MONTHYEARML1009205462010-03-31031 March 2010 Comment (1) of John D. Greenhill on Behalf of Himself Regarding Re-Licensing of Columbia Generating Station Project stage: Request ML1009800622010-03-31031 March 2010 Comment (2) of Jerome Delvin Supporting Columbia Generating Stations License Renewal Project stage: Other ML1010406752010-04-0202 April 2010 Comment (3) of David V. Taylor, Et. Al., on Behalf of Washington State Legislature, Supporting Energy Northwests License Renewal for Columbia Generating Station to Extend Operating License Through 2043 Project stage: Other ML1012410372010-04-0606 April 2010 Transcript of Columbia Generating Station License Renewal Process and Environmental Scoping Public Meeting, Evening Session, 04/06/2010, Pages 1-30 Project stage: Meeting ML1010503072010-04-0606 April 2010 Comment (4) of James O. Luce, on Behalf of Washington State Energy Facility Site Evaluation Council, on Columbia Generating Station License Renewal Application Project stage: Other ML1019605472010-04-0606 April 2010 License Renewal, Written Comments of Gene Kinsey from Public Scoping Meeting Project stage: Meeting ML1012410022010-04-0606 April 2010 Transcript of Columbia Generating Station License Renewal Process and Environmental Scoping Public Meeting, Afternoon Session, April 06/2010, Pages 1-39 Project stage: Meeting ML1011100522010-04-0707 April 2010 Comment (5) of Brad Peck, Rick Miller, & Robert E. Koch Supporting Energy Northwests Columbia Generating Station License Renewal Application to the Nuclear Regulatory Commission Project stage: Request ML1011604352010-04-0909 April 2010 G20100244/LTR-10-0176/EDATS: SECY-2010-0219 - Ltr., Russell Jim, Storage of Spent Power Reactor Fuel at Columbia Generating Station Project stage: Request ML1011100532010-04-0909 April 2010 Comment (6) of Tim Sheldon Supporting Renewal of the Operating License for the Columbia Generating Station Project stage: Request ML1011100542010-04-12012 April 2010 Comment (7) of Larry Haler and Brad Klippert on Behalf of the Wa House of Representatives Supporting License Renewal of the Columbia Generating Station Operated by Energy Northwest Project stage: Other ML1011700562010-04-12012 April 2010 Comment (8) of Washington State Senate, Supporting License Renewal of Columbia Generating Station Operated by Energy Northwest Project stage: Other ML1011804592010-04-19019 April 2010 Comment (9) of Senator Phil Rockefeller, Washington State Adding His Voice to Those Strongly Supporting Relicensing of Columbia Generating Station as an Essential Asset in Washingtons Energy Resources Project stage: Request ML1032300482010-04-21021 April 2010 Comment (11) of Various Individuals on Behalf of Energy Northwest Re Environmental Review of Columbia Generating Stations License Renewal Project stage: Other ML1012503142010-05-10010 May 2010 Meeting Summary-CGS License Renewal Overview and Environmental Scoping Meetings Project stage: Meeting ML1012505192010-05-10010 May 2010 Summary of Public License Renewal Overview and Environmental Scoping Meetings Related to the Review of the Columbia Generating Station License Renewal Application Project stage: Meeting ML1014600592010-05-14014 May 2010 Comment (10) of Gary Robertson on Behalf of Washington State, Department of Health, on Environmental Review of Columbia Generating Stations License Renewal Project stage: Other ML1017604212010-07-0101 July 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - SAMA Review Project stage: RAI ML1017506552010-07-0202 July 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - Environmental Review Project stage: RAI ML1018100912010-07-0808 July 2010 Request for Additional Information Related to the Environmental Site Audit for Columbia Generating Station License Renewal Project stage: RAI ML1018802892010-07-15015 July 2010 June 28, 2010, Summary of Telephone Conference Call Held Between NRC and Energy Northwest Concerning Draft Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application Project stage: Draft RAI GO2-10-105, Response to Request for Additional Information License Renewal Application2010-08-0505 August 2010 Response to Request for Additional Information License Renewal Application Project stage: Response to RAI ML1023802882010-08-0909 August 2010 Response to Request for Additional Information License Renewal Application, Enclosure B, Terrestrial Ecology Documents Project stage: Response to RAI GO2-10-108, Response to Request for Additional Information, License Renewal Application2010-08-0909 August 2010 Response to Request for Additional Information, License Renewal Application Project stage: Response to RAI ML1021003032010-08-10010 August 2010 Schedule Revision for the Environmental Review of the Columbia Generating Station License Renewal Application Project stage: Approval GO2-10-138, Response to Request for Additional Information on License Renewal Application2010-09-17017 September 2010 Response to Request for Additional Information on License Renewal Application Project stage: Response to RAI ML1026302282010-10-0101 October 2010 Summary of Tribal Outreach Informational Meeting Concerning Columbia Generating Station License Renewal and Hanford Low Level Waste Project stage: Meeting ML1028709842010-11-10010 November 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application-Sama Review Project stage: RAI ML1035106682010-12-17017 December 2010 E-mail Dtd 12/17/2010, Subj: NRC Ba/Efh Assessment for Columbia Generating Station License Renewal Review Project stage: Other GO2-10-178, Response to Request for Additional Information License Renewal Application2010-12-21021 December 2010 Response to Request for Additional Information License Renewal Application Project stage: Response to RAI ML1027702322010-12-29029 December 2010 Issuance of Environmental Scoping Summary Report Associated with the Staffs Review of the Application by Energy Northwest for Renewal of the Operating License for Columbia Generating Station Project stage: Approval ML1034305262011-01-10010 January 2011 Schedule Revision for the Review of the Columbia Generating Station License Renewal Application Project stage: Approval ML1034001632011-01-18018 January 2011 Summary of Site Visit in Support of the Environmental Review of the License Renewal Application for Columbia Generating Station Project stage: Approval ML1101805242011-01-18018 January 2011 License Renewal, e-mail Dated 1/18/2011 Project stage: Other GO2-11-032, Response to Request for Additional Information for the Review of the License Renewal Application2011-01-28028 January 2011 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI GO2-11-025, Response to Request for Additional Information on License Renewal Application2011-01-28028 January 2011 Response to Request for Additional Information on License Renewal Application Project stage: Response to RAI ML1104005102011-03-0101 March 2011 1/19/11 Summary of Telephone Conference Call Held Between USNRC and Energy Northwest Concerning Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application Project stage: RAI ML1106703792011-03-10010 March 2011 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - Severe Accident Mitigation Alternative Review Project stage: RAI GO2-11-082, Environmental Authorizations for CGS Operations2011-04-20020 April 2011 Environmental Authorizations for CGS Operations Project stage: Request GO2-11-092, Response to Request for Additional Information Related to the Review of the Severe Accident Mitigation Alternative Analysis2011-05-0606 May 2011 Response to Request for Additional Information Related to the Review of the Severe Accident Mitigation Alternative Analysis Project stage: Response to RAI ML11157A0362011-06-0505 June 2011 Letter from Heart of America Northwest Public Involvement Lists and Notices, Including Requests to Be Added to Lists and Requests for Hearings on the Draft EIS for Columbia Generating Station Project stage: Request ML1116001872011-06-0909 June 2011 E-mail Dtd 6/9/11, Subj: Energy Nw, Columbia Generating Station Public Involvement and Notice List, Request for Hearings Re EIS Project stage: Other ML11151A2222011-06-14014 June 2011 Schedule Revision for the Environmental Review of the Columbia Generating Station License Renewal Application Project stage: Approval ML1116802212011-06-16016 June 2011 Request for List of Protected Species within the Area Under Evaluation for the Columbia Generating Station License Renewal Application Review Project stage: Request ML1117501882011-06-23023 June 2011 Environmental Authorizations for Current CGS Operations Project stage: Other ML1118219752011-06-27027 June 2011 E-mail Dtd 6/27/2011, Subj: NRC Ba/Efh Assessment for Columbia Generating Station License Renewal Review Project stage: Other ML11165A0232011-08-23023 August 2011 Biological Assessment and Essential Fish Habitat Assessment for License Renewal of Columbia Generating Station Project stage: Other ML11214A2372011-08-30030 August 2011 RAI for the Review of the Columbia Generating Station LRA-Severe Accident Mitigation Alternative Review Project stage: RAI ML11227A0072011-08-31031 August 2011 NUREG-1437 Supp 47 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Columbia Generating Station. Project stage: Acceptance Review ML11252B0532011-09-0101 September 2011 Comment (1) of Robert G. Whitlam, on Behalf of Washington Dept of Archaeology & Historic Preservation Columbia Generating Station License Renewal Project stage: Other 2010-08-10
[Table View] |
Text
July 2, 2010 Mr. W.S. Oxenford, Vice President, Nuclear Generation and Chief Nuclear Officer Columbia Generating Station Energy Northwest MD PE08 P.O. Box 968 Richland, WA 99352
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NO. ME3121)
Dear Mr. Oxenford:
By letter dated January 19, 2010, Energy Northwest submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew Operating License NPF-21 for Columbia Generating Station for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and the associated Environmental Report. The staff has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Mr. Abbas Mostala. A mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3748 or by e-mail at daniel.doyle@nrc.gov.
Sincerely,
/RA/
Daniel Doyle, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
As stated cc w/encl: See next page
ML101750655 OFFICE PM:RPB1:DLR LA:DLR BC:RPB1:DLR PM:RPB1:DLR NAME DDoyle SFigueroa BPham DDoyle DATE 7/1/10 7/1/10 7/1/10 7/2/10
Letter to W.S. Oxenford from Daniel Doyle dated July 2, 2010
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC NO. ME3121)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource EGettys DDoyle FLyon WWalker, RIV RCohen, RIV LSubin, OGC
Columbia Generating Station cc:
Mr. J.V. Parrish, Chief Executive Officer Energy Northwest MD 1023 P.O. Box 968 Richland, WA 99352-0968 Mr. S. K. Gambhir Energy Northwest MD PE04 P.O. Box 968 Richland, WA 99352-0968 Mr. Douglas W. Coleman, Manager, Regulatory Programs Energy Northwest P.O. Box 968 MD PE20 Richland, WA 99352-0968 Mr. William A. Horin, Esq.
Winston and Strawn 1700 K Street, NW Washington, DC 20006-3817 Chairman, Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190 Mr. Richard Cowley Washington State Department of Health 111 Israel Road, SE Tumwater, WA 98504-7827 Mr. Ron Cohen U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, WA 99352 Regional Administrator U.S. NRC Region IV Texas Health Resources Tower 612 E. Lamar Boulevard, Suite 400 Arlington, TX 76011-4125 EFSEC Manager Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172 Mr. Abbas Mostala Energy Northwest P.O. Box 968 MD PE 29 Richland, WA 99352-0968
ENCLOSURE Request for Additional Information For Columbia Generating Station License Renewal Environmental Review RAI 4.11-1 Request: Please provide a list of all known uranium fuel cycle facilities within a 50-mile radius of the Columbia Generating Station (CGS) site.
Background:
This information is requested to assist the staff in its preparation of section 4.11 on cumulative impacts.
RAI 2.1.3-1 Request: Section 3.1.2.1 of the ER describes the intake system including buried pipes that are approximately 900 feet long. Provide a reference point for the measurement of these pipelines.
Background:
ESRP 2.1.3 and CFR 51.53(c) direct NRC staff to prepare a section in the SEIS that provides a description of the circulating water system. In addition, a biological assessment and essential fish habitat assessment has to be prepared to fulfill consultation requirements with U.S. Fish and Wildlife Service and the National Marine Fisheries Service. During discussions at the site audit, further information was provided by the applicant on the coordinates for the approximate location of the intake and discharge structures in the river. However, the coordinates do not match the description in the ER.
RAI 5.1.3-1 Request: Based on review of documents provided during the site audit, provide documentation describing Energy Northwest's cultural resources protection procedures for conducting work in undisturbed, disturbed and culturally sensitive areas and for inadvertent discoveries of human remains or archaeological material. Additionally, based on discussions held during the site audit and per Tribal request, provide documentation describing the cultural resources qualifications of the Cultural Resources Program Representative that oversees cultural resource compliance issues at CGS, as well as training on artifact/archaeological site identification and cultural resources protection for CGS site-wide personnel.
Background:
ESRP 5.1.3 directs the staff to consider the impacts of operation on significant historic properties and the adequacy of proposed methods to mitigate any adverse impacts on these resources. Where appropriate, review operating procedures that would mitigate predicted adverse impacts. The review should be of sufficient detail to enable the reviewer to predict and assess potential impacts and to evaluate how these impacts should be treated in the licensing process. During the site audit, efforts to avoid adverse impacts to specific sites were discussed, along with the need to document specific actions that would be taken at individual sites.
RAI 3.2-1 Request: Section 3.1.5 of the ER references Regulatory Order 672, which limits air emissions from CGS to below regulatory thresholds (EFSEC 1996). Provide a list of air emission sources that are permitted under Order 672, as well as the associated annual air emissions (pollutant and amount) for the most recent five years.
Background:
ESRP 3.2 directs NRC staff to prepare a section in the SEIS that provides background information to be used in evaluating air quality. 10 CFR 51.45(d) states that the environmental report shall also include a discussion of the status of compliance with applicable environmental quality standards and requirementswhich have been imposed by Federal, State, regional, and local agencies having responsibility for environmental protection.