Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000397/2022401
ML22145A446
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/06/2022
From: Pick A
NRC Region 4
To: Schuetz R
Energy Northwest
References
IR 2022401
Download: ML22145A446 (8)


See also: IR 05000397/2022401

Text

June 6, 2022

Mr. Robert Schuetz

Chief Executive Officer

Energy Northwest

MD 1023

76 North Power Plant Loop

P.O. Box 968

Richland, WA 99352

SUBJECT: COLUMBIA GENERATING STATION - INFORMATION REQUEST FOR THE

CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM

INSPECTION 05000397/2022401

Dear Mr. Robert Schuetz,

On October 3, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0

at your Columbia Generating Station. The inspection will be performed to evaluate and verify

your ability to meet the requirements of the NRCs Cyber-Security Rule, Title 10, Code of

Federal Regulations (CFR), Part 73, Section 54, Protection of Digital Computer and

Communication Systems and Networks. The onsite portion of the inspection will take place

during the week of October 3, 2022.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to

ensure a productive inspection for both parties, we have enclosed a request for documents

needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber-security inspection procedure. This

information should be made available via electronic means (e.g., compact disc or other

electronic means) and delivered to the regional office no later than July 11, 2022. The

inspection team will review this information and, by August 8, 2022, will request the specific

items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,

and the areas of your cyber security program selected for the cyber-security inspection. This

information will be requested for review in the regional office prior to the inspection by

September 5, 2022.

R. Schuetz

2

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, October 3, 2022.

The fourth group of information is necessary to aid the inspection team in tracking issues

identified during the inspection. It is requested that this information be provided to the lead

inspector as the information is generated during the inspection. It is important that these

documents are up to date and complete to minimize the number of additional documents

requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Greg Pick. We understand that our regulatory contact

for this inspection is Dan Cook of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at 817-504-2105 or via

e-mail at greg.pick@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Greg Pick, Senior Reactor Inspector

Engineering Branch 2

Division of Operating Reactor Safety

Docket Nos. 50-397

License Nos. NPF-21

Enclosure:

Columbia Generating Station

Cyber-Security Inspection Document Request

Distribution via Listserv

Signed by Pick, Gregory

on 06/06/22

Enclosure

Inspection Report: 05000397/2022401

Inspection Dates:

October 3 - 8, 2022

Inspection Procedure:

IP 71130.10, Cyber-Security, Revision 0

Reference:

ML21330A088, Guidance Document for Development of the

Request for Information (RFI) and Notification Letter for

Full-Implementation of the Cyber-Security Inspection, Revision 1

NRC Inspectors:

Greg Pick, (Lead)

Marcus Chisolm

817-504-2105

817-200-1426

greg.pick@nrc.gov

marcus.chisolm@nrc.gov

Nnaerika Okonkwo

817-200-1114

nnaerika.okonkwo@nrc.gov

NRC Contractors:

Balla Barro

Alan Konkal

balla.barro@nrc.gov

alan.konkal@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (Table RFI#1) provides the team with the general

information necessary to select appropriate components and cyber security program

elements to develop a site-specific inspection plan. The initial request for information is

used to identify the list of critical systems and critical digital assets plus operational and

management security control portions of the cyber security program to be chosen as the

sample set to be inspected. Please provide the information listed in Table RFI#1 to the

regional office by July 11, 2022, or sooner, to facilitate the selection of the specific items

that will be reviewed.

The team will examine the returned documentation from the initial request for information

and select specific critical systems and critical digital assets to provide for a more

deliberate, focused second request for information. The team will submit the second

request by August 8, 2022, which will identify the critical systems and critical digital

assets that will be utilized to evaluate the defensive architecture and the areas of your

cyber security program selected for the inspection. We request that the information for

the second request be made available for review by September 5, 2022.

All requests for information shall follow the referenced guidance document ADAMS

Accession No. ML21330A088. The preferred file format for all lists is a searchable Excel

spreadsheet file. The information should be indexed and hyper-linked to facilitate ease of

use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

2

Table RFI#1

Section 3,

Paragraph Number/Title:

IP Ref

1

A list of all Identified Critical Systems and Critical Digital Assets,-

highlight/note any . additions, deletions, reclassifications due to new

guidance from white papers, changes to NEI 10-04, 13-10, etc. since the

last cyber security inspection.

Overall

2

A list of EP and Security onsite and offsite digital communication systems

Overall

3

Network Topology Diagrams to include information and data flow for critical

systems in levels 2, 3 and 4 (If available)

Overall

4

Ongoing Monitoring and Assessment program documentation

03.01(a)

5

The most recent effectiveness analysis of the Cyber Security Program

03.01(b)

6

Vulnerability screening/assessment and scan program documentation

03.01(c)

7

Cyber Security Incident response documentation, including incident

detection, response, and recovery documentation as well as contingency

plan development, implementation and including any program

documentation that requires testing of security boundary device

functionality

03.02(a)

and

03.04(b)

8

Device Access and Key Control documentation

03.02(c)

9

Password/Authenticator documentation

03.02(c)

1

0

User Account/Credential documentation

03.02(d)

1

1

Portable Media and Mobile Device control documentation, including kiosk

security control assessment/documentation

03.02(e)

1

2

Design change/ modification program documentation and a List of all design

changes completed since the last cyber security inspection, including either

a summary of the design change or the 50.59 documentation for the

change.

03.03(a)

1

3

Supply Chain Management documentation including any security impact

analysis for new acquisitions

03.03(a),

(b) and

(c)

1

4

Configuration Management documentation including any security impact

analysis performed due to configuration changes since the last inspection

03.03(a)

and (b)

1

5

Cyber Security Plan and any 50.54(p) analysis to support changes to the

plan since the last inspection

03.04(a)

3

Table RFI#1

Section 3,

Paragraph Number/Title:

IP Ref

1

6

Cyber Security Metrics tracked (if applicable)

03.06 (b)

1

7

Provide documentation describing any cyber security changes to the access

authorization program since the last cyber security inspection.

Overall

1

8

Provide a list of all procedures and policies provided to the NRC with their

descriptive name and associated number (if available)

Overall

1

9

Performance testing report (if applicable)

03.06 (a)

In addition to the above information please provide the following:

(1) Electronic copy of the UFSAR and technical specifications

(2) Name(s) and phone numbers for the regulatory and technical contacts

(3) Current management and engineering organizational charts

II.

Additional Information Requested to be Available Prior to Inspection

As stated in Section I above, the team will examine the documentation requested from

Table RFI#1 and submit the list of critical systems and critical digital assets to your staff

by August 8, 2022 (i.e., RFI#2). The additional information requested for the specific

systems and equipment is identified in Table RFI#2. Please provide the Table RFI#2

information to the lead inspector by September 5, 2022. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table RFI#2

Section 3,

Paragraph Number/Title:

Items

For the system(s) chosen for inspection provide:

1

Ongoing Monitoring and Assessment activity performed on the system(s)

03.01(a)

2

All Security Control Assessments for the selected system(s)

03.01(a)

3

All vulnerability screenings/assessments associated with, or scans

performed on the selected system(s) since the last cyber security inspection

03.01(c)

4

Documentation (including configuration files and rules sets) for Network-

based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based

Intrusion Detection Systems (HIDS), and Security Information and Event

Management (SIEM) systems for system(s) chosen for inspection)

03.02(b)

4

Table RFI#2

Section 3,

Paragraph Number/Title:

Items

5

Documentation (including configuration files and rule sets) for intra-security

level firewalls and boundary devices used to protect the selected system(s)

03.02(c)

6

Copies of all periodic reviews of the access authorization list for the selected

systems since the last inspection

03.02(d)

7

Baseline configuration data sheets for the selected CDAs

03.03(a)

8

Documentation on any changes, including Security Impact Analyses,

performed on the selected system(s) since the last inspection

03.03(b)

9

Copies of the purchase order documentation for any new equipment

purchased for the selected systems since the last inspection

03.03(c)

1

0

Copies of any reports/assessment for cyber security drills performed since

the last inspection.

03.02(a)

03.04(b)

1

1

Copy of the individual recovery plan(s) for the selected system(s) including

documentation of the results the last time the backups were executed.

03.02(a)

03.04(b)

1

2

Corrective actions taken as a result of cyber security incidents/issues to

include previous NRC violations and Licensee Identified Violations since the

last cyber security inspection

03.04(d)

III.

Information Requested to be Available on First Day of Inspection

For the critical systems and critical digital assets identified in Section II, provide the

following request for information (i.e., Table 1ST Week Onsite) to the team by

October 3, 2022, the first day of the inspection.

Table 1ST Week Onsite

Section 3,

Paragraph Number/Title:

Items

1

Any cyber security event reports submitted in accordance with 10 CFR

73.77 since the last cyber security inspection

03.04(a)

2

Updated Copies of corrective actions taken as a result of cyber security

incidents/issues, to include previous NRC violations and Licensee Identified

Violations since the last cyber security inspection, as well as vulnerability-

related corrective actions

03.04(d)

5

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a.

Updated Final Safety Analysis Report (if not previously provided)

b.

Original FSAR Volumes

c.

Original SER and Supplements

d.

FSAR Question and Answers

e.

Quality Assurance Plan

f.

Technical Specifications (if not previously provided)

g.

Latest IPE/PRA Report

(2) Vendor Manuals, Assessment and Corrective Actions:

a.

The most recent Cyber-Security Quality Assurance (QA) audit and/or

self-assessment

b.

Corrective action documents (e.g., condition reports, including status of

corrective actions) generate because of the most recent Cyber-Security

Quality Assurance (QA) audit and/or self-assessment

IV.

Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated because of the inspection

teams questions or queries during the inspection

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member)

If you have any questions regarding the information requested, please contact the inspection

team leader.

ML22145A446

X SUNSI Review

By: GAP

ADAMS:

X Yes No

Sensitive

X Non-Sensitive

Non-Publicly Available

X Publicly Available

Keyword

NRC-002

OFFICE

RIV/DORS/EB2

DORS/EB2

NAME

MChisolm

GPick

SIGNATURE

/RA/

/RA/

DATE

6/6/2022

6/6/2022