Letter Sequence RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
Results
Other: ML100980062, ML101040675, ML101050307, ML101110054, ML101170056, ML101460059, ML103230048, ML103510668, ML110180524, ML111600187, ML11165A023, ML111750188, ML111821975, ML11252B053, ML11291A157, ML11307A393, ML11335A127, ML12044A329, ML12081A275, ML12082A209, ML12181A020
|
MONTHYEARML1009205462010-03-31031 March 2010 Comment (1) of John D. Greenhill on Behalf of Himself Regarding Re-Licensing of Columbia Generating Station Project stage: Request ML1009800622010-03-31031 March 2010 Comment (2) of Jerome Delvin Supporting Columbia Generating Station'S License Renewal Project stage: Other ML1010406752010-04-0202 April 2010 Comment (3) of David V. Taylor, Et. Al., on Behalf of Washington State Legislature, Supporting Energy Northwest'S License Renewal for Columbia Generating Station to Extend Operating License Through 2043 Project stage: Other ML1012410372010-04-0606 April 2010 Transcript of Columbia Generating Station License Renewal Process and Environmental Scoping Public Meeting, Evening Session, 04/06/2010, Pages 1-30 Project stage: Meeting ML1010503072010-04-0606 April 2010 Comment (4) of James O. Luce, on Behalf of Washington State Energy Facility Site Evaluation Council, on Columbia Generating Station License Renewal Application Project stage: Other ML1019605472010-04-0606 April 2010 License Renewal, Written Comments of Gene Kinsey from Public Scoping Meeting Project stage: Meeting ML1012410022010-04-0606 April 2010 Transcript of Columbia Generating Station License Renewal Process and Environmental Scoping Public Meeting, Afternoon Session, April 06/2010, Pages 1-39 Project stage: Meeting ML1011100522010-04-0707 April 2010 Comment (5) of Brad Peck, Rick Miller, & Robert E. Koch Supporting Energy Northwest'S Columbia Generating Station License Renewal Application to the Nuclear Regulatory Commission Project stage: Request ML1011604352010-04-0909 April 2010 G20100244/LTR-10-0176/EDATS: SECY-2010-0219 - Ltr., Russell Jim, Storage of Spent Power Reactor Fuel at Columbia Generating Station Project stage: Request ML1011100532010-04-0909 April 2010 Comment (6) of Tim Sheldon Supporting Renewal of the Operating License for the Columbia Generating Station Project stage: Request ML1011700562010-04-12012 April 2010 Comment (8) of Washington State Senate, Supporting License Renewal of Columbia Generating Station Operated by Energy Northwest Project stage: Other ML1011100542010-04-12012 April 2010 Comment (7) of Larry Haler and Brad Klippert on Behalf of the Wa House of Representatives Supporting License Renewal of the Columbia Generating Station Operated by Energy Northwest Project stage: Other ML1011804592010-04-19019 April 2010 Comment (9) of Senator Phil Rockefeller, Washington State Adding His Voice to Those Strongly Supporting Relicensing of Columbia Generating Station as an Essential Asset in Washington'S Energy Resources Project stage: Request ML1032300482010-04-21021 April 2010 Comment (11) of Various Individuals on Behalf of Energy Northwest Re Environmental Review of Columbia Generating Station'S License Renewal Project stage: Other ML1012503142010-05-10010 May 2010 04/06/2010 - Meeting Summary-CGS License Renewal Overview and Environmental Scoping Meetings Project stage: Meeting ML1012505192010-05-10010 May 2010 04/06/2010 - Summary of Public License Renewal Overview and Environmental Scoping Meetings Related to the Review of the Columbia Generating Station License Renewal Application (TAC Nos. ME3058 and ME3121) Project stage: Meeting ML1014600592010-05-14014 May 2010 Comment (10) of Gary Robertson on Behalf of Washington State, Department of Health, on Environmental Review of Columbia Generating Station'S License Renewal Project stage: Other ML1017604212010-07-0101 July 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - SAMA Review Project stage: RAI ML1017506552010-07-0202 July 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - Environmental Review Project stage: RAI ML1018100912010-07-0808 July 2010 Request for Additional Information Related to the Environmental Site Audit for Columbia Generating Station License Renewal Project stage: RAI ML1018802892010-07-15015 July 2010 June 28, 2010, Summary of Telephone Conference Call Held Between NRC and Energy Northwest Concerning Draft Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application Project stage: Draft RAI GO2-10-105, Response to Request for Additional Information License Renewal Application2010-08-0505 August 2010 Response to Request for Additional Information License Renewal Application Project stage: Response to RAI GO2-10-108, Response to Request for Additional Information, License Renewal Application2010-08-0909 August 2010 Response to Request for Additional Information, License Renewal Application Project stage: Response to RAI ML1023802882010-08-0909 August 2010 Response to Request for Additional Information License Renewal Application, Enclosure B, Terrestrial Ecology Documents Project stage: Response to RAI ML1021003032010-08-10010 August 2010 Schedule Revision for the Environmental Review of the Columbia Generating Station License Renewal Application Project stage: Approval GO2-10-138, Response to Request for Additional Information on License Renewal Application2010-09-17017 September 2010 Response to Request for Additional Information on License Renewal Application Project stage: Response to RAI ML1026302282010-10-0101 October 2010 04/27/10 Summary of Tribal Outreach Informational Meeting Concerning Columbia Generating Station License Renewal and Hanford Low Level Waste Project stage: Meeting ML1028709842010-11-10010 November 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application-Sama Review Project stage: RAI ML1035106682010-12-17017 December 2010 E-mail Dtd 12/17/2010, Subj: NRC Ba/Efh Assessment for Columbia Generating Station License Renewal Review Project stage: Other GO2-10-178, Response to Request for Additional Information License Renewal Application2010-12-21021 December 2010 Response to Request for Additional Information License Renewal Application Project stage: Response to RAI ML1027702322010-12-29029 December 2010 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Application by Energy Northwest for Renewal of the Operating License for Columbia Generating Station Project stage: Approval ML1034305262011-01-10010 January 2011 Schedule Revision for the Review of the Columbia Generating Station License Renewal Application (TAC Nos. ME3058, ME3121) Project stage: Approval ML1034001632011-01-18018 January 2011 06/08/10 - 06/10/10 Summary of Site Visit in Support of the Environmental Review of the License Renewal Application for Columbia Generating Station Project stage: Approval ML1101805242011-01-18018 January 2011 License Renewal, e-mail Dated 1/18/2011 Project stage: Other GO2-11-032, Response to Request for Additional Information for the Review of the License Renewal Application2011-01-28028 January 2011 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML1104005102011-03-0101 March 2011 1/19/11 Summary of Telephone Conference Call Held Between USNRC and Energy Northwest Concerning Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application Project stage: RAI ML1106703792011-03-10010 March 2011 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - Severe Accident Mitigation Alternative Review Project stage: RAI GO2-11-082, Environmental Authorizations for CGS Operations2011-04-20020 April 2011 Environmental Authorizations for CGS Operations Project stage: Request GO2-11-092, Response to Request for Additional Information Related to the Review of the Severe Accident Mitigation Alternative Analysis2011-05-0606 May 2011 Response to Request for Additional Information Related to the Review of the Severe Accident Mitigation Alternative Analysis Project stage: Response to RAI ML11157A0362011-06-0505 June 2011 Letter from Heart of America Northwest Public Involvement Lists and Notices, Including Requests to Be Added to Lists and Requests for Hearings on the Draft EIS for Columbia Generating Station Project stage: Request ML1116001872011-06-0909 June 2011 E-mail Dtd 6/9/11, Subj: Energy Nw, Columbia Generating Station Public Involvement and Notice List, Request for Hearings Re EIS Project stage: Other ML11151A2222011-06-14014 June 2011 Schedule Revision for the Environmental Review of the Columbia Generating Station License Renewal Application Project stage: Approval ML1116802212011-06-16016 June 2011 Request for List of Protected Species within the Area Under Evaluation for the Columbia Generating Station License Renewal Application Review Project stage: Request ML1117501882011-06-23023 June 2011 Environmental Authorizations for Current CGS Operations Project stage: Other ML1118219752011-06-27027 June 2011 E-mail Dtd 6/27/2011, Subj: NRC Ba/Efh Assessment for Columbia Generating Station License Renewal Review Project stage: Other ML11165A0232011-08-23023 August 2011 Biological Assessment and Essential Fish Habitat Assessment for License Renewal of Columbia Generating Station Project stage: Other ML11214A2372011-08-30030 August 2011 RAI for the Review of the Columbia Generating Station LRA-Severe Accident Mitigation Alternative Review Project stage: RAI ML11227A0072011-08-31031 August 2011 NUREG-1437 Supp 47 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Columbia Generating Station. Project stage: Acceptance Review ML11252B0532011-09-0101 September 2011 Comment (1) of Robert G. Whitlam, on Behalf of Washington Dept of Archaeology & Historic Preservation Columbia Generating Station License Renewal Project stage: Other ML1126306032011-09-20020 September 2011 Meeting Slides Preliminary Site-Specific Results of the License Renewal Environmental Review for Columbia Generating Station Project stage: Meeting 2010-08-05
[Table View] |
|
---|
Category:Letter
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 ML23206A2442023-07-25025 July 2023 Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance ML23163A2502023-06-12012 June 2023 Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report ML23157A2702023-06-0101 June 2023 4-2022-011 -022 Letter - OI Closure to Licensee IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 2024-01-08
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22242A1082022-08-30030 August 2022 Information Request, Information Request, Security IR 2022404 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information ML22145A4462022-06-0606 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000397/2022401 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22041A4572022-02-10010 February 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000397/2022010) and Request for Information ML21277A3572021-10-12012 October 2021 CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 ML20034E6082020-02-0303 February 2020 NRR E-mail Capture - RAI Formal Release Columbia TSTF 563 LAR, 30 Day Response Period Due March 3, 2020 ML20028E1512020-01-27027 January 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000397/2020002) and Request for Information ML19267A1842019-09-24024 September 2019 Request for Information for Upcoming Open Phase Condition Inspection at Columbia Generating Station ML19232A2282019-08-20020 August 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia Exigent Amendment - One Electrical RAI, ML19183A4752019-07-0202 July 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia HVAC LAR L-2019-LLA-0034 ML18088A0152018-03-29029 March 2018 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000397/2018010) and Request for ML17341B0272017-12-0707 December 2017 NRR E-mail Capture - RAI Associated with Columbia Amendment Request Revise Tech Spec 5.5.12 for Permanent Extension of Type a and Type C Containment Testing Frequencies for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - New RAI Response Da ML17292A0572017-10-18018 October 2017 NRR E-mail Capture - New RWCU RAI Due Date Now November 24, 2017 ML17249A6882017-09-0606 September 2017 NRR E-mail Capture - RAIs for Columbia Relief Request RAI (MF8925), 3ISI-19 ML17205A3152017-07-20020 July 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000397/2017004) and Request for Information ML17193A2192017-07-12012 July 2017 NRR E-mail Capture - Columbia RWCU LAR MF8318, Formal Release of RAIs ML17144A1702017-05-24024 May 2017 NRR E-mail Capture - NRC RAIs for Columbia Relief Request MF8922, 3ISI-16 ML17047A7492017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais ML17006A0922017-01-0404 January 2017 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML17006A0902017-01-0404 January 2017 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16356A1382016-12-21021 December 2016 NRR E-mail Capture - Columbia Mur LAR Evib RAIs Non - Proprietary Version - Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate ML16342C4322016-12-0707 December 2016 NRR E-mail Capture - Columbia Measurement Uncertainty Recapture Power Uprate LAR Rais: Human Performance: MF8060, Formal Release for Response on Monday January 9, 2017 ML16327A1842016-11-22022 November 2016 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16323A1192016-11-16016 November 2016 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16218A3902016-08-0808 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Request for Measurement Uncertainty Recapture (Mur) Power Uprate (from 3486 Mwt to 3544 Mwt) ML16194A3702016-07-11011 July 2016 Notification of NRC Triennial Heat Sink Performance Inspection 05000397/2016003 and Request for Information ML16069A3592016-03-0909 March 2016 NRR E-mail Capture - Second Round Rais: Columbia MF6042 LAR TSTF-425 ML16061A5542016-03-0101 March 2016 Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information ML16061A5662016-03-0101 March 2016 Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information ML15254A2572015-09-16016 September 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1 Seismic Reevaluations ML15215A0432015-08-18018 August 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations ML14262A3412014-09-24024 September 2014 Request for Additional Information, Round 2, License Amendment Request to Revise TS Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High ML14192B0312014-08-13013 August 2014 Redacted, Request for Additional Information, Nrr/Dss/Scvb, Request to Modify Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows ML14206A0112014-07-31031 July 2014 Request for Additional Information, License Amendment Request to Revise TS Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High 2024-01-10
[Table view] |
Text
July 2, 2010 Mr. W.S. Oxenford, Vice President, Nuclear Generation and Chief Nuclear Officer Columbia Generating Station Energy Northwest MD PE08 P.O. Box 968 Richland, WA 99352
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NO. ME3121)
Dear Mr. Oxenford:
By letter dated January 19, 2010, Energy Northwest submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew Operating License NPF-21 for Columbia Generating Station for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and the associated Environmental Report. The staff has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Mr. Abbas Mostala. A mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3748 or by e-mail at daniel.doyle@nrc.gov.
Sincerely,
/RA/
Daniel Doyle, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
As stated cc w/encl: See next page
ML101750655 OFFICE PM:RPB1:DLR LA:DLR BC:RPB1:DLR PM:RPB1:DLR NAME DDoyle SFigueroa BPham DDoyle DATE 7/1/10 7/1/10 7/1/10 7/2/10
Letter to W.S. Oxenford from Daniel Doyle dated July 2, 2010
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NO. ME3121)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource
EGettys DDoyle FLyon WWalker, RIV RCohen, RIV LSubin, OGC
Columbia Generating Station cc:
Mr. J.V. Parrish, Chief Executive Officer EFSEC Manager Energy Northwest Energy Facility Site Evaluation Council MD 1023 P.O. Box 43172 P.O. Box 968 Olympia, WA 98504-3172 Richland, WA 99352-0968 Mr. Abbas Mostala Mr. S. K. Gambhir Energy Northwest Energy Northwest P.O. Box 968 MD PE04 MD PE 29 P.O. Box 968 Richland, WA 99352-0968 Richland, WA 99352-0968 Mr. Douglas W. Coleman, Manager, Regulatory Programs Energy Northwest P.O. Box 968 MD PE20 Richland, WA 99352-0968 Mr. William A. Horin, Esq.
Winston and Strawn 1700 K Street, NW Washington, DC 20006-3817 Chairman, Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190 Mr. Richard Cowley Washington State Department of Health 111 Israel Road, SE Tumwater, WA 98504-7827 Mr. Ron Cohen U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, WA 99352 Regional Administrator U.S. NRC Region IV Texas Health Resources Tower 612 E. Lamar Boulevard, Suite 400 Arlington, TX 76011-4125
Request for Additional Information For Columbia Generating Station License Renewal Environmental Review RAI 4.11-1 Request: Please provide a list of all known uranium fuel cycle facilities within a 50-mile radius of the Columbia Generating Station (CGS) site.
Background:
This information is requested to assist the staff in its preparation of section 4.11 on cumulative impacts.
RAI 2.1.3-1 Request: Section 3.1.2.1 of the ER describes the intake system including buried pipes that are approximately 900 feet long. Provide a reference point for the measurement of these pipelines.
Background:
ESRP 2.1.3 and CFR 51.53(c) direct NRC staff to prepare a section in the SEIS that provides a description of the circulating water system. In addition, a biological assessment and essential fish habitat assessment has to be prepared to fulfill consultation requirements with U.S. Fish and Wildlife Service and the National Marine Fisheries Service. During discussions at the site audit, further information was provided by the applicant on the coordinates for the approximate location of the intake and discharge structures in the river. However, the coordinates do not match the description in the ER.
RAI 5.1.3-1 Request: Based on review of documents provided during the site audit, provide documentation describing Energy Northwest's cultural resources protection procedures for conducting work in undisturbed, disturbed and culturally sensitive areas and for inadvertent discoveries of human remains or archaeological material. Additionally, based on discussions held during the site audit and per Tribal request, provide documentation describing the cultural resources qualifications of the Cultural Resources Program Representative that oversees cultural resource compliance issues at CGS, as well as training on artifact/archaeological site identification and cultural resources protection for CGS site-wide personnel.
Background:
ESRP 5.1.3 directs the staff to consider the impacts of operation on significant historic properties and the adequacy of proposed methods to mitigate any adverse impacts on these resources. Where appropriate, review operating procedures that would mitigate predicted adverse impacts. The review should be of sufficient detail to enable the reviewer to predict and assess potential impacts and to evaluate how these impacts should be treated in the licensing process. During the site audit, efforts to avoid adverse impacts to specific sites were discussed, along with the need to document specific actions that would be taken at individual sites.
ENCLOSURE
RAI 3.2-1 Request: Section 3.1.5 of the ER references Regulatory Order 672, which limits air emissions from CGS to below regulatory thresholds (EFSEC 1996). Provide a list of air emission sources that are permitted under Order 672, as well as the associated annual air emissions (pollutant and amount) for the most recent five years.
Background:
ESRP 3.2 directs NRC staff to prepare a section in the SEIS that provides background information to be used in evaluating air quality. 10 CFR 51.45(d) states that the environmental report shall also include a discussion of the status of compliance with applicable environmental quality standards and requirementswhich have been imposed by Federal, State, regional, and local agencies having responsibility for environmental protection.