARY FEEDWATER FLOW (1) TO STEAM GENERATORS FOLLOWING AN ACCIDENT / TRANSIENT WITH SELECTED SINGLE FAILURE - GPM Single Failure Elec. Train TD Pump MD Pump Accident / Transient . Failure Failura Failure A B C
- 1. Loss of Main FW 775 535 775
- 2. Feedline Rupture (2) (2) (2)
- 3. . Blackout 775 535 775'
- 4. Cooldown 775 535 775 NOTES:
(1) Items 1 thru 4 are minimum expected flows to intact loops.
_.
(2) Ten minute operator action is required to isolate AFW flow to faulted loop. Prior to operator action, flow is 150 gpm to unfaulted loops; af ter operator ' action, flow is 350 gpm to unfaulted loops.
..