Letter Sequence RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
Results
Other: ML100980062, ML101040675, ML101050307, ML101110054, ML101170056, ML101460059, ML103230048, ML103510668, ML110180524, ML111600187, ML11165A023, ML111750188, ML111821975, ML11252B053, ML11291A157, ML11307A393, ML11335A127, ML12044A329, ML12081A275, ML12082A209, ML12181A020
|
MONTHYEARML1009205462010-03-31031 March 2010 Comment (1) of John D. Greenhill on Behalf of Himself Regarding Re-Licensing of Columbia Generating Station Project stage: Request ML1009800622010-03-31031 March 2010 Comment (2) of Jerome Delvin Supporting Columbia Generating Stations License Renewal Project stage: Other ML1010406752010-04-0202 April 2010 Comment (3) of David V. Taylor, Et. Al., on Behalf of Washington State Legislature, Supporting Energy Northwests License Renewal for Columbia Generating Station to Extend Operating License Through 2043 Project stage: Other ML1012410372010-04-0606 April 2010 Transcript of Columbia Generating Station License Renewal Process and Environmental Scoping Public Meeting, Evening Session, 04/06/2010, Pages 1-30 Project stage: Meeting ML1010503072010-04-0606 April 2010 Comment (4) of James O. Luce, on Behalf of Washington State Energy Facility Site Evaluation Council, on Columbia Generating Station License Renewal Application Project stage: Other ML1019605472010-04-0606 April 2010 License Renewal, Written Comments of Gene Kinsey from Public Scoping Meeting Project stage: Meeting ML1012410022010-04-0606 April 2010 Transcript of Columbia Generating Station License Renewal Process and Environmental Scoping Public Meeting, Afternoon Session, April 06/2010, Pages 1-39 Project stage: Meeting ML1011100522010-04-0707 April 2010 Comment (5) of Brad Peck, Rick Miller, & Robert E. Koch Supporting Energy Northwests Columbia Generating Station License Renewal Application to the Nuclear Regulatory Commission Project stage: Request ML1011604352010-04-0909 April 2010 G20100244/LTR-10-0176/EDATS: SECY-2010-0219 - Ltr., Russell Jim, Storage of Spent Power Reactor Fuel at Columbia Generating Station Project stage: Request ML1011100532010-04-0909 April 2010 Comment (6) of Tim Sheldon Supporting Renewal of the Operating License for the Columbia Generating Station Project stage: Request ML1011100542010-04-12012 April 2010 Comment (7) of Larry Haler and Brad Klippert on Behalf of the Wa House of Representatives Supporting License Renewal of the Columbia Generating Station Operated by Energy Northwest Project stage: Other ML1011700562010-04-12012 April 2010 Comment (8) of Washington State Senate, Supporting License Renewal of Columbia Generating Station Operated by Energy Northwest Project stage: Other ML1011804592010-04-19019 April 2010 Comment (9) of Senator Phil Rockefeller, Washington State Adding His Voice to Those Strongly Supporting Relicensing of Columbia Generating Station as an Essential Asset in Washingtons Energy Resources Project stage: Request ML1032300482010-04-21021 April 2010 Comment (11) of Various Individuals on Behalf of Energy Northwest Re Environmental Review of Columbia Generating Stations License Renewal Project stage: Other ML1012503142010-05-10010 May 2010 Meeting Summary-CGS License Renewal Overview and Environmental Scoping Meetings Project stage: Meeting ML1012505192010-05-10010 May 2010 Summary of Public License Renewal Overview and Environmental Scoping Meetings Related to the Review of the Columbia Generating Station License Renewal Application Project stage: Meeting ML1014600592010-05-14014 May 2010 Comment (10) of Gary Robertson on Behalf of Washington State, Department of Health, on Environmental Review of Columbia Generating Stations License Renewal Project stage: Other ML1017604212010-07-0101 July 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - SAMA Review Project stage: RAI ML1017506552010-07-0202 July 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - Environmental Review Project stage: RAI ML1018100912010-07-0808 July 2010 Request for Additional Information Related to the Environmental Site Audit for Columbia Generating Station License Renewal Project stage: RAI ML1018802892010-07-15015 July 2010 June 28, 2010, Summary of Telephone Conference Call Held Between NRC and Energy Northwest Concerning Draft Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application Project stage: Draft RAI GO2-10-105, Response to Request for Additional Information License Renewal Application2010-08-0505 August 2010 Response to Request for Additional Information License Renewal Application Project stage: Response to RAI ML1023802882010-08-0909 August 2010 Response to Request for Additional Information License Renewal Application, Enclosure B, Terrestrial Ecology Documents Project stage: Response to RAI GO2-10-108, Response to Request for Additional Information, License Renewal Application2010-08-0909 August 2010 Response to Request for Additional Information, License Renewal Application Project stage: Response to RAI ML1021003032010-08-10010 August 2010 Schedule Revision for the Environmental Review of the Columbia Generating Station License Renewal Application Project stage: Approval GO2-10-138, Response to Request for Additional Information on License Renewal Application2010-09-17017 September 2010 Response to Request for Additional Information on License Renewal Application Project stage: Response to RAI ML1026302282010-10-0101 October 2010 Summary of Tribal Outreach Informational Meeting Concerning Columbia Generating Station License Renewal and Hanford Low Level Waste Project stage: Meeting ML1028709842010-11-10010 November 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application-Sama Review Project stage: RAI ML1035106682010-12-17017 December 2010 E-mail Dtd 12/17/2010, Subj: NRC Ba/Efh Assessment for Columbia Generating Station License Renewal Review Project stage: Other GO2-10-178, Response to Request for Additional Information License Renewal Application2010-12-21021 December 2010 Response to Request for Additional Information License Renewal Application Project stage: Response to RAI ML1027702322010-12-29029 December 2010 Issuance of Environmental Scoping Summary Report Associated with the Staffs Review of the Application by Energy Northwest for Renewal of the Operating License for Columbia Generating Station Project stage: Approval ML1034305262011-01-10010 January 2011 Schedule Revision for the Review of the Columbia Generating Station License Renewal Application Project stage: Approval ML1034001632011-01-18018 January 2011 Summary of Site Visit in Support of the Environmental Review of the License Renewal Application for Columbia Generating Station Project stage: Approval ML1101805242011-01-18018 January 2011 License Renewal, e-mail Dated 1/18/2011 Project stage: Other GO2-11-032, Response to Request for Additional Information for the Review of the License Renewal Application2011-01-28028 January 2011 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI GO2-11-025, Response to Request for Additional Information on License Renewal Application2011-01-28028 January 2011 Response to Request for Additional Information on License Renewal Application Project stage: Response to RAI ML1104005102011-03-0101 March 2011 1/19/11 Summary of Telephone Conference Call Held Between USNRC and Energy Northwest Concerning Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application Project stage: RAI ML1106703792011-03-10010 March 2011 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - Severe Accident Mitigation Alternative Review Project stage: RAI GO2-11-082, Environmental Authorizations for CGS Operations2011-04-20020 April 2011 Environmental Authorizations for CGS Operations Project stage: Request GO2-11-092, Response to Request for Additional Information Related to the Review of the Severe Accident Mitigation Alternative Analysis2011-05-0606 May 2011 Response to Request for Additional Information Related to the Review of the Severe Accident Mitigation Alternative Analysis Project stage: Response to RAI ML11157A0362011-06-0505 June 2011 Letter from Heart of America Northwest Public Involvement Lists and Notices, Including Requests to Be Added to Lists and Requests for Hearings on the Draft EIS for Columbia Generating Station Project stage: Request ML1116001872011-06-0909 June 2011 E-mail Dtd 6/9/11, Subj: Energy Nw, Columbia Generating Station Public Involvement and Notice List, Request for Hearings Re EIS Project stage: Other ML11151A2222011-06-14014 June 2011 Schedule Revision for the Environmental Review of the Columbia Generating Station License Renewal Application Project stage: Approval ML1116802212011-06-16016 June 2011 Request for List of Protected Species within the Area Under Evaluation for the Columbia Generating Station License Renewal Application Review Project stage: Request ML1117501882011-06-23023 June 2011 Environmental Authorizations for Current CGS Operations Project stage: Other ML1118219752011-06-27027 June 2011 E-mail Dtd 6/27/2011, Subj: NRC Ba/Efh Assessment for Columbia Generating Station License Renewal Review Project stage: Other ML11165A0232011-08-23023 August 2011 Biological Assessment and Essential Fish Habitat Assessment for License Renewal of Columbia Generating Station Project stage: Other ML11214A2372011-08-30030 August 2011 RAI for the Review of the Columbia Generating Station LRA-Severe Accident Mitigation Alternative Review Project stage: RAI ML11227A0072011-08-31031 August 2011 NUREG-1437 Supp 47 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Columbia Generating Station. Project stage: Acceptance Review ML11252B0532011-09-0101 September 2011 Comment (1) of Robert G. Whitlam, on Behalf of Washington Dept of Archaeology & Historic Preservation Columbia Generating Station License Renewal Project stage: Other 2010-08-10
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 30, 2011 Mr. David A. Swank Vice President, Engineering Columbia Generating Station Energy Northwest MD PE23 P. O. Box 968 Richland, WA 99352
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION SEVERE ACCIDENT MITIGATION ALTERNATIVE REVIEW (TAC NO. ME3121)
Dear Mr. Swank:
By letter dated January 19, 2010, Energy Northwest submitted an application to the U.S. Nuclear Regulatory Commission (NRC or the staff) to renew Operating License NPF-21 for Columbia Generating Station pursuant to Title 10 of the Code of Federal Regulations Part 54.
The NRC staff is reviewing the information contained in the license renewal application and the associated environmental report. The staff has identified, in the enclosure, areas where additional information is needed to complete the Severe Accident Mitigation Alternatives review.
Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Mr. Abbas Mostala. A mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3748 or bye-mail at daniel.doyle@nrc.gov.
Sincerely,
.~
Daniel Doyle, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosure:
As stated cc w/encl: Listserv
Request for Additional Information Regarding the Analysis of Severe Accident Mitigation Alternatives for the Columbia Generating Station License Renewal Review
Background:
In its letter dated January 28, 2011 (ADAMS Accession Number ML110330395), Energy Northwest identified Severe Accident Mitigation Alternative (SAMA) candidate FL-06R as potentially cost-beneficial.
In the January 28th letter, there were several different descriptions of SAMA FL-06R:
- "Add additional [nondestructive examination (NDE)] and inspections to increase probability of detecting degraded lines in raw water systems in the Control Building."
(page 6 of 173)
- "Improve control building flooding scenarios" (page 19 of 173)
- "Perform additional NDE and inspections to the three lines identified in SAM A candidate FL-04R to verify that degradation is not occurring in these lines. The specific locations of the NDE would be selected from potentially susceptible areas using similar methods as used in the risk-informed in-service inspection program to detect wall thinning."
(pages 119 and 120 of 173)
- "Perform additional NDE and inspections of the [service water (SW), turbine service water (TSW), and fire protection (FP)] lines in the Control Building area of the Radwaste Building." (page 167 of 173)
Issue:
Based on the descriptions of SAMA FL-06R, it appears to relate to managing the effects of aging.
Potentially cost-beneficial SAMAs that relate to adequately managing the effects of aging may be mandated by the NRC as part of license renewal pursuant to 10 CFR Part 54.
Requests:
RAI1:
Provide a determination as to whether the affected structures, systems, or components (SSCs) identified in the SAMA candidate are within the scope of the license renewal safety review under 10 CFR Part 54. If they are within the scope of license renewal, explain how the NDE and inspections proposed in SAMA FL-06R differ from the aging management programs proposed for the same SSCs in the safety portion of the license renewal application (e.g., SW and FP systems).
ENCLOSURE
- 2 RAI2:
The SAMAs listed below were identified as potentially cost-beneficial in the January 2Sth letter.
Energy Northwest stated that all these SAMA candidates will be considered for implementation through the normal processes for evaluating possible plant changes at Columbia Generating Station as described in response to RAI 6.j-1 iv. For each of the 16 potentially cost-beneficial SAMAs, provide a determination and rationale (basis) as to whether the SAMA relates to managing the effects of aging.
SAMAID SAMA Description ACIDC-2S Reduce common cause failures between EOG-3 and EOG-1/2 CC-03b Raise reactor core isolation cooling system backpressure trip setpoints FR-07a Improve the fire resistance of critical cables for containment venting FR-07b Improve the fire resistance of critical cables for transformer E-TR-6 FR-OS Improve the fire resistance of cables to residual heat removal and standby SW HV-02 Provide a redundant train or means of ventilation SR-05R Improve seismic ruggedness of MCC-7F and MCC-SF FL-05R Clamp on flow instruments to certain drain lines in the control building of the radwaste building and alarm in the control room FL-04R Add one isolation valve in the SW, turbine SW, and fire protection lines in the control building area of the radwaste building FL-06R Additional non-destructive evaluation and inspections to increase probability of detecting degraded lines in raw water systems in the Control Building CC-24R Backfeed the HPCS system with emergency bus SM-S to provide a third power source for HPCS CC-25R Enhance alternate injection reliability by including residual heat removal service water and fire water crosstie in maintenance program OT-07R Increase operator training on systems and operator actions determined to be important from the PSA FW-05R Examine the potential for operators to control reactor feedwater and avoid a reactor trip OT-09R For the non-LOCA initiating events, credit the Z (power conversion system recovery) function FR-11R Install early fire detection in the following analysis units: RC-02, RC-03, RC-04, RC-05, RC-07, RC-OS, RC-11, RC-13, RC-14, and RC-1A
ML11214a237 I OFFICE LA:DLR NAME IKing 8/29/11 8130/11
! DATE 8/4/11
Letter to D. Swank from D. Doyle dated August 30, 2011
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION SEVERE ACCIDENT MITIGATION ALTERNATIVE REVIEW (TAC NO. ME3121)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource ACunanan DDoyle MThadani WWalker, RIV RCohen, RIV LSubin,OGC